DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/1/2023 DAILY ACTIVITY REPORT: DAY 25 % DAYS ELAPSE: 21%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 3.97% 3.97% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 2.59% 2.59% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 0.84% 0.84% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68%

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 9.83% 13.46% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : S S S S F S S F S

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 7
40 Labor : 8
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Scaffoldings : 15
46 Ladder : 4
47 Shovel : 3
48 Bara : 4
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 8
55 Chainsaw : 6
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 Boulders : 10 cubic
60 1.5" GI Pipe Schd. 20 : 20
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 There was a fallen tree that is hazardous to cut Ask for the assistance of ERT
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/2/2023 DAILY ACTIVITY REPORT: DAY 26 % DAYS ELAPSE: 22%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.13% 4.13% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 2.70% 2.70% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 0.88% 0.88% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68%

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 10.12% 13.76% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : S S F S S F F S S

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 13
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Cyclone wire : 2
46 DB 10mm : 10
47 Welding rod :
48 Bara : 4
49 Shovel : 3
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 8
55 Chainsaw :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 Boulders : 10cubic
60 1.5" GI Pipe Schd. 20 : 10
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 There was a fallen tree that is hazardous to cut Ask for the assistance of ERT
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/3/2023 DAILY ACTIVITY REPORT: DAY 27 % DAYS ELAPSE: 23%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.28% 4.28% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 2.80% 2.80% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 0.91% 0.91% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68%

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 10.42% 14.06% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : S C C F F S F F F

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 13
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Cement : 7
46 Gravel : 14
47 Sand : 21
48 Bara : 4
49 Shovel : 3
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 8
55 Chainsaw : 6
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Stop work for Combatan due to ERT assessment of the Wait for the assessment of ERT
73 hazardous tree at the top of the dam
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/4/2023 DAILY ACTIVITY REPORT: DAY 28 % DAYS ELAPSE: 23%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.44% 4.44% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 2.91% 2.91% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 0.94% 0.94% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68%

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 10.72% 14.35% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F F S S S F F S S

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 14
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Cement : 18 Bags
46 Gravel : 36 Bags
47 Sand : 54 Bags
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Two Generator Set : 8
55 :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 Sand : 10 Cubic
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 There are trees identified that are hazardous for work Coordinate with ERT and Proponent
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/5/2023 DAILY ACTIVITY REPORT: DAY 29 % DAYS ELAPSE: 24%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.60% 4.60% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.01% 3.01% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 0.98% 0.98% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68%

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 11.01% 14.65% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F F F S S S F F S

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 7
40 Labor : 9
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Bara : 3
46 Shovel : 4
47 :
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 8
55 Breaker : 4
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 There is a presence of H2S in stucked in the ground while we Check the gas meter if it is safe to work.
73 were excavating
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/7/2023 DAILY ACTIVITY REPORT: DAY 30 % DAYS ELAPSE: 25%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.76% 4.76% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.11% 3.11% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.01% 1.01% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.00% 0.19% 0.19% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 11.31% 15.14% 3.83%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F C C C C R R

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 14
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Bara : 3
46 Pala : 4
47 Mace : 4
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Two Generator Set : 8
55 Breaker : 5
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 Sand : 10cubic
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Bad weather condition. It rained about 1345H Pullout from the area as per advice from the ERT
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/8/2023 DAILY ACTIVITY REPORT: DAY 31 % DAYS ELAPSE: 26%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 4.92% 4.92% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.22% 3.22% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.04% 1.04% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.19% 0.38% 0.19% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 11.80% 15.62% 3.83%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F F S S S F F S S

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 13
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Bara : 4
46 Pala : 3
47 Welding rods :
48 DB 10mm :
49 Mace : 4
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Two Generator Set : 8
55 Breaker : 4
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/9/2023 DAILY ACTIVITY REPORT: DAY 32 % DAYS ELAPSE: 27%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.08% 5.08% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.32% 3.32% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.08% 1.08% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.38% 0.58% 0.19% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 12.28% 16.11% 3.83%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : C C R R C C C

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 16
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Cement : 12 Bag
46 Gravel : 20 Bags
47 Sand : 30 Bags
48 Bara : 4
49 Pala : 3
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Two Generator Set : 5
55 Portabale welding Machine : 5
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72
We started late about 1045H due to earthquake and we had to Coordinate with the ERT, Proponent, and PEM if there is a visible
73
pause the work due to the rain movement of soil.
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/10/2023 DAILY ACTIVITY REPORT: DAY 33 % DAYS ELAPSE: 28%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.24% 5.24% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.42% 3.42% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.11% 1.11% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.58% 0.58% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 12.77% 16.41% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : C R R HR HR R R

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 10
40 Labor : 15
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Mace : 3
46 Shovel : 4
47 Alvenous :
48 Bara : 3
49 Scaffoldings :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 1
55 :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Bad weather condition Early pullout from the Area
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/11/2023 DAILY ACTIVITY REPORT: DAY 34 % DAYS ELAPSE: 28%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.39% 5.39% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.53% 3.53% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.15% 1.15% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.77% 0.77% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 13.26% 16.90% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : R R C C C C F F C

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 11
40 Labor : 15
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Mace : 3
46 Shovel : 3
47 Bara : 4
48 Alvenous :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Generator Set : 6
55 :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Wait for the rain to pass by.
Bad weather condition at first hours
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/12/2023 DAILY ACTIVITY REPORT: DAY 35 % DAYS ELAPSE: 29%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.55% 5.55% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.63% 3.63% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.18% 1.18% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 0.96% 0.96% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 0.00% 0.44% 0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 13.75% 17.38% 3.63%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : C R C C R C C C C

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 1
38 Foreman : 2
39 Skill : 11
40 Labor : 14
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Cable 25mm : 170m
46 Cable 5/16 inch : 340m
47 Lagaraw : 4
48 Cement : 3
49 Sand : 12
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Service Vehicle : 8
54 Two Generator Set : 5
55 Breaker : 5
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 The rain sprinkled mostly all day. Work stoppage if the rain is too heavy to work.
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/14/2023 DAILY ACTIVITY REPORT: DAY 36 % DAYS ELAPSE: 30%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.71% 5.71% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.74% 3.74% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.21% 1.21% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 1.15% 1.15% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 0.44% 0.44% 0.00% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 14.68% 17.87% 3.20%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : C C F C C F F C C

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 9
40 Labor : 13
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Bara : 4
46 Shovel : 4
47 Mace : 3
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Two Generator Set : 8
54 Chainsaw : 4
55 Breaker : 8
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72
Assign spotters
73 Fog is constantly visiting the area
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/15/2023 DAILY ACTIVITY REPORT: DAY 37 % DAYS ELAPSE: 31%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 5.87% 5.87% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.84% 3.84% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.25% 1.25% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 1.34% 1.34% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 0.88% 0.88% 0.00% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 15.60% 18.80% 3.20%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F C C C R C C C C

