IC - Concrete For Foundation

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

INSPECTION CHECKLIST (IC)

Principal: K92 Mining Limited


Designer:
Project Title:

IC – Concrete for Foundation


Lot No: Prepared by: Approved:
Date: Date:

ITP Ref. Activity Requirement Acceptance Addressed? Remarks


Criteria (Y/N)

1.0

2.0

2.0

3.0

3.0

3.0

3.0

3.0

3.0

4.0

COMMENTS:

Presented for Approval – Contractor Foreman Approved: K92 Project Engineer


Name: Name:
Signature: Signature:
Date: Date:
*NOTE: “The Specification” refers to the Technical Specification 116259.03.S001b, July 2021 revision, Latest
IFC Drawings refers to Kainantu Gold Mine TSF Review and Design Drawing filename 116259-03-2000- To 073.

728859601.docx 1

You might also like