ENGR 1301: INTRODUCTION TO ENGINEERING FALL 2022

Lab 01: Building DESIGN SPECIFICATIONS 15 MINUTES


You must design, build, and test a bridge structure to meet the
a Paper Bridge following criteria. Your completed bridge
 must span two tables of equal height;
When You Barely Have  cannot be secured to either table;
One Hour  cannot deflect more than 5cm in its unloaded state; and
 must support a concentrated load of at least 1 kg.
INTRODUCTION
It’s official: the Oxford Dictionary added the word “MacGyver” You should spend no more than 15 minutes discussing your
as a verb meaning “making or repairing (an object) in an ideas with your team partners, but then you have to commit.
improvised or inventive way.” MacGyver is, of course, the Pick and stick: Choose one idea to pursue, and then make it
classic example of being able to make a cardiac defibrillator work.
using only a pair of candlesticks and and an electrical cord
(true story; S01E15), and as an engineer you will probably BUILD 30 MINUTES
never have to improvise an emergency arc welder out of a car Plan to spend no more than 30 minutes in the construction
battery, jumper cables, and an antenna (true story; S03E08). phase. It will be worth your time to take a few minutes off the
top to divvy up the labor and assign tasks to all team
But engineers are, at the most fundamental level, problem members. Thirty. Minutes.
solvers. And you will, at some point, find yourself having to
solve a problem you didn’t expect, on a tight time frame and TEST 15 MINUTES
possibly without many resources. This requires flexibility and Once your bridge construction is complete, test it be sure it
creativity. Speed and accuracy. Knowledge and imagination. meets your design criteria. This should be done in about 15
You have to exercise and strengthen these skills in many minutes.
contexts to be able to use them in any context. You may never
1. Measure the maximum span. Adjust the table separation as
have to construct a parasail from a canvas camp tent and a
necessary to find the maximum table-to-table span that yields
wind tunnel fan (true story; S06E13), but it’s nice to know you a 5cm vertical deflection of the unloaded structure.
can.
2. Verify the maximum load capacity. Your bridge at
Also, co-workers. Working as part of a team just goes without maximum span may or may not be able to support the
saying, especially in engineering. Introvert or extrovert, required 3 kg load. You probably don’t want to break your
reserved or outgoing, you are going to have to be able to deal bridge. What are you going to do?
with people. In a professional setting, you can’t pick who you 3. Predict the max load at max span. How much load can your
work with, and you can’t simply walk away from a group or a bridge support when the span is maximized? Again, you
project because that one guy just annoys you and won’t ever probably don’t want to break your bridge.
shut up. 4. Document! Make sure that someone is recording the data on
paper. Also, you might consider using your phone camera to
Every time you’re assigned to a new project, you may find visually document your design, progress, and results. You’ll
yourself having to work with people you’ve never met, whose need all that information later.
skills are different from yours, and whose methods and habits
are unknown to you. And suddenly you have just over an ASSESS 15 MINUTES
hour to take a project from concept to completion. During the last fifteen minutes of class, your bridge will be
assessed based on your presented test results. If you are
OBJECTIVES prepared to be evaluated before that, you may be assessed
The specific goals for this exercise are: upon request.

 Reliving our teenage crush on Angus MacGyver 1. Maximum span. Demonstrate the maximum table-to-table
span for a 5cm vertical deflection of your unloaded bridge.
 Team-building in two words: rapid cohesion
 Developing individual and group creativity 2. Required load. If necessary, adjust the span of your bridge.
Demonstrate the capacity of your bridge to support the 1 kg
 Constructing, testing, and evaluating a physical structure concentrated load at or near the center of the span. Your
 Achieving awareness of, and working within, constraints bridge must sustain the load for a minimum of 20 seconds
 Completing a project within strict time limitations without failing.
3. Maximum load. Again, if necessary, adjust the span of your
MATERIALS bridge to its maximum. Your bridge will be loaded to what
You may use only the following materials to build your you have predicted will be its maximum capacity. If it
structure: sustains your predicted load, it will be incrementally loaded
until it fails. No one’s bridge survives.
 Newspaper: One complete Sunday Arkansas Democrat
Gazette REPORT
 Masking Tape: One full roll of adhesive tape To receive credit for the exercise, your team must submit a
 Chip board: One 10cm×10cm square to be used as a platform single brief report which addresses the following points.
for supporting a concentrated load  Design: briefly discuss your design, and the process by which
In addition, you may use measuring tools (meter sticks, your team arrived at it. Did your team use sketches to
measuring tape, standard masses, etc.) to test and assess your communicate? Did you arrive at the design by consensus, or
structure. Lastly, do not forget your phone–it’s a tool, not a by another means? Did your team plan the design, or did the
toy.