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 10
40 Labor : 13
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Mace : 3
46 Shovel : 4
47 Bara : 4
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Two Generator Set : 8
54 Breaker : 8
55 :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Fogs is prominent thoughout the day Assign multiple spotters
73
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : Construction of Tobaco and Combatan Dam
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- COMBATAN AND TABACCO CREEK
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : June 13, 2023 : ACTUAL START : July 3, 2023
10 : PLANNED COMPLETION : December 3, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 120 : ACTUAL DURATION :
12
DATE: 8/16/2023 DAILY ACTIVITY REPORT: DAY 38 % DAYS ELAPSE: 32%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 19.04% 6.03% 6.03% 0.00% Ongoing

19 1.2 Tempory Facilities 4.85% 2.43% 4.85% 2.43% Finished

20 1.3 Supervission 12.45% 3.94% 3.94% 0.00% Ongoing

21 1.4 PPE Benefits and Other cost 4.04% 1.28% 1.28% 0.00% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 Lay Outing and General Works 7.68% 1.54% 1.54% 0.00% Ongoing

24 2.2 Hauling of Materials 17.59% 1.32% 0.88% -0.44% Ongoing

25 2.3 Stone Masonry Works 30.79% 0.00% 0.77% 0.77% Ongoing

26 2.4 Supply of 10 inches HDPE drain and Outlet 3.56%

27 TOTAL 100.00% 16.53% 19.29% 2.76%

28 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

29 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

30 WEATHER : F C C C R R C HR HR

31 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

32 FINANCIAL ACCOMPLISHMENT REPORT:

33 MANPOWER REPORT:
34 CLASSIFICATION: : NO RATE AMOUNT REMARKS
35 Field Engineer : 2
36 Safety Officer : 1
37 Competent Person : 2
38 Foreman : 2
39 Skill : 8
40 Labor : 12
41
42 TOTAL MANPOWER COST PHP
43 MATERIAL UTILAZATION REPORT :
44 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
45 Mace : 3
46 Shovel : 3
47 Bara : 4
48 :
49 :
50 DAILY MATERIAL COST PHP
51 EQUIPMENT UTILIZATION REPORT :
52 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
53 Two generator set : 8
54 Breaker : 8
55 :
56 DAILY EQUIPMENT COST PHP
57 DELIVERY REPORT :
58 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
59 :
60 :
61 :
62 :
63 :
64 OTHER INDIRECT COST :
65 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
66 :
67 :
68 DAILY INDIRECT COST PHP
69
70 TOTAL DAILY COST PHP
71 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
72 Fog is prominent, rain is sprinkling throughout the day, and Work stoppage when the rain is too heavy and the fog is too thick.
73 about 1445H the rain started pouring heavily
74
75
76 Prepared by : Noted By : Checked and Verified By:
77
78 KIM DAWN B. SOLANIA ARNEL M. PONCE _______________________
79
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH
1
DAILY WORK ACTIVITY REPORT
2
3 PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
4 LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
5 CONTRACTOR : MATKR-MPC
6 P.O. No. :
7 COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
8 COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
9 TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
10 : PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
11 : PLANNED DURATION : 62 : ACTUAL DURATION :
12
DATE: 8/30/2023 DAILY ACTIVITY REPORT: DAY 9 % DAYS ELAPSE: 8%
13
14 PHYSICAL ACCOMPLISHMENT REPORT:
15
ACTIVITIES; Unit Wt% Target Actual Variance REMARKS
16
17 1 PRELIMINARY & GENERAL WORKS

18 1.1 Mobilization and Demolization 13.86% 6.93% 0.00% -6.93% Ongoing

19 1.2 Tempory Facilities 1.31% 1.31% 0.00% -1.31% Ongoing

20 1.3 Supervission 5.74% 0.85% 0.09% -0.75% Ongoing

21 1.4 PPE Benefits and Other cost 2.75% 0.40% 0.05% -0.36% Ongoing

22 2.0 CIVIL STRUCTURAL WORKS

23 2.1 OVERFLOW AND DRAIN CATCHMENT BASIN

24 2.2 Manual Excavation 0.48% -11.44% 0.00% 11.44% Ongoing

25 2.3 3000Psi Concrete 0.50% 0.00% 0.00% 0.00% Ongoing

26 2.4 Reinforcement Bars

27 2.5 6" CHB Wall

28 2.6

29

30

31

32

33 TOTAL 24.63% -1.95% 0.14% 2.09%

34 WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

35 TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

36 WEATHER : S S F S S F F F F

37 (S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)

38 FINANCIAL ACCOMPLISHMENT REPORT:

39 MANPOWER REPORT:

40 CLASSIFICATION: : NO RATE AMOUNT REMARKS


41 Field Engineer : 1
42 Safety Officer : 1
43 Competent Person : 1
44 Foreman : 0
45 Skill : 0
46 Labor : 0
47
48 TOTAL MANPOWER COST PHP
49 MATERIAL UTILAZATION REPORT :
50 CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
51 Scaffold :
52 Clamps :
53 Bara : 0
54 Bolo : 0
55 Shovel :
56 DAILY MATERIAL COST PHP
57 EQUIPMENT UTILIZATION REPORT :
58 CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
59 Portable Welding Machine :
60 Two Generator Set :
61 Breaker :
62 DAILY EQUIPMENT COST PHP
63 DELIVERY REPORT :
64 CLASSIFICATION: : QTY UNIT TOTAL REMARKS
65 :
66 :
67 :
68 :
69 :
70 OTHER INDIRECT COST :
71 CLASSIFICATION: : QTY RATE AMOUNT REMARKS
72 :
73 :
74 DAILY INDIRECT COST PHP
75
76 TOTAL DAILY COST PHP
77 PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
78
79
80
81
82 Prepared by : Noted By : Checked and Verified By:
83
84 JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________
85
DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : PREVIOUS :
COMMULATIVE ACTUAL : : PREVIOUS :
TIME LINES : PLANNED START O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION 62 : ACTUAL DURATION :

DATE: 8/31/2023 DAILY ACTIVITY REPORT:DAY 10 % DAYS ELAPSE: 8%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 6.93% 2.77% -4.16% Ongoing
1.2 Tempory Facilities 1.31% 1.31% 0.26% -1.04% Ongoing
1.3 Supervission 5.74% 0.94% 0.19% -0.75% Ongoing
1.4 PPE Benefits and Other cost 2.75% 0.45% 0.09% -0.36% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2 Manual Excavation 0.48% 0.48% 0.16% -0.32% Ongoing
2.3 3000Psi Concrete 0.50% 0.00% 0.00% 0.00% Ongoing
2.4 Reinforcement Bars
2.5 6" CHB Wall
2.6

TOTAL 24.63% 10.11% 3.47% -6.64%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 ###
9 11 13### 16
### 19 20 22 23
WEATHER : S FS F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 0
Skill : 1
Labor : 3

