DRILLING RIG INSPECTION CHECKLIST

CONTRACTOR: RIG NO.:


LEASE LOCATION AND LSD:
DATE: TIME:

Make a check if adequate "A" or inadequate "I" or "-" if not applicable (Note: Any "INADEQUATE" must have an explanation and be corrected)
(A) / (I) (A) / (I)
A. FUEL/WATER TANKS E. MUD PUMP AREA
1 No leaks 44 Pop valve shear pin correct size& length
2 Pumps guarded 45 Pop valve cover in place
3 Sign & Water/Fuel Tanks: 46 Guards in place and in good repair
a) No smoking sign posted 47 Hoses safely chained
b) Fuel sign posted 48 Fire extinguisher no.2 ? Inspection date
c) Dangerous goods placard posted 49 Housekeeping
50 Piping, valves and unions meet pressure rating
B. BOILER HOUSE 51 Pulsation dampeners
4 No clothing, etc. 52 Eyewash facility ? Fluid level
5 Sight glass guarded 53 Pop/bleed off lines secured & drainage
6 Pump guarded 54 Signs at Mud Pump area:
7 Fire extinguisher ? Inspection date a) Lockout Procedures posted
8 Safety valves: one year certification b) Auto Start sign posted
9 Boiler 25 m from wellhead c) Hearing Protection sign posted
10 Housekeeping d) No Smoking sign posted
11 Flames removed from around boiler 55 WIring/electrical fixtures - condition
12 Boiler Licence posted
13 Blow down line - location & installation of steam detector F. MUD TANK AREA, MUD PUMP SIZE AND TYPE
14 Fuel/water and steam line leaks 56 Mud degasser(s) size & placement
15 Chemical addition vessel (pot) at 57 Shale shaker belts guarded
boiler property labeled (WHMIS) 58 Handrails, walkways
59 Adequate ventilation (fan in mud mixing room)
C GENERATOR BUILDING 60 Adequate lighting
16 Generator/motor control center - size; condition 61 Personal protective equipment- eye protection
17 Receptacles/circuit breakers identified dust masks, rubber gloves/apron
18 Properly grounded (2grd rods 3 m apart) 62 Housekeeping
19 Wiring off the ground & property secured 63 Tank level indicators operative
20 No clothing/storage 64 Trip tank level indicator, tank location trip tank
21 Fans and belts guarded 65 Mud van, stairs, lighting
22 No fuel/oil leaks 66 Safety line rail - sump side of tanks
23 Compressor belts guarded 67 Eyewash facility ? Fluid levels
24 Fire extinguisher ? Inspection date 68 Signs at Mud tank area:
25 All lights protected a) Eye Protection signs at hoppers
26 Housekeeping b) No smoking sign posted
27 Rubber mat on floor at Motor Control Centre c) Corrosive sign at caustic drum
28 Battery condition d) Applicable WHMIS labeling
29 Signs at Generator Building: 69 Wiring/electrical fixtures - condition
a) Auto Start sign posted 70 Mud Tank Volume m3
b) Hearing Protection sign posted
c) Electrical/High Voltage signs posted G. SUBSTRUCTURE
d) Water Hose Caution sign posted 71 General condition
e) Lockout and Tagout Procedures 72 Matting condition
30 Wiring/electrical fixtures - condition 73 Drive pins installed c/w safety pins
31 Current turned off prior to connecting / 74 Spreaders in place
disconnecting extension cords 75 Vent doors/fan
76 Illumination
D. ACCUMULATOR AND TOOL HOUSE 77 Winterization condition
32 No leaks/spillage 78 Hydraulic control lines - condition fine guarded hoses
33 N2 bottles (12,500 kPa/1,800 psi) 79 Flow nipple split
34 Housekeeping 80 Stripper/mud catcher split
35 Storage of compressed gas cylinders, secured 81 Scaffolding/ladder(s) condition
36 Controls identified/accessible 82 Cellar area cribbed and drained
37 Safety device blind/shear ram controls 83 Wiring/electrical fixtures - condition
38 Fire extinguisher ? Inspection date 84 Housekeeping
39 Grinder tool rest 85 Casing Capacity lbs/kg
40 Eye protection available 86 Last CAODC inspection and level
41 Compressor guarded
42 Signs at Accumulator and tool House: H. BOP'S
a) Eye Protection sign posted 87 BOP and rig equipment conform to Government regulations
b) Auto Start signs: compressor/accumulator pump 88 Last CAODC inspection and level
c) Dangerous Goods placard WHMIS label 89 BOP secured properly
43 Accumulator reservoir vented outside of 90 Non-steel hydraulic lines fire sheathed
building/enclosure 91 Mud gas separator adequately connected meets
minimum requirements, including line sizes and tie downs
92 Required casing wear tests being performed
93 BOP pressure tests recorded and test
procedures satisfactory
Page 2 of 3
DRILLING RIG INSPECTION CHECKLIST

CONTRACTOR: RIG NO.:


LEASE LOCATION AND LSD:
DATE: TIME:
(A) / (I) (A) / (I)
94 Adequate heating b) no fuel/oil leaks
95 Manual ram locking wheels available c) motor shutoff
96 Degasser vents use appropriate fittings d) Fire Extinguisher (No. 1 )
e) exhaust system
I. DOGHOUSE 153 Stairs (min.3 exits) from rig floor
97 Heated as per regulations 154 Warning horn working
98 Adequate exits 155 Hydraulic and guards
99 Intercom meets regulations 156 Brakes satisfactory
100 Storage area, crew change area 157 Tugger line condition, guards
101 Housekeeping 158 V-door opening safety chained
102 Fire extinguisher ? Inspection date 159 Wiring/electrical fixtures - condition
103 Eye and hearing protection available 160 Floor height m/ft
104 EyeWash available ? Fluid level 161 Kelly Bushing height m/ft
105 First Aid kit stocked and clean
106 Safety belts L. DERRICK
107 Condition of available hand tools 162 Block hanging line
108 BOP controls, electrical, manual, air 163 Bumper blocks secured
109 Bulletin board 164 Fingers straight
110 Drilling Licence posted 165 Fingers chained
111 Emergency phone numbers posted 166 Wind board installed
112 Signs at Doghouse: 167 Ladder condition
a) Hard Hat sign posted 168 Escape line installed. No blockage of line (15 m clear)
b) Hearing Protection sign posted 169 Escape buggy installed & accessible
c) No Smoking sign posted 170 Climbing device/cages
d) Maximum holdback casing pressure posted 171 Derrick hand's belt & condition
e) Blowout procedure posted and readable 172 Guy lines/outrigger
f) MSDS available 173 Condition of crown sheaves
113 Wiring/electrical fixtures - condition 174 No loose tools - equipment cabled on derrick
175 All safety pins in place, secured
J. BREATHING APPARATUS INSPECTION 176 Lighting operation and safety cables/chains attached
114 Number of packs available, 2 units at 2 different locations 177 Inspect prior to raising/lowering and recorded
115 Spare bottles 178 Condition of tong counterweight assembly
116 General condition of apparatus and case 179 Wiring/electrical fixtures - condition
117 Condition of face piece 180 Last CAODC Mast inspection plus level
118 Condition of nose cup 181 Clearance height m
119 Cylinder pressure 182 Maximum static Hook load lbs/kg
120 Low pressure alarm operational
121 Cleanliness and storage M. TRAVELLING ASSEMBLY
122 Positive pressure capability 183 CAODC RP Inspection (Level and Date)
123 Number/condition of spare cylinders a) Block
124 Location of spare cylinders (chained) change shack b) Hook
125 Escape system or safety trailer c) Swivel
126 SCBA cylinders hydrostatic test dates and current d) Bails
127 Other e) Elevator
f) Load path items on top drive
K. RIG FLOOR 184 Weight indicator assembly
128 Lockouts on draw works 185 Weight indicator safety line
129 Compound/draw works guard 186 Automatic driller
130 Crown saver (check) 187 Drilling line condition (slip / cut program)
131 Catline 188 Deadline anchor condition
132 Catline divider and spools
133 Spinning chain/wrench lines N. PIPE RACK AREA
134 Headache post 189 Racks butt firmly to each other and catwalk
135 Kelly cock condition 190 Catwalk in good condition
136 Kelly hole condition 191 Stairs, condition
137 Kelly hose safety line - both ends 192 Pipe racks level
138 Line spooler/safety line 193 Pipe rack ends properly pinned
139 Backup posts condition 194 Spacer between racks sturdy and secure
140 Tongs - condition 195 Derrick stand in good condition
141 Last CAODC Tong inspection plus level 196 Housekeeping
142 Tong line and tong line clamps 197 V-door ramp in good condition
143 Slips - condition 198 Catwalk, tugger, guarded
144 Dog collar - condition 199 Lay down line and block condition
145 Stabbing valve and handle & X/O subs 200 Layers of drill pipe or casing properly choked
146 Test plugs 201 Adequate lighting
147 Mud can condition
148 Drilling controls and identification O. MANFOLD HOUSE
149 Brake handle hold-down cable/chain 202 Heated
150 Non-skid material around rotary 203 Valve handles installed
151 Lighting operational, floor & motor area 204 Proper gauges installed & positioned
152 Motors 205 Drill pipe pressure gauge installed
a) fans & belts guarded
Page 3 of 3
DRILLING RIG INSPECTION CHECKLIST

