Items to be checked
1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear
2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x
Immediate
level 6 zone B electrical closed properly.
2 Days
4 Days
1 room.
√
Found damaged ladder at Damaged ladder removed
x Immediate
2 Days
4 Days
2 level-5. from site.
Observations Closeouts
Inadequate edge protection at level 6 zone B Ensure edge protections are closed properly.
electrical room.