Professional Documents
Culture Documents
Job To Be Done 2017 For Sure
Job To Be Done 2017 For Sure
Job To Be Done 2017 For Sure
NEED TO REPLACE ALL 4 BALL VALVES AT THE HOT WATER CIRCULATION PUMPS SHIPYARD
CLEAN ALL FOUR CONDENSERS, REMOVE, CHECK AND REPLACE IF NECESSARY THE
HEIN HOPMAN
FLOW REGULATION VALVES TO THE CONDENSERS.