Safety Inspection Report 15.02.2024 Hexatech
Safety Inspection Report 15.02.2024 Hexatech
LPS-01 PROJECT
Area
LPS-01 Date 15.02.2024 Time 08.00 PM
Location
Completed by Mark Signature
Items to be checked
1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear
2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x
Immediate
6. Zone C. lead cables are inspected prior to
2 Days
4 Days
use.
√
Foundprotruding threaded rod Provide caps for the protruding
2 Days
4 Days
without caps. threaded rods at level 5.
2
4 Days
fire hazard. location.
3
4 Days
4 Days
Observations Closeouts
Using damaged lead cables at level 6. Zone C. Removed from usage, ensure all lead cables are
inspected prior to use.
Foundprotruding threaded rod without caps. Provide caps for the protruding threaded rods at
level 5.
Found wooden debris at B-1, it’s a fire hazard. Ensure housekeeping at this location.
Observed poor waste disposal. Non hazardous Conduct awareness training to the work force
waste disposed in chemical waste skip. regarding proper waste disposal at site.
Found stagnant water at B-2. Ensure that stagnant water is removed from the
pit, otherwise it may impose penalty from UDC.