TOTAL MANPOWER COST


MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY AMOUNT REMARKS
Scaffold :
Clamps :
Bara : 0
Bolo : 2
Shovel : 1
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS AMOUNT REMARKS
Portable Welding Machine :
Two Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY AMOUNT REMARKS
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : PREVIOUS :
TIME LINES : PLANNED START O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION 62 : ACTUAL DURATION :

DATE: 9/1/2023 DAILY ACTIVITY REPORT: DAY 10 % DAYS ELAPSE: 8%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 6.93% 4.16% -2.77% Ongoing
1.2 Tempory Facilities 1.31% 1.31% 0.52% -0.78% Ongoing
1.3 Supervission 5.74% 1.03% 0.28% -0.75% Ongoing
1.4 PPE Benefits and Other cost 2.75% 0.50% 0.14% -0.36% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2 Manual Excavation 0.48% 0.48% 0.32% -0.16% Ongoing
2.3 3000Psi Concrete 0.50% 0.00% 0.00% 0.00% Ongoing
2.4 Reinforcement Bars
2.5 6" CHB Wall
2.6

TOTAL 24.63% 10.24% 5.42% -4.83%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 9 ###
10 13 14 16 17 18 19 20 22 25
WEATHER : S F SF F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 0
Skill : 1
Labor : 3

TOTAL MANPOWER COST PHP


MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
Scaffold :
Clamps :
Bara : 0
Bolo : 2
Shovel : 1
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Portable Welding Machine :
Two Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : : PREVIOUS
COMMULATIVE ACTUAL : : : PREVIOUS
TIME LINES : PLANNED START O8/21/2023 : ACTUAL START August 30, 2023
: PLANNED COMPLETION October 21, 2023 : ACTUAL COMPETION
8:00 - 4:00
: PLANNED DURATION 62 : ACTUAL DURATION

DATE: 9/2/2023 DAILY ACTIVITY REPORDAY 12 % DAYS ELAPSE: 10%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 6.93% 4.10% -2.83% Ongoing
1.2 Tempory Facilities 1.31% 1.31% 0.78% -0.52% Ongoing
1.3 Supervission 5.74% 1.22% 0.38% -0.84% Ongoing
1.4 PPE Benefits and Other cost 2.75% 0.59% 0.18% -0.40% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2 Manual Excavation 0.48% 0.48% 0.16% -0.32% Ongoing
2.3 3000Psi Concrete 0.50% 0.00% 0.00% 0.00% Ongoing
2.4 Reinforcement Bars
2.5 6" CHB Wall
2.6

TOTAL 24.63% 10.52% 5.60% -4.92%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 9 10 11 12 13 14 16
### 19 21 22 23
WEATHER : S F S S F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 3

TOTAL MANPOWER COST


MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY AMOUNT REMARKS
Scaffold :
Clamps :
Bara : 1
Bolo : 2
Shovel : 1
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS AMOUNT REMARKS
Portable Welding Machine :
Two Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY AMOUNT REMARKS
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 9/4/2023 DAILY ACTIVITY REPORT: DAY 14 % DAYS ELAPSE: 22%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 6.93% 6.93% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 1.36% 0.56% -0.80% Ongoing
1.4 PPE Benefits and Other cost 2.75% 0.63% 0.27% -0.36% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.18% -0.30% Ongoing
2.2.2 3000Psi Concrete 0.50% 0.50% 0.00% -0.50% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 0.00% -1.16%
2.2.4 6" CHB Wall 1.81% 1.81% 0.00% -1.81%
2.2.5 Plastering and Finishing 1.79% 1.79% 0.00% -1.79%
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.68% 1.68% -2.00% Ongoing
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 7.04% 0.00% -7.04%
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 0.00% 0.00% 0.00%
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 0.00% 0.00% 0.00%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 0.00% 0.00% 0.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 0.00% 0.00% 0.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 9.60% 3.15% -9.60%
2.4.2 stone masonry works 4.38% 0.87% 0.29% -0.58%

TOTAL 100.00% 37.16% 14.37% -25.93%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S F S S F F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 2

TOTAL MANPOWER COST PHP


MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
Scaffold :
Clamps :
Bara : 3
Bolo : 2
Shovel : 2
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Portable Welding Machine :
Two Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/5/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 6
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 10
Clamps : 50
Bara : 3
Bolo : 2
Shovel : 3
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set : 5
Breaker : 5
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F S
NO RATE AMOUNT REMARKS
2
1
1
1
1
6
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


10
50
3
2
3
PHP

HOURS RATE AMOUNT REMARKS

5
5
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

15 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.37% 1.03% -0.34%
2.75% 0.68% 0.32% -0.36%

0.48% 0.48% 0.08% -0.40%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00%
1.81% 1.81% 0.00%
1.79% 1.79% 0.00%

3.36% 3.36% 0.00%


10.54% 8.80% 0.00%
15.99% 0.00% 0.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.00%


4.38% 1.16% 0.00%

100.00% 40.74% 9.67% -1.60%

12 13 14 15 16 17 18 19 20 21
S F F S F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

24%

REMARKS

DONE
DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/6/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 0
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 3
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Clamps : 0
Bara : 3
Bolo : 2
Shovel : 3
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Cutting outfit 4
Generator Set : 6
Breaker : 6
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather Condition


Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
R R C S
NO RATE AMOUNT REMARKS
2
0
1
1
1
3
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
3
2
3
PHP

HOURS RATE AMOUNT REMARKS

4
6
6
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

16 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.44% 1.50% 0.06%
2.75% 0.72% 0.32% -0.40%

0.48% 0.48% 0.11% -0.37%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00%
1.81% 1.81% 0.00%
1.79% 1.73%

3.36% 3.36% 0.00%


10.54% 10.54% 0.00%
15.99% 3.20% 0.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.00%


4.38% 1.45% 0.00%

100.00% 46.03% 10.17% -1.21%

12 13 14 15 16 17 18 19 20 21
R C R F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS
Checked and Verified By:

_______________________
August 30, 2023

26%

REMARKS

DONE
DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/7/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 0
Labor : 6
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold :
Clamps : 0
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Cutting outfit 0
Generator Set : 6
Breaker : 6
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition


Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
R R C S
NO RATE AMOUNT REMARKS
2
1
1
1
0
6
1
PHP

QTY UNIT PRICE AMOUNT REMARKS

0
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

0
6
6
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

17 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.60% 0.75% -0.85%
2.75% 0.77% 0.36% -0.40%

0.48% 0.48% 0.83% 0.35%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00%
1.81% 1.81% 0.00%
1.79% 1.79% 0.00%

3.36% 3.36% 0.00%


10.54% 10.54% 0.00%
15.99% 6.40% 0.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.00%


4.38% 1.74% 0.00%

100.00% 49.78% 10.18% -1.40%

12 13 14 15 16 17 18 19 20 21
R C R F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS
Checked and Verified By:

