KPI Tracking Table (KPITT) Template

Grant Application and Project Implementation Guidance / Resource

BASELINE MILESTONE 1 MILESTONE 2 ACTUAL


ACTIVITY INDICATOR TARGET
(date) (date) (project end date)

List each activity in the rows List each indicator in the Your Today’s value for the Actual indicator number at Actual indicator number at Final indicator number at the
of this column. rows of this column. Each projected indicator. This should be Milestone 1. This column Milestone 2. This column end of the project.
indicator should be linked to total number filled out at the beginning of should be filled out on a should be filled out on a
a specific activity, there can to be the project for each indicator specific date planned in the specific date planned in the
be more than one indicator achieved for - often it will be zero. project. It should be blank for project. It should be blank for
per activity. each the grant application. the grant application.
indicator.