Professional Documents
Culture Documents
Drainage Layout-Layout1
Drainage Layout-Layout1
Drainage Layout-Layout1
00
+134.25
+134.25
PLATFORM &
FUNDATION
TRANSFORMERS
EXISTING
PANTABANGAN
POWERHOUSE
+134.25
CONNECTION
ROAD BETWEEN
LOWER
COFFERDAM AND
SPILLWAY ACCESS
POWERHOUSE STRUCTURE ROAD
+126.40
FSL 129.00
+121.00
MOL 124.50
LOWER INLET/OUTLET
STRUCTURE
+121.00
LEGEND
OTHERWISE
GENERAL
1.
2.
3. NOTES:
ALL ELEVATIONS
COORDINATES
DIMENSIONS,
ARE
GIVEN
CHAINAGES
GIVEN
ARE
ININ
PRS92
AND
MASL
COORDINATES
/ PTM
(EGM08)
ZONE 3 COORDINATES
ARE GIVEN IN METRES, UNLESS STATED SECOND STAGE
BACK-FILL
REINFORCED
VIEW/SECTION
CONCRETE,
CONCRETE,
CONCRETE,
C20C25/C30
C25
BERM
4. ELECTROMECHANICAL
5.
NOT
THE
FOR
6.
7. THE
CONCRETE
HYDROMECHANICAL
BILL
SHOWN
REINFORCEMENT
CONTRACTOR
OF QUANTITIES.
INREINFORCEMENT
OUTLINE
SHALL
STEEL,
WORKS
DESIGN,
FOR
WORKS
VERIFY
REFER
DESIGN
TO
ISFOR
TO
INCLUDED
BECOORDINATES
BE
TO
INFORMATION
DESIGNED
CRITERIA
DESIGNED
THE EMPLOYER'S
IN THE
FOR
BYBY
AND
CONTRACTOR
WORKS
REGARDING
DESIGN
CONTRACTOR
TOPOGRAPHIC
REQUIREMENTS
OF
OFTHE
REINFORCEMENT
REINFORCEMENT
LOTELEVATIONS
B
A
ABASED
CONTRACT
IN VOLUME
ONAND
CONTENT,
THIS
EVEN
2.
REQUIREMENTS
OUTLINE
THOUGH
REFERDESIGN.
DESIGN
TO SEALING LAYER
RIP-RAP