_______________________
August 30, 2023

27%

REMARKS

DONE
DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/8/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 0
Labor : 7
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Clamps : 0
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Cutting outfit 0
Generator Set : 3
Breaker : 3
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition


Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F C HR
NO RATE AMOUNT REMARKS
2
1
1
1
0
7
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

0
3
3
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

18 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.62% 0.84% -0.78%
2.75% 0.81% 0.40% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00%
1.81% 1.81% 0.00%
1.79% 1.79% 0.00%

3.36% 3.36% 2.01%


10.54% 10.54% 0.00%
15.99% 9.60% 0.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 0.00% 0.00%


4.38% 0.00% 0.00%

100.00% 39.91% 11.98% -1.68%

12 13 14 15 16 17 18 19 20 21
HR R C R F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS
Checked and Verified By:

_______________________
August 30, 2023

29%

REMARKS

DONE
DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/9/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 0
Labor : 7
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Clamps : 0
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set : 0
Breaker : 0
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F C F
NO RATE AMOUNT REMARKS
2
1
1
1
0
7
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

0
0
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

19 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.71% 0.94% -0.77%
2.75% 0.86% 0.45% -0.41%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00%
1.81% 1.81% 0.00%
1.79% 1.79% 0.00%

3.36% 3.36% 2.01%


10.54% 10.54% 0.00%
15.99% 9.60% 0.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 0.00% 0.00%


4.38% 0.00% 0.00%

100.00% 40.04% 12.12% -1.67%

12 13 14 15 16 17 18 19 20 21
F F F F R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

30%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/11/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 4
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Clamps : 0
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set : 0
Breaker : 0
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F F
NO RATE AMOUNT REMARKS
2
1
1
1
2
4
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

0
0
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

21 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 1.97% 1.13% -0.84%
2.75% 0.95% 0.54% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00% -1.16%
1.81% 1.81% 0.00% -1.81%
1.79% 1.79% 0.00% -1.79%

3.36% 3.36% 2.01% -1.35%


10.54% 10.54% 0.00% -10.54%
15.99% 9.60% 0.00% -15.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.21% -11.19%


4.38% 2.92% 0.00% -2.92%

100.00% 54.71% 12.61% -48.49%

12 13 14 15 16 17 18 19 20 21
F F F F R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

33%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
Ongoing
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/12/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 4
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Clamps : 0
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F C F S
NO RATE AMOUNT REMARKS
2
1
1
1
2
4
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

22 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 2.06% 1.22% -0.84%
2.75% 0.99% 0.59% -0.41%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.00% -0.50%
1.16% 1.16% 0.00% -1.16%
1.81% 1.81% 0.00% -1.81%
1.79% 1.79% 0.00% -1.79%

3.36% 3.36% 2.01% -1.35%


10.54% 10.54% 0.00% -10.54%
15.99% 9.60% 0.00% -15.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.21% -11.40%


4.38% 0.00% 0.00% -4.38%

100.00% 51.93% 12.74% -50.16%

12 13 14 15 16 17 18 19 20 21
C F F F R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

35%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/13/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 4
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
Scaffold : 0
Cement : 10
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F C F C
NO RATE AMOUNT REMARKS
2
1
1
1
2
4
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
10
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

23 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 2.16% 1.32% -0.85%
2.75% 1.04% 0.63% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 0.91% -0.89%
1.79% 1.79% 0.45% -1.34%

3.36% 3.36% 2.01% -1.35%


10.54% 10.54% 8.00% -2.54%
15.99% 9.60% 13.00% -2.99%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.21% -11.19%


4.38% 3.48% 0.00% -3.48%

100.00% 55.55% 36.90% -25.03%

12 13 14 15 16 17 18 19 20 21
R F F F R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

37%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/14/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 4
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Portable Welding Machine :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F C F C
NO RATE AMOUNT REMARKS
2
1
1
1
2
4
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

24 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 2.23% 1.41% -0.82%
2.75% 1.08% 0.68% -0.41%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 0.91% -0.90%
1.79% 1.79% 0.45% -1.34%

3.36% 3.36% 2.01% -1.35%


10.54% 10.54% 8.00% -2.54%
15.99% 15.90% 13.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.21% -11.19%


4.38% 3.38% 0.00% -3.38%

100.00% 61.86% 37.05% -24.91%

12 13 14 15 16 17 18 19 20 21
R F F F R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

38%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
Ongoing
Ongoing

Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/15/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 3
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw : 2
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Temporary stop activity due to bad weather condition.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F C R R
NO RATE AMOUNT REMARKS
2
1
1
1
2
3
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS


2

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

25 % DAYS ELAPSE:

Target Actual Variance

13.86% 6.93% 6.93% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 2.35% 1.50% -0.85%
2.75% 1.13% 0.72% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 0.91% -0.90%
1.79% 1.79% 0.90% -0.89%

3.36% 3.36% 2.01% -1.35%


10.54% 10.54% 8.00% -2.54%
15.99% 9.60% 13.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.21% -11.19%


4.38% 3.48% 0.00% -3.48%

100.00% 55.83% 37.63% -24.59%

12 13 14 15 16 17 18 19 20 21
R F F F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

40%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
Ongoing
Ongoing

Ongoing
Ongoing
Ongoing

ongoing
ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LIN
LOCATION : MT. APO GEOTHERMAL PR
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/16/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 3
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw : 2
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

lts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F F
NO RATE AMOUNT REMARKS
2
1
1
1
2
3
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS


2

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

26 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 6.93% -3.93%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79%

3.36% 3.36% 3.01% -1.65%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.47% -11.19%


4.38% 4.38% 0.00% -0.90%

100.00% 69.95% 44.81% -25.22%

12 13 14 15 16 17 18 19 20 21
F F F F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

41%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
ARKS
____________
PROJECT TITILE :
LOCATION :
CONTRACTOR :
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES :
:
8:00 - 4:00
:

DATE: 9/18/2023

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @15
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM :
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: :
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: :
10" spigot :
Butterfly valve S-150 :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: :
Chainsaw :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: :
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: :
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START :
PLANNED COMPLETION : Octo
PLANNED DURATION :

DAILY ACTIVITY REPORT: DAY

Wt%

el anchor bolts with washer placed @150mm O.C

1 2 3 4 5 6 7 8 9
S S

NO RATE AMOUNT
2
1
1
1
2
3
1
PHP

QTY UNIT PRICE AMOUNT


2
2
2
2
4
PHP

HOURS RATE AMOUNT

PHP

QTY UNIT TOTAL

QTY RATE AMOUNT

PHP

PHP
ACTION TAKEN
Noted By :

ARNEL M. PONCE
CTIVITY REPORT

: PREVIOUS
: PREVIOUS
O8/21/2023 : ACTUAL START
October 21, 2023 : ACTUAL COMPETION
62 : ACTUAL DURATION

DAY 28 % DAYS ELAPSE:

Wt% Target Actual

13.86% 11.96% 6.93%


1.31% 1.31% 1.31%
5.74% 5.62% 3.59%
2.75% 2.15% 0.76%

0.48% 0.48% 0.48%


0.50% 0.50% 0.50%
1.16% 1.16% 1.16%
1.81% 1.81% 1.81%
1.79% 1.79% 1.79%

3.36% 3.36% 3.01%


10.54% 10.54% 10.12%
15.99% 15.99% 14.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.91%


4.38% 4.38% 1.02%

100.00% 72.45% 47.39%

10 11 12 13 14 15 16 17 18
F F C F F R R

REMARKS

REMARKS

REMARKS

REMARKS

OUNT REMARKS

ACTION TAKEN REMA


Checked and Verified By:

RNEL M. PONCE ____________


:
:
: August 30, 2023
:
:

APSE: 45%

Variance REMARKS

-2.10% DONE
0.00% DONE
-2.03% Ongoing
-1.39% Ongoing

0.00% DONE
0.00% Ongoing
0.00% DONE
0.00% DONE
0.00% DONE

-1.65% Ongoing
-2.54% Ongoing
-2.99% Ongoing

0.00%
0.00%
0.00%

-11.19% Ongoing
-0.90% Ongoing

-24.79%

19 20 21 22 23 24 25
REMARKS
By:

_______________________
PROJECT TITILE :
LOCATION :
CONTRACTOR :
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES :
:
8:00 - 4:00
:

DATE: 9/19/2023

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @15
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM :
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: :
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: :
10" spigot :
Butterfly valve S-150 :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: :
Chainsaw :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: :
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: :
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START :
PLANNED COMPLETION : Octo
PLANNED DURATION :

DAILY ACTIVITY REPORT: DAY

Wt%
el anchor bolts with washer placed @150mm O.C

1 2 3 4 5 6 7 8 9
S S

NO RATE AMOUNT
2
1
1
1
2
9
1
PHP

QTY UNIT PRICE AMOUNT


2
2
2
2
4
PHP

HOURS RATE AMOUNT

PHP

QTY UNIT TOTAL


QTY RATE AMOUNT

PHP

PHP
ACTION TAKEN

Noted By :

ARNEL M. PONCE
CTIVITY REPORT

: PREVIOUS
: PREVIOUS
O8/21/2023 : ACTUAL START
October 21, 2023 : ACTUAL COMPETION
62 : ACTUAL DURATION

DAY 29 % DAYS ELAPSE:

Wt% Target Actual

13.86% 10.86% 6.93%


1.31% 1.31% 1.31%
5.74% 4.62% 3.59%
2.75% 1.75% 0.76%

0.48% 0.48% 0.48%


0.50% 0.50% 0.50%
1.16% 1.16% 1.16%
1.81% 1.81% 1.81%
1.79% 1.79% 1.79%

3.36% 3.36% 3.01%


10.54% 10.54% 9.00%
15.99% 15.99% 14.00%
16.73% 0.00% 0.00%
5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.91%


4.38% 4.38% 1.02%

100.00% 73.72% 48.73%

10 11 12 13 14 15 16 17 18
F C F C F F F

REMARKS

REMARKS

REMARKS

REMARKS
OUNT REMARKS

ACTION TAKEN REMA

Checked and Verified By:

RNEL M. PONCE ____________


:
:
: August 30, 2023
:
:

APSE: 46%

Variance REMARKS

-3.10% DONE
0.00% DONE
-1.03% Ongoing
-0.99% Ongoing

0.00% DONE
0.00% Ongoing
0.00% DONE
0.00% DONE

-1.65% Ongoing
-2.54% Ongoing
-2.99% Ongoing
0.00%
0.00%
0.00%

-11.19% Ongoing
-0.90% Ongoing

-24.99%

19 20 21 22 23 24 25
REMARKS

By:

_______________________
PROJECT TITILE :
LOCATION :
CONTRACTOR :
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES :
:
8:00 - 4:00
:

DATE: 9/20/2023

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @15
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM :
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: :
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: :
10" spigot :
Butterfly valve S-150 :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: :
Chainsaw :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: :
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: :
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Temporary stop activity due to bad weather condition .


Temporary stop activity due to bad weather condition .

Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START :
PLANNED COMPLETION : Octo
PLANNED DURATION :

DAILY ACTIVITY REPORT: DAY

Wt%

el anchor bolts with washer placed @150mm O.C

1 2 3 4 5 6 7 8 9
S S

NO RATE AMOUNT
2
1
1
1
2
10
1
PHP

QTY UNIT PRICE AMOUNT


2
2
2
2
4
PHP

HOURS RATE AMOUNT

PHP

QTY UNIT TOTAL

QTY RATE AMOUNT

PHP

PHP
ACTION TAKEN
Noted By :

ARNEL M. PONCE
CTIVITY REPORT

: PREVIOUS
: PREVIOUS
O8/21/2023 : ACTUAL START
October 21, 2023 : ACTUAL COMPETION
62 : ACTUAL DURATION

DAY 30 % DAYS ELAPSE:

Wt% Target Actual

13.86% 10.86% 6.93%


1.31% 1.31% 1.31%
5.74% 4.62% 3.59%
2.75% 1.75% 0.76%

0.48% 0.48% 0.48%


0.50% 0.50% 0.50%
1.16% 1.16% 1.16%
1.81% 1.81% 1.81%
1.79% 1.79% 1.79%

3.36% 3.36% 3.01%


10.54% 10.54% 9.00%
15.99% 15.99% 14.00%

16.73% 0.00% 0.00%


5.02% 0.00% 0.00%
3.19% 0.00% 0.00%

11.40% 11.40% 0.47%


4.38% 4.38% 1.02%

100.00% 74.27% 49.12%

10 11 12 13 14 15 16 17 18
F HR HR C F R F

REMARKS

REMARKS

REMARKS

REMARKS

OUNT REMARKS

ACTION TAKEN REMA


Checked and Verified By:

RNEL M. PONCE ____________


:
:
: August 30, 2023
:
:

APSE: 48%

Variance REMARKS

-3.93% DONE
0.00% DONE
-1.03% Ongoing
-0.99% Ongoing

0.00% DONE
0.00% Ongoing
0.00% DONE
0.00% DONE

-1.65% Ongoing
-2.54% Ongoing
-2.99% Ongoing

0.00%
0.00%
0.00%

-11.19% Ongoing
-0.90% Ongoing

-25.22%

19 20 21 22 23 24 25
REMARKS
By:

_______________________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/21/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 10
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 3
Breaker : 3
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Temporary stop activity due to bad weather condition . Heavy rain around 2pm.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F F
NO RATE AMOUNT REMARKS
2
1
1
1
2
10
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

3
3
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

pm.

