Safety Drilling Rig Inspection Checklist
Safety Drilling Rig Inspection Checklist
Make a check if adequate "A" or inadequate "I" or "-" if not applicable (Note: Any "INADEQUATE" must have an explanation and be corrected)
(A) / (I) (A) / (I)
A. FUEL/WATER TANKS E. MUD PUMP AREA
1 No leaks 44 Pop valve shear pin correct size& length
2 Pumps guarded 45 Pop valve cover in place
3 Sign & Water/Fuel Tanks: 46 Guards in place and in good repair
a) No smoking sign posted 47 Hoses safely chained
b) Fuel sign posted 48 Fire extinguisher no.2 ? Inspection date
c) Dangerous goods placard posted 49 Housekeeping
50 Piping, valves and unions meet pressure rating
B. BOILER HOUSE 51 Pulsation dampeners
4 No clothing, etc. 52 Eyewash facility ? Fluid level
5 Sight glass guarded 53 Pop/bleed off lines secured & drainage
6 Pump guarded 54 Signs at Mud Pump area:
7 Fire extinguisher ? Inspection date a) Lockout Procedures posted
8 Safety valves: one year certification b) Auto Start sign posted
9 Boiler 25 m from wellhead c) Hearing Protection sign posted
10 Housekeeping d) No Smoking sign posted
11 Flames removed from around boiler 55 WIring/electrical fixtures - condition
12 Boiler Licence posted
13 Blow down line - location & installation of steam detector F. MUD TANK AREA, MUD PUMP SIZE AND TYPE
14 Fuel/water and steam line leaks 56 Mud degasser(s) size & placement
15 Chemical addition vessel (pot) at 57 Shale shaker belts guarded
boiler property labeled (WHMIS) 58 Handrails, walkways
59 Adequate ventilation (fan in mud mixing room)
C GENERATOR BUILDING 60 Adequate lighting
16 Generator/motor control center - size; condition 61 Personal protective equipment- eye protection
17 Receptacles/circuit breakers identified dust masks, rubber gloves/apron
18 Properly grounded (2grd rods 3 m apart) 62 Housekeeping
19 Wiring off the ground & property secured 63 Tank level indicators operative
20 No clothing/storage 64 Trip tank level indicator, tank location trip tank
21 Fans and belts guarded 65 Mud van, stairs, lighting
22 No fuel/oil leaks 66 Safety line rail - sump side of tanks
23 Compressor belts guarded 67 Eyewash facility ? Fluid levels
24 Fire extinguisher ? Inspection date 68 Signs at Mud tank area:
25 All lights protected a) Eye Protection signs at hoppers
26 Housekeeping b) No smoking sign posted
27 Rubber mat on floor at Motor Control Centre c) Corrosive sign at caustic drum
28 Battery condition d) Applicable WHMIS labeling
29 Signs at Generator Building: 69 Wiring/electrical fixtures - condition
a) Auto Start sign posted 70 Mud Tank Volume m3
b) Hearing Protection sign posted
c) Electrical/High Voltage signs posted G. SUBSTRUCTURE
d) Water Hose Caution sign posted 71 General condition
e) Lockout and Tagout Procedures 72 Matting condition
30 Wiring/electrical fixtures - condition 73 Drive pins installed c/w safety pins
31 Current turned off prior to connecting / 74 Spreaders in place
disconnecting extension cords 75 Vent doors/fan
76 Illumination
D. ACCUMULATOR AND TOOL HOUSE 77 Winterization condition
32 No leaks/spillage 78 Hydraulic control lines - condition fine guarded hoses
33 N2 bottles (12,500 kPa/1,800 psi) 79 Flow nipple split
34 Housekeeping 80 Stripper/mud catcher split
35 Storage of compressed gas cylinders, secured 81 Scaffolding/ladder(s) condition
36 Controls identified/accessible 82 Cellar area cribbed and drained
37 Safety device blind/shear ram controls 83 Wiring/electrical fixtures - condition
38 Fire extinguisher ? Inspection date 84 Housekeeping
39 Grinder tool rest 85 Casing Capacity lbs/kg
40 Eye protection available 86 Last CAODC inspection and level
41 Compressor guarded
42 Signs at Accumulator and tool House: H. BOP'S
a) Eye Protection sign posted 87 BOP and rig equipment conform to Government regulations
b) Auto Start signs: compressor/accumulator pump 88 Last CAODC inspection and level
c) Dangerous Goods placard WHMIS label 89 BOP secured properly
43 Accumulator reservoir vented outside of 90 Non-steel hydraulic lines fire sheathed
building/enclosure 91 Mud gas separator adequately connected meets
minimum requirements, including line sizes and tie downs
92 Required casing wear tests being performed
93 BOP pressure tests recorded and test
procedures satisfactory
Page 2 of 3
DRILLING RIG INSPECTION CHECKLIST
INSPECTOR: SIGNATURE: