LPS-01 PROJECT
Area
LPS-01 Date 10.02.2024 Time 08.00 PM
Location
Completed by Mark Signature
Items to be checked
1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear
2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height x 20 Site Storage x
Immediate
and waste removal at site.
2 Days
4 Days
1
√
Observed poor hazardouse waste Hazardous waste must be
Immediate Immediate
2 Days
4 Days
disposal. disposed in chemical waste
2 collection point at site.
4 Days
at B-01. provided, if not required
3 dismantle the scaffolding.
2 Days
4 Days
Observations Closeouts
Observed poor housekeeping at B-1. Ensure frequent housekeeping and waste removal
at site.
Observed poor hazardouse waste disposal. Hazardous waste must be disposed in chemical
waste collection point at site.
Found scaffolding without any tag at B-01. Ensure scaffolding tag must be provided, if not
required dismantle the scaffolding.
Inadequate edge protection at IDF room level-5. Ensure that edge protection provided properly.
Found hanging cables at level-5&6. Ensure all hanging cables should be tied up above
head levels to prevent injuries.
Found protruding threaed rods at lervel-6. Ensure that threaded rods are secured and rebar
caps shall be provided.