Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KLOSET

+0.150
KM
0.200
-0.050

R. JAGA
±0.000

TERAS
-0.050

FOR CONSTRUCTION
M A G A L T E M P O R A R Y

B'
C' A
B 6950
C 555
D 6950
508 4594
4594 555
E 508 3784
3784 1
508
F 4595
4595 508

7505
7505

3560
2

2755
±0.00
-1.20
±0.05 MUSHOLLA
DROP OFF
5745 TOILET
3

150
±0.00 150

1070
TAMAN STORAGE

150
3'
-0.05

150

925
TAMAN WUDHU
-0.05
4
TERAS

4395
7480

±0.00
-1.20 GALLERY
PAVILION MARKETING
OUTDOOR 5

-0.05
TERAS

-1.20
COVERED PEDESTRIAN

-0.050
TERAS ±0.000
R. JAGA

-0.050 0.200

KM
+0.150
KLOSET

1. KOORDINAT PANCANG 21/02/2023

B'
C' A
B
6950
C 555
6950
D 508 4594
4594 555
E 508 3784
3784 508
1
F 4595
4595 508

7505
7505

3560
2

2755
±0.00
-1.20 MUSHOLLA
±0.05
DROP OFF
5745 TOILET
3

150
±0.00 150

1070
TAMAN STORAGE 3'

150
-0.05

150

925
TAMAN WUDHU
-0.05 4
TERAS

palmscape

4395
7480

±0.00
-1.20 GALLERY
PAVILION MARKETING
OUTDOOR 5

-0.05
TERAS

-1.20
COVERED PED
RIAN EST
INDOCAM ARSITEKTUR INTERIOR
ph. +6221-5810014 | email. iai.project@gmail.com

-0.050
TERAS ±0.000
R. JAGA

-0.050 0.200

KM
+0.150
KLOSET

01 DENAH PANCANG MAGAL TEMPORARY


SKALA1 : 1500
NB: P1 = PANCANG 20X20 (20 TITIK), L = 15M (PDA TEST = 1 TITIK)

You might also like