Professional Documents
Culture Documents
Draft Calculation SM GOLDEN 9200
Draft Calculation SM GOLDEN 9200
Final
INITIAL 1,609.668 MT
INTERMEDIATE 10,777.298 MT
Balance -32.369 MT
Retase Sublot Sample 312
Rata-Rata Tonnase per Rate DT 29.383 MT
Estimasi Kekurangan DT (±) -1 Muh. Redzky S R
Estimasi Keseluruhan Retase 313 Attending Surveyor
INTERPOLASI
INITIAL
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
0.900 1,615.974 0.000 0.000 1.000 0.000
0.9000 1,615.974 0.000 0 1.4000 0.000
1.000 1,809.396 0.000 0.000 0.000 0.000
FINAL
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
5.100 10,639.146 0.000 0.000 5.220 0.000
5.1813 10,819.521 0.000 0 5.6813 0.000
5.200 10,861.146 0.000 0.000 5.230 0.000
Unit ;
45.72 91.44
INTERMEDIATE
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
4.560 9,045.000 -1.432 22.070 4.180 165.250
5.1813 10,411.750 -1.152 22.38062 5.6813 181.764
4.580 9,089.000 -1.423 22.080 4.190 165.360
Unit ;
0.03048
Draft (m) MTC-2 (T-M)
1.000 0.000
0.4000 0.0000
0.000 0.000
Diff MTC 0.000
1st Trim 0.000
2nd Trim 0.000
Total Corr 0.000
Draft (m) MTC-2 (T-M)
4.220 0.000
4.6813 0.000
4.230 0.000
Diff MTC 0.000
1st Trim 0.000
2nd Trim 0.000
Total Corr 0.000
0
0
0 _*
*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*
*_INTERMEDIATE_*
*Daily Report,*
February 22, 2024
0
0
0
*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*
*_FINAL_*
*Daily Report,*
February 22, 2024
0
0
0
*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*