LAB 01: BUILDING A PAPER BRIDGE 29 AUGUST 2022


ENGR 1301: INTRODUCTION TO ENGINEERING FALL 2022

design just happen as time passed? How did the time limit professional peer who is aware of the design specifications
impact your design strategy? and knowledgeable of the constraints (as opposed to a general
 Resources: How well did you use your resources? Your reader without an engineering background).
obvious resources were paper, tape, tools, time, and
Make sure that you present professionally; please do not
manpower, and each had clear limits. Did you maximize the
submit handwritten pages. Handwritten submissions will
use of each of your resources? Which, if any, resources
incur an automatic 20% deduction. Hand-drawn sketches or
would you have liked to have more of? Did you have too
figures are always acceptable, and you may also always
much of anything?
include photographs in your report.
 Information: Did your team do any research or gather any
additional information? What kind of information did you All reports must be received no later than 6:00PM Monday, 12
seek out? How was it helpful? Sep, 2022. You must use the BlackBoard Assignment to
 Results: Present your test procedures and results. Make sure submit your work. Late reports will not be accepted, and you
that you present any numerical data in a clear, logical, and will receive a score of 0 for the exercise if your group does not
concise fashion. Did your predictions match the final testing? submit a written report.
If not, comment on how you formulated your predictions and
why you think those predictions failed.
 Reflection: What will you do differently when asked to repeat
the exercise? What constraints would you approach or
resources would you use differently? Are there any loopholes
(seriously, look for the loopholes–this is important for
multiple reasons)?

SUBMIT
For this project, the format of your report is left open. You
must address the points above, but you do not have to discuss
them in the same order as they are presented. Please be
concise; you should need no more than two pages to address
the issues adequately.
Please take a bit of time to consider what you have done and
how you have done it. Let this guide the structure of your
report, and keep in mind that your intended audience is a

GRADING RUBRIC
Your bridge and your report will be graded using the assessment rubric below. There are 30 points possible points for this
assignment, and because there are competitive elements to your design performance, every team will not earn a perfect score.

Assessment Criteria Points


Longest measured span 5 points
Unloaded Bridge: Measure the maximum
table-to-table span without exceeding a 5cm Second-longest span 4 points
vertical deflection
Shortest span 3 points

Bridge supports 1 kg load for 20 seconds 5 points


Required Load: Measure length of time (up
to 20sec) bridge can support 3 kg load at or Bridge supports 1 kg load for 10-20 sec 4 points
near center when adjusted to the team-
specified span Bridge supports 1 kg load for 5-10 sec 2 points

Bridge supports 1 kg load for < 5 seconds 1 point

Maximum load×span product 5 points


Maximum Load: Measure the maximum load
bridge can support when positioned at Second-highest load×span product 4 points
maximum span; calculate load×span
product in kg×cm Lowest load×span product 3 points

Bridge fails before maximum load applied 1 point

Report Content: Does the submitted report Reports will be carefully and individually assessed for 15 points

LAB 01: BUILDING A PAPER BRIDGE 29 AUGUST 2022


ENGR 1301: INTRODUCTION TO ENGINEERING FALL 2022

Assessment Criteria Points


contain the content required according to
the assignment specifications? completeness of content and for grammar, spelling, and usage.

Report Format: Is the submitted report Points may be deducted from your overall score for failing to follow
prepared and submitted according to the instructions (i.e., a handwritten report incurs an automatic 20% = 6 point
assignment specifications? deduction). Late reports will not be accepted.