Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 1

The given plans are two architectural drawings of the Southwest Airport.

The first
one is the present existing structure and the second drawing is a proposal for
renovation of the airport to be completed by next year.

Overall, the thing not to be missed is that the size of the airport will increase
after its renovation where there will be addition of many facilities along with an
increment in the number of gates from 8 to 18.

Moving into details, looking at the entry/exit of the airport, at present there is
only one arrival and one departure gate but after renovation these will be doubled.
Further moving into the airport, on the left side there is only check-in facility
and a cafe opposite to it but there are proposals to add a bag drop and interchange
the positions of the present cafe and check-in. Further ahead, after the security
and passport control (which after renovation will not change) new shops will be
added. Here on, gates are there which, as mentioned earlier, are proposed to be
increased to 18 from 8 at the present time. As the size is going to expand, walk
away will be replaced by a sky trian for convinience. When people deboard they will
find new facilities after the custom clearance. These will include a coffee shop,
an ATM and a car hire facility before exiting from the arivals. These mentioned
facilities are not there at all at the present time.

You might also like