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

31 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 6.93% -3.93%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.01% -1.65%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.47% -10.93%


4.38% 4.38% 1.02% -0.90%

100.00% 76.23% 49.41% -29.19%

12 13 14 15 16 17 18 19 20 21
F R HR HR HR
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

45%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/22/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 0
Safety Officer : 0
Competent Person : 0
Foreman : 0
Skill : 0
Labor : 0
Driver 0
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 0
Butterfly valve S-150 : 0
Bara : 0
Bolo : 0
Shovel : 0
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 0
Breaker : 0
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Stop work due to heavy rain yesterday.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F C S S
NO RATE AMOUNT REMARKS
0
0
0
0
0
0
0
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
0
0
0
PHP

HOURS RATE AMOUNT REMARKS

0
0
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

32 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 6.93% -3.93%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.01% -1.65%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.47% -10.93%


4.38% 4.38% 1.02% -0.90%

100.00% 76.23% 49.41% -26.35%

12 13 14 15 16 17 18 19 20 21
F R R F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

51%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/23/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 10
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F F F
NO RATE AMOUNT REMARKS
2
1
1
1
2
10
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

33 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 6.93% -3.93%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.01% -1.65%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.72% -11.19%


4.38% 4.38% 1.02% -0.90%

100.00% 74.27% 49.41% -26.35%

12 13 14 15 16 17 18 19 20 21
F F S F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

53%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/25/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 12
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 3
Breaker : 3
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F F F
NO RATE AMOUNT REMARKS
2
1
1
1
2
12
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

3
3
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

35 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 1.48% -0.27%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3,36% 0.00%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 1.72% -11.19%


4.38% 4.38% 1.02% -0.90%

100.00% 81.95% 49.41% -32.54%

12 13 14 15 16 17 18 19 20 21
F F S F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

56%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
DONE
DONE
DONE
DONE

DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/26/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 2
Labor : 14
Driver 1
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F R R
NO RATE AMOUNT REMARKS
2
1
1
2
2
14
1
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

36 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.72% -11.19%


4.38% 4.38% 1.02% -0.90%

100.00% 81.89% 49.68% -32.21%

12 13 14 15 16 17 18 19 20 21
F R R R R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

58%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/27/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 0
Safety Officer : 0
Competent Person : 0
Foreman : 0
Skill : 0
Labor : 0
Driver 0
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 0
Butterfly valve S-150 : 0
Bara : 0
Bolo : 0
Shovel : 0
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

No duty. Due to holiday.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
NO RATE AMOUNT REMARKS
0
0
0
0
0
0
0
PHP

QTY UNIT PRICE AMOUNT REMARKS


0
0
0
0
0
PHP

HOURS RATE AMOUNT REMARKS

4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

37 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.01% -1.65%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 0.72% -11.19%


4.38% 4.38% 1.02% -0.90%

100.00% 82.53% 49.68% -32.85%

12 13 14 15 16 17 18 19 20 21
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

59%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

Ongoing
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/28/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 14
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Chainsaw :
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F C C
NO RATE AMOUNT REMARKS
2
1
1
1
2
14
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

38 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 2.25% -11.19%


4.38% 4.38% 1.30% -0.90%

100.00% 83.17% 53.37% -29.80%

12 13 14 15 16 17 18 19 20 21
F C F F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

61%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/29/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 14
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer : 6
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F C C
NO RATE AMOUNT REMARKS
2
1
1
1
2
14
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS


6
4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

39 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 9.00% -2.54%
15.99% 15.99% 14.00% -2.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 4.26% -7.14%


4.38% 4.38% 1.55% -0.90%

100.00% 83.81% 57.08% -20.73%

12 13 14 15 16 17 18 19 20 21
F F F F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

62%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 9/30/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 2
Labor : 15
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer : 6
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
F F F C
NO RATE AMOUNT REMARKS
2
1
1
2
2
15
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS


6
4
4
PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

40 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.59% -1.03%
2.75% 1.75% 0.76% -0.99%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 9.00% -1.54%
15.99% 15.99% 14.00% -1.99%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 7.28% -3.45%


4.38% 4.38% 1.55% -2.83%

100.00% 84.45% 60.99% -22.82%

12 13 14 15 16 17 18 19 20 21
F F F F F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

64%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
Ongoing
Ongoing

Ongoing
Ongoing

22 23 24 25
MARKS
____________
DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : THIS PERIOD : PREVIOUS :
COMMULATIVE ACTUAL : THIS PERIOD : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/2/2023 DAILY ACTIVITY REPORT: DAY 42 % DAYS ELAPSE: 67%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 4.62% 3.01% -1.61% Ongoing
1.4 PPE Benefits and Other cost 2.75% 1.75% 1.44% -0.31% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% DONE
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 0.00% 0.00% 0.00%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 0.00% 0.00% 0.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with wa 3.19% 0.00% 0.00% 0.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% Done
2.4.2 stone masonry works 4.38% 4.38% 4.01% -0.37% Ongoing

TOTAL 100.00% 85.73% 65.00% -20.55%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S S F F S S F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
cement : 20
Bara : 1
Bolo : 1
Shovel : 4
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer : 6
Generator Set : 4
Breaker : 4
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 10/3/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
:
Cement : 20
Bara : 1
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer : 6
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S S S
NO RATE AMOUNT REMARKS
2
1
1
2
4
15
2
PHP

QTY UNIT PRICE AMOUNT REMARKS

20
1
2
4
PHP

HOURS RATE AMOUNT REMARKS


6

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

43 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.62% 3.20% -1.42%
2.75% 1.93% 1.53% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 10.54% 0.00%
15.99% 15.99% 15.99% 0.00%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 11.40% 0.00%


4.38% 4.38% 4.38% 0.00%

100.00% 86.37% 69.10% -17.27%

12 13 14 15 16 17 18 19 20 21
S F S S F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

67%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
DONE
DONE

DONE
DONE

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 10/4/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer : 6
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S S S
NO RATE AMOUNT REMARKS
2
1
1
2
4
15
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS


6

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

44 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.71% 3.29% -1.42%
2.75% 1.97% 1.57% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 10.54% 0.00%
15.99% 15.99% 15.99% 0.00%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 11.40% 0.00%


4.38% 4.38% 4.38% 0.00%

100.00% 87.01% 70.44% -16.58%

12 13 14 15 16 17 18 19 20 21
R R S S F
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

70%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
DONE
DONE

DONE
DONE

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 10/5/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition.

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F F
NO RATE AMOUNT REMARKS
2
1
1
2
4
15
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

45 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.71% 3.38% -1.33%
2.75% 2.01% 1.61% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 10.54% 0.00%
15.99% 15.99% 15.99% 0.00%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 11.40% 0.00%


4.38% 4.38% 4.38% 0.00%

100.00% 87.66% 71.78% -15.88%

12 13 14 15 16 17 18 19 20 21
F F R R R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

72%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
DONE
DONE

DONE
DONE

22 23 24 25
MARKS
____________
PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 10/6/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Bad weather condition

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
S S F F
NO RATE AMOUNT REMARKS
2
1
1
2
4
15
2
PHP

QTY UNIT PRICE AMOUNT REMARKS


2
2
2
2
4
PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

46 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 4.71% 3.38% -1.33%
2.75% 2.01% 1.61% -0.40%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 10.54% 0.00%
15.99% 15.99% 15.99% 0.00%

16.73% 0.00% 0.00% 0.00%


5.02% 0.00% 0.00% 0.00%
3.19% 0.00% 0.00% 0.00%

11.40% 11.40% 11.40% 0.00%


4.38% 4.38% 4.38% 0.00%

100.00% 88.08% 73.12% -14.97%

12 13 14 15 16 17 18 19 20 21
F F R R R
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

74%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
DONE
DONE

DONE
DONE

22 23 24 25
MARKS
____________
DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/7/2023 DAILY ACTIVITY REPORT: DAY 47 % DAYS ELAPSE: 75%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 4.71% 3.38% -1.33% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.01% 1.61% -0.40% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 0.00% 0.00% 0.00%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 0.00% 0.00% 0.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 0.00% 0.00% 0.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 88.51% 74.46% -14.06%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S F F F R R R F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 4
Labor : 15
Driver 2
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
10" spigot : 2
Butterfly valve S-150 : 2
Bara : 2
Bolo : 2
Shovel : 4
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition.

Prepared by : Noted By : Checked and Verified By:


JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________
DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/9/2023 DAILY ACTIVITY REPORT: DAY 49 % DAYS ELAPSE: 79%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 4.80% 3.47% -1.33% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.10% 1.65% -0.45% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.20% -13.53%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 89.37% 75.80% -13.58%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S F F F c R R R
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 3
Labor : 1
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement : 0
Bara : 1
Bolo : 1
Shovel : 1
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition.


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/10/2023 DAILY ACTIVITY REPORT: DAY 50 % DAYS ELAPSE: 80%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 4.89% 3.65% -1.24% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.14% 1.69% -0.45% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 89.80% 75.80% -14.00%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : F F F F F R F HR HR
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 3
Labor : 1
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition. Heavy rain


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/11/2023 DAILY ACTIVITY REPORT: DAY 51 % DAYS ELAPSE: 82%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 4.98% 3.38% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.73% -0.45% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.23% 76.15% -14.08%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : F F F F F R F R R
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 3
Labor : 1
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition.


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/12/2023 DAILY ACTIVITY REPORT: DAY 52 % DAYS ELAPSE: 83%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -14.41%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : F F F S F R F R R
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 3
Labor : 1
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition.


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/13/2023 DAILY ACTIVITY REPORT: DAY 53 % DAYS ELAPSE: 85%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73%
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00%
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00%
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -14.41%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

The Competent person was not around, thus theres no work done.
Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/14/2023 DAILY ACTIVITY REPORT: DAY 54 % DAYS ELAPSE: 87%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -15.27%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

The Competent person was not around, thus theres no work done.
Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


PROJECT TITILE : INSTALLATION OF HDPE LINER
LOCATION : MT. APO GEOTHERMAL PROJEC
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN :
COMMULATIVE ACTUAL :
TIME LINES : PLANNED START
: PLANNED COMPLETION
8:00 - 4:00
: PLANNED DURATION

DATE: 10/15/2023 DAILY ACTIVITY REPORT:

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit
1 PRELIMINARY & GENERAL WORKS
1.1 Mobilization and Demolization
1.2 Tempory Facilities
1.3 Supervission
1.4 PPE Benefits and Other cost
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation
2.2.2 3000Psi Concrete
2.2.3 Reinforcement Bars
2.2.4 6" CHB Wall
2.2.5 Plastering and Finishing
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts
2.2.3 Supply and installation of 10" HDPE spigot
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation
2.4.2 stone masonry works

TOTAL
WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST
DELIVERY REPORT :
CLASSIFICATION: : QTY
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY
:
:
DAILY INDIRECT COST

TOTAL DAILY COST


PROBLEMS ENCOUNTERED

Prepared by :
Prepared by :

JOHNRAY L. BALAYANAN
DAILY WORK ACTIVITY REPORT
INSTALLATION OF HDPE LINER PAD- G
MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
MATKR-MPC

: THIS PERIOD :
: THIS PERIOD :
PLANNED START : O8/21/2023
PLANNED COMPLETION : October 21, 2023
PLANNED DURATION : 62

DAILY ACTIVITY REPORT: DAY

Wt%

13.86%
1.31%
5.74%
2.75%

0.48%
0.50%
1.16%
1.81%
1.79%

r bolts with washer placed @150mm O.C

100.00%

2 3 4 5 6 7 8 9 10 11
NO RATE AMOUNT REMARKS

PHP

QTY UNIT PRICE AMOUNT REMARKS

PHP

HOURS RATE AMOUNT REMARKS

PHP

QTY UNIT TOTAL REMARKS

QTY RATE AMOUNT REMARKS

PHP

PHP
ACTION TAKEN

Noted By :
Noted By :

ARNEL M. PONCE
: PREVIOUS :
: PREVIOUS :
O8/21/2023 : ACTUAL START :
October 21, 2023 : ACTUAL COMPETION :
62 : ACTUAL DURATION :

55 % DAYS ELAPSE:

Target Actual Variance

13.86% 10.86% 10.86% 0.00%


1.31% 1.31% 1.31% 0.00%
5.74% 5.07% 3.47% -1.60%
2.75% 2.18% 1.77% -0.41%

0.48% 0.48% 0.48% 0.00%


0.50% 0.50% 0.50% 0.00%
1.16% 1.16% 1.16% 0.00%
1.81% 1.81% 1.81% 0.00%
1.79% 1.79% 1.79% 0.00%

3.36% 3.36% 3.36% 0.00%


10.54% 10.54% 10.54% 0.00%
15.99% 15.99% 15.99% 0.00%

16.73% 16.73% 3.00% -13.73%


5.02% 5.02% 4.02% -1.00%
3.19% 3.19% 2.19% -1.00%

11.40% 11.40% 11.40% 0.00%


4.38% 4.38% 4.38% 0.00%

100.00% 90.66% 76.25% -15.27%

12 13 14 15 16 17 18 19 20 21
REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

REMARKS

Checked and Verified By:


Checked and Verified By:

_______________________
August 30, 2023

88%

REMARKS

DONE
DONE
Ongoing
Ongoing

DONE
Ongoing
DONE
DONE
DONE

DONE
DONE
DONE

Ongoing
Ongoing
Ongoing

DONE
DONE

22 23 24 25
MARKS
____________
DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/16/2023 DAILY ACTIVITY REPORT: DAY 56 % DAYS ELAPSE: 90%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -15.27%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/17/2023 DAILY ACTIVITY REPORT: DAY 57 % DAYS ELAPSE: 91%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -15.27%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER :
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer :
Safety Officer :
Competent Person :
Foreman :
Skill :
Labor :
Driver
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
Cement :
Bara :
Bolo :
Shovel :
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
Mixer :
Generator Set :
Breaker :
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/18/2023 DAILY ACTIVITY REPORT: DAY 58 % DAYS ELAPSE: 93%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -15.27%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S F F F F F F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 2
Labor : 3
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
HDPE LINER 550 Sqm
STAINLESS FLAT BAR : 7 length
EXPANSION BOLTS : 400 pcs
:
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
:
Generator Set :
:
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS
Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/19/2023 DAILY ACTIVITY REPORT: DAY 59 % DAYS ELAPSE: 95%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.07% 3.47% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.18% 1.77% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 3.00% -13.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 90.66% 76.25% -15.27%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S S F F F R F F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 3
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
HDPE LINER : 550 sqm
STAINLES FLAT BAR : 7 length
EXPANSION BOLTS : 400 pcs
:
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
:
Generator Set :
:
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/20/2023 DAILY ACTIVITY REPORT: DAY 60 % DAYS ELAPSE: 96%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.16% 3.56% -1.60% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.22% 1.81% -0.41% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 14.00% -2.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 98.47% 93.19% -5.28%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S S F F F F F R R
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 3
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
HDPE LINER : 550 sqm
STAINLES FLAT BAR : 7 length
EXPANSION BOLTS : 400 pcs
:
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
:
Generator Set : 3
:
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/21/2023 DAILY ACTIVITY REPORT: DAY 61 % DAYS ELAPSE: 98%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 13.86% 13.00% -0.86% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.74% 5.74% 0.00% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.75% 2.75% 0.00% Ongoing
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 14.00% -2.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 100.00% 94.33% -5.67%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S S F F F R R F F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 2
Skill : 3
Labor : 10
Driver 2
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
HDPE LINER : 550 sqm
STAINLES FLAT BAR : 7 length
EXPANSION BOLTS : 400 pcs
:
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
:
Generator Set :
:
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________


DAILY WORK ACTIVITY REPORT
PROJECT TITILE : INSTALLATION OF HDPE LINER PAD- G
LOCATION : MT. APO GEOTHERMAL PROJECT - BRGY. ILOMAVIS, KIDAPAWAN CITY- PAD G
CONTRACTOR : MATKR-MPC
P.O. No. :
COMMULATIVE PLAN : : THIS PERIOD : : PREVIOUS :
COMMULATIVE ACTUAL : : THIS PERIOD : : PREVIOUS :
TIME LINES : PLANNED START : O8/21/2023 : ACTUAL START : August 30, 2023
: PLANNED COMPLETION : October 21, 2023 : ACTUAL COMPETION :
8:00 - 4:00
: PLANNED DURATION : 62 : ACTUAL DURATION :

DATE: 10/22/2023 DAILY ACTIVITY REPORT: DAY 62 % DAYS ELAPSE: 100%

PHYSICAL ACCOMPLISHMENT REPORT:

ACTIVITIES; Unit Wt% Target Actual Variance REMARKS

1 PRELIMINARY & GENERAL WORKS


1.1 Mobilization and Demolization 13.86% 10.86% 10.86% 0.00% DONE
1.2 Tempory Facilities 1.31% 1.31% 1.31% 0.00% DONE
1.3 Supervission 5.74% 5.74% 4.19% -1.55% Ongoing
1.4 PPE Benefits and Other cost 2.75% 2.75% 2.75% 0.00% DONE
2.0 CIVIL STRUCTURAL WORKS
2.1 OVERFLOW AND DRAIN CATCHMENT BASIN
2.2.1 Manual Excavation 0.48% 0.48% 0.48% 0.00% DONE
2.2.2 3000Psi Concrete 0.50% 0.50% 0.50% 0.00% Ongoing
2.2.3 Reinforcement Bars 1.16% 1.16% 1.16% 0.00% DONE
2.2.4 6" CHB Wall 1.81% 1.81% 1.81% 0.00% DONE
2.2.5 Plastering and Finishing 1.79% 1.79% 1.79% 0.00% DONE
INSTALLATION OF 10" HDPE OUTLET AND DRAIN
2.2.1 chipping of concrete wall 3.36% 3.36% 3.36% 0.00% DONE
2.2.2 supply and installation of butterfly valves S-150 with flange and stud bolts 10.54% 10.54% 10.54% 0.00% DONE
2.2.3 Supply and installation of 10" HDPE spigot 15.99% 15.99% 15.99% 0.00% DONE
INSTALLATION OF 2MM THK. HDPE LINER
2.3.1 Supply and installation of 2mm thk. HDPE LINER 16.73% 16.73% 14.00% -2.73% Ongoing
2.3.2 (HDPE fastener) : supply and install 6mm. Thk.x 50mm. Wide stainless steel flat bar 5.02% 5.02% 4.02% -1.00% Ongoing
2.3.3 ( HDPE fastener ) : supply and install 10mm dia.x 75mm long stainless steel anchor bolts with washer placed @150mm O.C 3.19% 3.19% 2.19% -1.00% Ongoing
STONE MASONRY CASCADING CANAL
2.4.1 Manual Excavation 11.40% 11.40% 11.40% 0.00% DONE
2.4.2 stone masonry works 4.38% 4.38% 4.38% 0.00% DONE

TOTAL 100.00% 100.00% 95.00% -5.00%


WEATHER REPORT : (S - SUNNY, F - FAIR,C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
TIME 8AM - 4PM : 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
WEATHER : S S S F F F F R R F F
(S - SUNNY, F - FAIR, C-CLOUDY, R - RAIN, HR - HEAVY RAIN)
FINANCIAL ACCOMPLISHMENT REPORT:
MANPOWER REPORT:
CLASSIFICATION: : NO RATE AMOUNT REMARKS
Field Engineer : 2
Safety Officer : 1
Competent Person : 1
Foreman : 1
Skill : 1
Labor : 6
Driver 1
TOTAL MANPOWER COST PHP
MATERIAL UTILAZATION REPORT :
CLASSIFICATION: : QTY UNIT PRICE AMOUNT REMARKS
:
HDPE LINER : 550 sqm
STAINLES FLAT BAR : 7 length
EXPANSION BOLTS : 400 pcs
:
DAILY MATERIAL COST PHP
EQUIPMENT UTILIZATION REPORT :
CLASSIFICATION: : HOURS RATE AMOUNT REMARKS
:
Generator Set :
:
DAILY EQUIPMENT COST PHP
DELIVERY REPORT :
CLASSIFICATION: : QTY UNIT TOTAL REMARKS
:
:
:
:
:
OTHER INDIRECT COST :
CLASSIFICATION: : QTY RATE AMOUNT REMARKS
:
:
DAILY INDIRECT COST PHP

TOTAL DAILY COST PHP


PROBLEMS ENCOUNTERED ACTION TAKEN REMARKS

Bad weather condition


Prepared by : Noted By : Checked and Verified By:

JOHNRAY L. BALAYANAN ARNEL M. PONCE _______________________