CERTIFICATE OF COMPLETION

Project: INSTALLATION OF OILER BOX (2 PCS), AND MAIN RAIL GUIDE SHOE (4 PCS)
C2/4 LEFT SIDE
Client: THE CAMBRIDGE VILLAGE
Location: 2F Office The Clubhouse, The Cambridge Village Condominium, Blk 19,
Eastbank Rd. Brgy. San Andres Floodway, Cainta, Rizal 1900

This is to certify that the above-stated project was satisfactorily completed last September
27, 2023 (Wednesday), in accordance with the scope of works and specifications agreed by
the CLIENT’S REPRESENTATIVE and by “INFINIACCESS AND BUILDERS CORPORATION.”

“This is also to certify that the unit is Running under all Normal Conditions and witnessed by
the Client”

This Certification will serve as a reference for acceptance of the client that “INFINIACCESS
AND BUILDERS CORPORATION” complied with all agreed works to be accomplished.

DESCRIPTION:

Oiler Box (2 pcs) – PO # E-2022-0344

Main Rail Guide Shoe (4 pcs) – PO # E-2022-0416

CLIENT REPRESENTATIVE:
_______________________________
Signature Over Printed Name

Prepared by:

ENGR. VANN MIGUEL B. SAMBLACEÑO


Project Mechanical Engineer
INFINIACCESS AND BUILDERS CORPORATION