Professional Documents
Culture Documents
6 Single Phase AC Voltage Controller With R and RL Loads
6 Single Phase AC Voltage Controller With R and RL Loads
OBJECTIVE:
To study the operation and performance of single phase AC voltage
regulator with R, RL load.
APPARATUS REQUIRED:
S.No Equipment
1 Device module
2 Resistive load
3 Firing circuit
4 Load inductor
5 CRO
CIRCUIT DIAGRAM:
EXPECTED WAVEFORMS:
FORMULA TO BE USED:
For R-Load:
RMS output voltage for R load is given by
For RL-Load:
RMS output voltage for RL load is given by
THEORY:
The operation of the circuit is explained with RL load. During positive half
cycle SCR1 is triggered into conduction at a firing angle dealy α. The current raises
slowly due to the load inductance. The current continue to flow even after the
supply voltage reverses polarity because of the stored energy in the inductor.
As long as SCR1 conducts, conduction drop across it, will reverse bias
SCR2. Hence SCR2 will not turn on even if gating signal is applied. SCR2 can be
triggered into conduction during negative half cycle after SCR1, turns off. The
relevant waveforms are shown in fig. for continuous current and discontinuous
current modes of operation respectively.
PROCEDURE:
CONNECTION PROCEDURE:
FOR R-LOAD:
1.Connect cathode K1 of SCR1 to anode A3 of SCR3.
2.Connect anode A1 of SCR1 to cathode K3 of SCR3.
3.Connect 24V AC output P terminal to Anode A1 of SCR1.
4.Connect load resistor R1 end to cathode K1 os SCR1.
5.Connect load resistance R2 end to N terminal of 24V AC output.
6.Connect CRO probe across the load terminal R1 and R2.
7.Connect voltmeter or digital multimeter across the load terminals.
PULSE PATCHING:
EXPERIMENTAL PROCEDURE:
1.Switch ON the trainer power ON/OFF switch.
2.Switch ON the 24V AC ON/OFF switch.
3.Switch ON the debounce logic switch.
4.Vary the control voltage knob minimum to maximum step by step.
5.For each step note down the output voltage, firing angle and tabulate using table1.
6.Then find out the calculated output voltage using the formula given above and
check whether measured one.
TABLE1
CONNECTION PROCEDURE:
FOR RL-LOAD:
1.Connect cathode K1 of SCR1 to anode A3 of SCR3.
2.Connect anode A1 of SCR1 to cathode K3 of SCR3.
3.Connect 24V AC output P terminal to Anode A1 of SCR1.
4.Connect load resistor R1 end to cathode K1 os SCR1.
5.Connect load resistance R2 end to L1 end of load inductor.
6.Connect load inductor L2 end to N terminal terminal of 24V AC output.
7.Connect CRO probe across the load terminal RL Load.
8.Connect voltmeter or digital multimeter across the RL load terminals.
PULSE PATCHING:
EXPERIMENTAL PROCEDURE:
1.Switch ON the trainer power ON/OFF switch.
2.Switch ON the 24V AC ON/OFF switch.
3.Switch ON the debounce logic switch.
4.Vary the control voltage knob minimum to maximum step by step.
5.For each step note down the output voltage, firing angle, extinction angle and
tabulate using table2.
6.Then find out the calculated output voltage using the formula given above and
check whether measured one.
TABLE-2
RESULT:
VIVA QUESTIONS: