PROJECT MANAGEMENT DAILY SITE SAFETY REVIEW
‘sso rt ere werk hi mem ceed ya SA gee PA Span us Ht ene
‘Stearn arate nate sy ec pc ey sy Sa td test el
Pari ype Rateence CTR GACENFEID PTW
(teppiate)
ALONG 106 Sie riser PTR
ae Tie oaee Tae ESE
cam0n aes onset [warren noun 77], owll/
eesone 75 [nO | cone
Superson Ste? ¥ * Seta are Gate ba
Cont rene nice? « 2 rae eases
‘artifedand competent personnel on ste? (Crane | 2 Steiimatone
(Operator, Res, WAR, sett Supers, te)
Vida et Crane and other Fen
Equipe inspection Sticker ae pre se y
Inspection on ste?
Par pO ERATOR
(apoio)
“Seeeonce Si?
‘gon von satus)
‘i et een ben
‘oeoepniesod a Ty
"Tio oe i wa al aPROJECT MANAGEMENT.
(OMPPD) - DAILY CONTRACTOR ACTIVITIES PLANNING REVIEW
Note: The dally contractor activites planning review must be conducted between the SA projet team,
‘HSE representative and main contractor and cover all planned and unplanned activites forthe
respective day. The review must also cover all work being conducted by sub-contractors and work that
Isplonned outside of fcites (boundar
HAILONG 106
‘Oaroa 2033 (24 Fours)
‘MZ-GMPD
'112-19000
LAMPRELL a
HILONG OCENTRATNDE
ally Ae
Activities
Waldrg Ging ir Gouging Flame Gato,
evel fobveton work.
‘rg Opertonsting shin and Manoa
ana).
Personal ransers,SUMMARY OF PERMITS REVIEWED HAILONG 106
Work Permit Reviews MRIN Remarks ]
‘Number of active work locations or sites 1 MAIN DECK
‘Number of SA Work Permits Isued a ;
‘Number of Contractor Work Permits Issued a
3 Hot Work Permit 2AHours
(Cold Work Permit
‘Total Number of Permits reviewed by Project
Engineers / Superintendents / CSRs TOTAL-3 Contractor Work Permits
‘Number of Hot Work Permits Reviewed
3HotWorkPermit | 3 Contractor Work Permit
Nantes of ps eaves eviews? OCold Work Permit | 0 Contractor Work Permits
‘Number of Permit Reviews by OERCG (HSE) ae a
‘Number of Hot Work Permits Reviewed ae Wa
Number of Other Permits Reviewed WA WA
‘Number Plan of the Day Meetings (POD) Conducted Fi Fe San otEE ay