MAN POWER ,EQUIPMENT & MATERIAL SCHEDULE

PROJECT:BOE UNTA-ROBALE URRAP ROAD FINISHING WORK PROJECT Project Cost (Birr) 10,522,046.44
CLIENT:OROMIA ROAD AND LOGISTICS BUREAU(ANA SORA WOREDA ROADS
AND LOGISTICS BUREAU Project Duration 120 Cal. Days
Site Location: Guji Zone, Ana Sora Wereda Commencement Date 18/3/2024
Contractor: Debenu Road & Bridge Construction Small Enterprise Completion Date 30/8/2024
Man Power
Ararse Mintasa- (PROJECT MANGER) Work A Dhabbii
Adugna Wako-Site Engineer Work B Dhabbii
Abinet Geleta - FORMAN Work R Dhabbii
Haleka Robe - SURVEYOR Work A Dhabbii
Hawa Adem - ACCOUNTANT Work T Dhabbii
Kemal Nesh Dagne- HUMAN RESOURCE(MANGEMENT) Work Y Dhabbii
Mason Work M Yeroo
Assistant mason Work A Yeroo
Bar-bender Work B Yeroo
Assistant bar-bender Work A Yeroo
Carpenter Work C Yeroo
Assistant carpenter Work A Yeroo
Gang leader Work G Yeroo
Daily laborer Work D Yeroo
Mixer operator Work M Yeroo
Dump Truck Driver Work D Yeroo
Loader Operator Work L Yeroo
Vibrator Operator Work V Yeroo
Excavator Operator Work E Yeroo
Greador Operator Work G Yeroo
Water Truck Driver Work W Yeroo
Roller Operator Work R Yeroo
Metal Welder Work M Yeroo
Ass. metal welder Work A Yeroo
Material Requirments
Cement Material C Buying From Shop
Nails Material N Buying From Shop
Black wire # 2.5 Material B Buying From Shop
Buying From
Timber 2.5 cm thick Material T
WorkShop
Crushed aggregate Material C From Quiry Site
Basaltic stone Material B From Quiry Site
Mould Oil Material M Buying From Shop
Sand Material S From Quiry Site
Tracheatic stone Material T From Quiry Site
Selected material Material S From Quiry Site
Water Material W Locally Available
Eucalyptus Material E From Local Supplier
C 20 Concrete Material C Cat insitu production
C 25 Concrete Material C Cat insitu production
C 30 Concrete Material C Cat insitu production
Granular Selected Material Material G From Quiry Site
Form Work Material F Buying From Shop
Measurement Material M Buying From Shop
Stringe Material S Buying From Shop
Deformed Bar Material D Buying From Shop
Bolt Material B Buying From Shop
Elatrometric Material E Buying From Shop
Stone Material S From Quiry Site
Traffic Signe Furnitures Material T Buying From Shop
Guide & Km posts Material G Buying From Shop
Equipment Requiring
Mixer Cost M Rental
Vibrator Cost V Rental
Dump Truck Cost D Rental
Loader Cost L Rental
Plate Compactor Cost P Rental
Greador Cost T Rental
Roller 10 Ton Cost R Rental
Water Truck 1200lt Cost W Rental
Excavator Cost E Rental