SI NO: 0031 SITE INSTRUCTION 2022.03.06

Received by,

Gilmer
Manager
PNP construction
Windsor,ON.

Project: Holiday inn express. Phase: II Basement


Location: Oullet Avenue, Windsor, ON Inspection Date: 2022.03.05
Subcontractor: Gilmer Inspected by: Perarasan Devaraj,
Division: Electrical Project manager

Observation:
A problem with a structural beam interfering with the HVAC system of the building The conduit for
the lighting fixtures appears to be cast into the same structural beam that is interfering with the
Mechanical operations, according to the Electrical drawings.

Instruction:
Conduit line 01 must be routed beneath the beam (B1) at a 90ᵒ angle from the bottom of the slab to
the north side of the beam in a parallel direction of the beam. For your convenience, I've included a
section drawing of the circuit below. The deadline for completing the allocated assignment is 15th
March 2022. A shop drawing must be supplied and approved by the Project Manager before work
may begin.

Signature
Perarasan Devaraj.
JD Enterprises Pvt. Ltd
1037, Bruce Avenue, Windsor, ON.
JD ENTERPRISES PVT.LTD
1037, Bruce Avenue, Windsor, ON, N9A4Y1

Email:jdenterprices@gmail.com

____________________________________________________

SKETCH

You might also like