DURI-GENTF14GN000-MEC-LST-PHR-2003-00 Rev 0A AFU Equipment List (For Issue)
DURI-GENTF14GN000-MEC-LST-PHR-2003-00 Rev 0A AFU Equipment List (For Issue)
Contract No.:
SPHR00418A
APPROVED FOR USE
Suryana Natawidjaya
Date: Date:
Doc.
Field Area Discipline Originator Sequence Sheet Revision
Type
DOCUMENT CONTROL NO.
GENF14GN
DURI MEC LST PHR 2003 00 0A
000
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
Revision History:
Change Log:
Document Hold
i
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
Table of Contents
Page
Table of Contents......................................................................................................................1
1.0 INTRODUCTION .............................................................................................................2
2.0 OBJECTIVES ..................................................................................................................3
3.0 REFERENCES ................................................................................................................3
4.0 SUMMARY OF CALCULATION......................................................................................4
ATTACHMENT – 1 MECHANICAL EQUIPMENT LIST – Pre-FEED of the NDD-14 phase 2
(stage 3, 4 and 5) facilities ...........................................................................................5
Page 1 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
1.0 INTRODUCTION
COMPANY (Pertamina Hulu Rokan/PHR) requests CONTRACTOR (PT. Rekayasa
Engineering - Multi Karadiguna Jasa) to perform Pre-FEED of North Duri Development
Area 14 Phase 2 (Stage 3,4 and 5) EOR Steamflood.
Pre-FEED activities for the following multi disciplines: process, civil, mechanical, piping,
instrument, electrical, project management and operation assurance/readiness. The
scope of NDD Area-14 Phase 2 stage 3, 4, and 5 facilities consist of 147 wells, main road
& access road location, pipe corridors, power distribution facility, pigging facility, PWT skid,
bridges & canal.
Duri Field is located approximately 117 kilometers to the North of Pekanbaru City. Duri
Field was discovered in 1941 and started the primary production in 1955. The steamflood
EOR of Area 1 PK started in 1985 and continues to develop for the next areas up to Area
12 at 2008 and Area 13 at 2013. Currently, more than 10,000 wells have been drilled in
Duri field and have been developed into 13 development areas with an estimated
productive area of around 121 km2. The reservoirs in Duri Field have depth variation of
200 - 900 feet consisting of the Rindu, First, Second, and Baji-Jaga-dalam formations. The
Duri Steam Flood (DSF) field is the largest thermal enhanced oil recovery project in
Indonesia and located in Wilayah Kerja (WK).
The production and injection profile prediction method for the development of the NDD
Area 14 Phase-2 : Stage-3, 4, 5 (hereinafter referred to as PROJECT) project use the
Depletion Rate Model or the Steamflood Model. The initial process carried out is to
determine analog areas and regions based on the similarity of static and dynamic
properties, pattern size, target reservoir, steamflood maturity and analog surface facilities.
A12 (Area-12) is suitable area to be modeled and used for determining the performance
of A14 because they are still in one reservoir which is located in the up-dip Area 14 and
has the same development pattern, moreover the A14 facility will be connected to the A12
facility so that it will have a steam source with the same facility line as A12.
The initial development of NDD Area 14 Phase 2 stage 3,4,5 will cover following wells
number:
Page 2 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
2.0 OBJECTIVES
This document defines the Mechanical Equipment List Pre-FEED of the NDD-14 phase 2
(stage 3, 4 and 5) facilities. The Mechanical Equipment list has been developed based
on Equipment Sizing, Process Datasheet.
3.0 REFERENCES
The mechanical Equipment List is supplemented by the following documents :
• DURI-GENF14GN000-PRO-DAS-PHR-2005 CVC Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2006 New CVC Condensate Cooler
• DURI-GENF14GN000-PRO-DAS-PHR-2007 New CVC Transfer Pump
• DURI-GENF14GN000-PRO-DAS-PHR-2008 New CVC Condensate
Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2009 New CVC Condensate Transfer
Pump
• DURI-GENF14GN000-PRO-DAS-PHR-2010 New KO Drum
• DURI-GENF14GN000-PRO-DAS-PHR-2011 New overflow Tank
• DURI-GENF14GN000-PRO-DAS-PHR-2012 New Overflow tank
• DURI-GENF14GN000-PRO-DAS-PHR-2013 New Flare ( EGF )
• DURI-GENF14GN000-PRO-DAS-PHR-2014 New Vent Stack
• DURI-GENF14GN000-PRO-DAS-PHR-2015 New Condensate Cooler
• DURI-GENF14GN000-PRO-DAS-PHR-2016 New AWT Heater
• DURI-GENF14GN000-PRO-DAS-PHR-2017 New Gauging Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2018 New AWT Transfer Pump
Page 3 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
The Mechanical Equipment list and summary of demand calculation are as indicated in
Attachment-1
Page 4 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A
ATTACHMENT – 1
MECHANICAL EQUIPMENT LIST – Pre-FEED of the NDD-14 phase 2 (stage 3, 4
and 5) facilities
Page 5 of 5
28-Dec-23 Approved For Use BK ASW SN
MECHANICAL EQUIPMENT LIST - ALTERNATIVE 1 - PRE-FEED PROJECT NDD A14 PHASE 2 (STAGE 3, 4 AND 5) 06-Nov-23 Issue For Review BK ASW SN
POWER / UNIT DESIGN CONDITIONS OPERATING CONDITION DIMENSIONS / UNIT WEIGHT / UNIT
Brake Horse
P&ID NO/ Hydraulic power FLOW / DUTY LENGTH WIDTH/ID HEIGHT DRY OPER. TEST
MATERIAL OF power
ITEM EQUIPMENT NO DESCRIPTION SERVICE FLUID ORIENTATION Quantity PRESS TEMP PRESSURE TEMP REMARKS
EQUIPMENT
REFERENCE DOCUMENT NO.
o
hp hp MMscfd psig ( F) psig (oF) ft-in ft-in ft-in Lbs Lbs Lbs
DURI-GENF14GN000-PRO-PID-PHR-2038-00
3 x 100% (2 running (Lead/Lag)
10 8145.P.0901 A/B/C CVC TRANSFER PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2028-00 Horizontal Carbon Steel 7.82 10.42/each 219 GPM 82 279 81.80 ( Disch Press ) 279 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
and 1 Standby)
DURI-GENF14GN000-PRO-PID-PHR-2037-00
2 x 100% (1 running and 1
11 8145.P.0902 A/B CVC CONDENSATE PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2030-00 Horizontal Carbon Steel 7.82 10.42 /each 108 GPM 100 279 81.80 ( Disch Press ) 250 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
Standby)
8145.P.0703C CORROSION INHIBITOR PUMPS CHEMICAL DURI-GENF14GN000-PRO-PID-PHR-2045-00 Vertical SS316 1 x 100% 0.5 0.7/each 3.99 GPH 1970 185 90 ( Disch Press ) AMB 1'-4.7" 1'-2.6" 2-3.4" 2.093,80 4.187,60 4.187,60 Dosing pump API 675
XXXX.V.XXXXA/B CORROSION INHIBITOR CONTAINER CHEMICAL DURI-GENF14GN000-PRO-PID-PHR-2045-00 RECTANGULAR 2 0.5 0.7/each 261 Gallon ATM + FOW 150 ATM AMB 0'-43" 0'-36" 0'-39" 3.705,00 5.324,50 5.845,00 Supply by Company
XXXX.V.XXXXA/B DEMULSIFIER CONTAINER CHEMICAL DURI-GENF14GN000-PRO-PID-PHR-2045-00 RECTANGULAR 2 261 Gallon ATM + FOW 150 ATM AMB 0'-43" 0'-36" 0'-39" 3.705,00 5.472,00 5.845,00 Supply by Company
18 8145.Z.1703 AIR TREATMENT/DRYER PACKAGE AIR DURI-GENF14GN000-PRO-PID-PHR-2043-00 Vertical Manufacture Std. 1 x 100 % - - 68 scfm 150 150 125 250 0'-5" (ID) 2'-3" 132,24 132,24 132,24
HVAC PACKAGE FOR INSTRUMENT 2 x 100% (1 running and 1 HVAC 2 X 100 % capacity means Compressor package + AHU and 1 X
21 XXXX FREON - - Manufacture Std. 133 1238 CFM 25-50 PA 65 - - - - - - - -
CONTROL BUILDING Standby) 100 % capacity for ducting & Damper
22 8145.F.1702 FLAME FRONT GENERATOR HC GAS + AIR DURI-GENF14GN000-PRO-PID-PHR-2042-00 RECTANGULAR Manufacture Std. 1
1,3320 lb/h ( Shell side ) 77/6,5 ( in/out ) shell side 321,9/321,4 ( in/out ) shell side
1 8145.X.0701 A/B AWT HEATER CONDENSATE DURI-GENF14GN000-PRO-PID-PHR-2035-00 Horizontal Manufacture Std. 2 x 100% (INTERMITTENT) - - 300 ( Shell & Tube Side ) 410 ( Shell & Tube Side )
7,6680 lb/h ( Tube side ) 7/5 ( in/out) Tube side 86/200 ( in/out) Tube side
DURI-GENF14GN000-PRO-PID-PHR-2034-00
3 8145.P.0701 A/B AWT PUMP CONDENSATE Horizontal Manufacture Std. 2 x 100% (INTERMITTENT) 9,8 1/each 100 gpm 600 400 135,3 ( Disch Press ) 65-210 7'-9" 2'-3.6" Ø DIA 1.097,59 1.370,89 1.370,89
DURI-GENF14GN000-PRO-PID-PHR-2035-00
CGS-10
1 8107.P.1000G KILL WATER PUMP PRODUCED WATER DURI-GENF14GN000-PRO-PID-PHR-2062-01 Horizontal Manufacture Std. 1,00 - 344,00 1170 GPM 650 150 432,9 95 7'-9" 2'-3.6" Ø DIA 1.097,59 1.370,89 1.370,89
AWT AUTOMATIC WELL TEST 1. This data is preliminary only, actual dimension will updated during detail design ( after received VENDOR data / information )
CGS CENTRAL GATHERING STATION N/A NOT APPLICABLE 2. Detail information / actual data will provided by VENDOR during detail design.
VENDOR TO
EGF ENCLOSED GAS FLARE (*) / VTA
ADVISE
MECHANICAL EQUIPMENT LIST - ALTERNATIVE 2 - PRE-FEED PROJECT NDD A14 PHASE 2 (STAGE 3, 4 AND 5) 06-Nov-23 Issue For Review BK ASW SN
POWER / UNIT DESIGN CONDITIONS OPERATING CONDITION DIMENSIONS / UNIT WEIGHT / UNIT
P&ID NO/ Hydraulic power Brake Horse power FLOW / DUTY LENGTH WIDTH/ID HEIGHT DRY OPER. TEST
MATERIAL OF
ITEM EQUIPMENT NO DESCRIPTION SERVICE FLUID ORIENTATION Quantity PRESS TEMP PRESSURE TEMP REMARKS
EQUIPMENT
REFERENCE DOCUMENT NO.
hp hp MMscfd psig (oF) psig (oF) ft-in ft-in ft-in Lbs Lbs Lbs
DURI-GENF14GN000-PRO-PID-PHR-2038-00
3 x 100% (2 running (Lead/Lag)
10 8145.P.0901 A/B/C CVC Transfer PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2028-00 Horizontal Carbon Steel 7.82 10.42/each 219 GPM 82 279 81.80 ( Disch Press ) 279 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
and 1 Standby)
DURI-GENF14GN000-PRO-PID-PHR-2037-00
2 x 100% (1 running and 1 81.80 ( Disch Press
11 8145.P.0902 A/B CVC CONDENSATE PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2030-00 Horizontal Carbon Steel 7.82 10.42 /each 108 GPM 100 279 250 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
Standby) )
8145.P.0703C CORROSION INHIBITOR PUMPS CHEMICAL DURI-GENF14GN000-PRO-PID-PHR-2045-00 Vertical SS316 1 x 100% 0.5 0.7/each 3.99 GPH 1970 185 90 ( Disch Press ) AMB 1'-4.7" 1'-2.6" 2-3.4" 2.093,80 4.187,60 4.187,60 Dosing pump API 675
18 8145.Z.1703 AIR TREATMENT/DRYER PACKAGE AIR DURI-GENF14GN000-PRO-PID-PHR-2043-00 Vertical Manufacture Std. 1 x 100 % - - 68 scfm 150 150 125 250 0'-5" (ID) 2'-3" 132,24 132,24 132,24
Carbon Steel with CA = 2350 mm ( Mayor barrel ) 4700 20" ( Mayor barrel )
20 8145.V.1705 PIG RECEIVER HC LIQUID DURI-GENF14GN000-PRO-PID-PHR-2061-00 Horizontal 1 - - - 385 300 50 91-221 - 1884 1948 4233
0.125" (*) mm ( Minor barrel ) 16" ( Minor barrel )
HVAC PACKAGE FOR INSTRUMENT 2 x 100% (1 running and 1 HVAC 2 X 100 % capacity means Compressor package + AHU and 1 X
21 XXXX FREON - - Manufacture Std. 133 1238 CFM 25-50 PA 65 - - - - - - - -
CONTROL BUILDING Standby) 100 % capacity for ducting & Damper
22 8145.F.1702 FLAME FRONT GENERATOR HC GAS + AIR DURI-GENF14GN000-PRO-PID-PHR-2042-00 RECTANGULAR Manufacture Std. 1
PWT GASLIQUID CYLINDRICAL DED by Company ( Specification Follow PWT at Existing facility of
1 8145.V.0702 A/B CONDENSATE DURI-GENF14GN000-PRO-PFD-PHR-2007-00 Vertical 2 Unit
CYCLONE stage 1,2 )
CGS-10
1 8107.P.1000G KILL WATER PUMP PRODUCED WATER DURI-GENF14GN000-PRO-PID-PHR-2062-01 Horizontal Manufacture Std. 1 295,0 421,40 1170 GPM 601 120 432,9 95 7'-9" 2'-3.6" Ø DIA 1.097,59 1.370,89 1.370,89
LEGEND:
CGS CENTRAL GATHERING STATION N/A NOT APPLICABLE 1. This data is preliminary only, actual dimension will updated during detail design ( after received VENDOR data / information )
CVC CASING VAPOR COLLECTION AMB AMBIENT 2. Detail information / actual data will provided by VENDOR during detail design.
VENDOR TO
EGF ENCLOSED GAS FLARE (*) / VTA
ADVISE
MECHANICAL EQUIPMENT LIST - ALTERNATIVE 3 - PRE-FEED PROJECT NDD A14 PHASE 2 (STAGE 3, 4 AND 5) 06-Nov-23 Issue For Review BK ASW SN
POWER / UNIT DESIGN CONDITIONS OPERATING CONDITION DIMENSIONS / UNIT WEIGHT / UNIT
Brake Horse
P&ID NO/ Hydraulic power FLOW / DUTY LENGTH WIDTH/ID HEIGHT DRY OPER. TEST
MATERIAL OF power
ITEM EQUIPMENT NO DESCRIPTION SERVICE FLUID ORIENTATION Quantity PRESS TEMP PRESSURE TEMP REMARKS
EQUIPMENT
REFERENCE DOCUMENT NO.
o
hp hp MMscfd psig ( F) psig (oF) ft-in ft-in ft-in Lbs Lbs Lbs
DURI-GENF14GN000-PRO-PID-PHR-2038-00
3 x 100% (2 running (Lead/Lag)
10 8145.P.0901 A/B/C CVC Transfer PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2028-00 Horizontal Carbon Steel 7.82 10.42/each 219 GPM 82 279 81.80 ( Disch Press ) 279 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
and 1 Standby)
DURI-GENF14GN000-PRO-PID-PHR-2037-00
2 x 100% (1 running and 1
11 8145.P.0902 A/B CVC CONDENSATE PUMPS CONDENSATE DURI-GENF14GN000-PRO-CAL-PHR-2030-00 Horizontal Carbon Steel 7.82 10.42 /each 108 GPM 100 279 81.80 ( Disch Press ) 250 75'-0" 133'-4" 63'-4" 1.873,40 2.336,24 2.336,24 API 610 Horizontal Centrifugal Pump
Standby)
8145.P.0703C CORROSION INHIBITOR PUMPS CHEMICAL DURI-GENF14GN000-PRO-PID-PHR-2045-00 Vertical SS316 1 x 100% 0.5 0.7/each 3.99 GPH 1970 185 90 ( Disch Press ) AMB 1'-4.7" 1'-2.6" 2-3.4" 2.093,80 4.187,60 4.187,60 Dosing pump API 675
18 8145.Z.1703 AIR TREATMENT/DRYER PACKAGE AIR DURI-GENF14GN000-PRO-PID-PHR-2043-00 Vertical Manufacture Std. 1 x 100 % - - 68 scfm 150 150 125 250 0'-5" (ID) 2'-3" 132,24 132,24 132,24
HVAC PACKAGE FOR INSTRUMENT CONTROL 2 x 100% (1 running and 1 HVAC 2 X 100 % capacity means Compressor package + AHU and 1 X
21 XXXX FREON - - Manufacture Std. 133 1238 CFM 25-50 PA 65 - - - - - - - -
BUILDING Standby) 100 % capacity for ducting & Damper
22 8145.F.1702 FLAME FRONT GENERATOR HC GAS + AIR DURI-GENF14GN000-PRO-PID-PHR-2042-00 RECTANGULAR Manufacture Std. 1
1,3320 lb/h ( Shell side ) 77/6,5 ( in/out ) shell side 321,9/321,4 ( in/out ) shell side
1 8145.X.0701 AWT HEATER CONDENSATE DURI-GENF14GN000-PRO-PID-PHR-2035-00 Horizontal Manufacture Std. 1 - - 300 ( Shell & Tube Side ) 410 ( Shell & Tube Side ) DED by Company
7,6680 lb/h ( Tube side ) 7/5 ( in/out) Tube side 86/200 ( in/out) Tube side
DURI-GENF14GN000-PRO-PID-PHR-2034-00
3 8145.P.0701 A/B AWT TEST PUMP CONDENSATE Horizontal Manufacture Std. 2 x 100% (INTERMITTENT) 0.72 1,00 15 gpm 600 400 78,0 200-260 7'-9" 2'-3.6" Ø DIA 1.097,59 1.370,89 1.370,89 DED by Company
DURI-GENF14GN000-PRO-PID-PHR-2035-00
1 8145.V.0702 PWT GASLIQUID CYLINDRICAL CYCLONE CONDENSATE DURI-GENF14GN000-PRO-PFD-PHR-2009-00 Vertical 1 Unit DED by Company ( Follow PWT at Existing facility of stage 1,2 )
2 8145.V.0703 PWT TEST SEPARATOR CONDENSATE DURI-GENF14GN000-PRO-PFD-PHR-2009-00 Horizontal 1 Unit DED by Company ( Follow PWT at Existing facility of stage 1,2 )
3 8145.P.0702 PRODUCTION FLUID PUMP CONDENSATE DURI-GENF14GN000-PRO-PFD-PHR-2009-00 Horizontal 1 Unit DED by Company ( Follow PWT at Existing facility of stage 1,2 )
4 8145.V.0704 BASKET STRAINER CONDENSATE DURI-GENF14GN000-PRO-PFD-PHR-2009-00 Vertical 1 Unit DED by Company ( Follow PWT at Existing facility of stage 1,2 )
CGS-10
1 8107.P.1000G KILL WATER PUMP PRODUCED WATER DURI-GENF14GN000-PRO-PID-PHR-2062-01 Horizontal Manufacture Std. 1,00 - 344,00 1170 GPM 650 150 432,9 95 7'-9" 2'-3.6" Ø DIA 1.097,59 1.370,89 1.370,89
LEGEND:
CGS CENTRAL GATHERING STATION N/A NOT APPLICABLE 1. This data is preliminary only, actual dimension will updated during detail design ( after received VENDOR data / information )
CVC CASING VAPOR COLLECTION AMB AMBIENT 2. Detail information / actual data will provided by VENDOR during detail design.
VENDOR TO
EGF ENCLOSED GAS FLARE (*) / VTA
ADVISE