CONTRACTOR: RIG NO.:


LEASE LOCATION AND LSD:
DATE: TIME:
(A) / (I) (A) / (I)
206 Unobstructed view to rIg floor 233 H2S training(all crew members)
207 Housekeeping 234 BOP ticket - Drillers
208 Manifold design meets Gov't requirements 235 First Aid certificate (minimum one per crew)
209 Flare lines properly secured 236 Duplication see 233
210 Lighting operational 237 Drilling prognosis
211 Choke/valves open to degasser 238 Emergency Response Plan
212 Well to: 239 Accident reporting and recording
end of flare line 50 m 240 Well Site Emergency Contingency Manual
rubbish burn pile 50 m 241 Company policy statement posted
crude oil storage tank 50 m 242 Government Regulations available
213 Signs at Manifold House: 243 OH&S Regulations available
a) Hold Back Pressure notice posted 244 Drilling Rig Health and Safety Committee Guidelines
b) No Smoking sign posted 245 WHMIS training - all crew members
214 Choke & degasser lines & manifold prepared 246 MSDS' available - current
for winter operation (if applicable) 247 Daily rig check by Foreman & Rig Manager
248 Slip and cut program recorded
P. LEASE AREA 249 Safe work procedure for all jobs available for all workers
215 Adequate lighting 250 All certification and maintenance records for rig equipment
216 Lease clean and dry mast substructure BOP's, etc available on site
217 Flare pit properLy dug 50 m from wellbore 251 Clothing policy posted
218 Adequate ditching and drainage 252 New employee orientation training
219 Incinerator/garbage bin 253 PITS FAll protection training
220 Open pits (e.g.. Sump) guarded/fenced 254 CAODC FAll protection manual on site
221 Sump fluids properly diked
222 Lease properlydiked T. SAFETY/GENERAL
223 Overhead lines flagged 255 Condition of electric tools
224 Signs at Lease area: 256 Personal safety equipment being used
a) H2S Warning signs, if applicable 257 FAll restrainT system for any area over 3m
b) Poisonous Gas signs posted 258 RidE Rescue Equipment - inspected and maintained
c) "Tight Hole Status" sign posted 259 Lock out station Board
260 Visitor hard hats
S. TICKET/DOCUMENTS ('-' where not applicable) 261 Toxic gas equipment (detector & tubes)
225 BOP checks daily with records 262 Oxygen resuscitator available
226 BOP drill records and signed by Rig Manager 263 Adequate emergency vehicle available
and Foreman 264 Directional rig signs
227 Motor kills weekly with records 265 Stretcher, location ( No. 1)
228 Trip sheets completed 266 Fire retardant clothing available
229 Weekly safety meeting with records 267 Fire extinguishers checked weekly and current
230 Well control ticket: Rig Manager & Foreman hydrostatic test dates are current
231 BOP ticket - Drillers 268 Suitcasing/walkways
232 First Aid certificate (minimum one per crew) 269 Condition of handrails & stairs - toe boards
270 Date of last drill / exercise
U. COMMENT/EXPLANATION

INSPECTOR: SIGNATURE: