Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 6

Initial

Portside Starboard side

Depan 1.00 1.00

Tengah 0.90 0.90

Belakang 0.80 0.80

Final

Portside Starboard side

Depan 5.20 5.20

Tengah 5.10 5.10

Belakang 5.65 5.65


DRAUGHT SURVEY CALCULATION FOR BARGE
Generals Particulars
Applycant :
Description of Cargo : Nickel Ore
Name Vessel :
Call Sign :
Flag :
Gross Tonnage TB BG :
Owners :
Name of Master :
Port of Shipment :
Port of Destination :
Attending Date : -
Consignor/Contractor :

Loaded of PlimSoll Mark : - MT


Plan of Cargo : 9,200.000 MT
LBP/Lenght Overall : 91.44 meter 300 feet
Draft Statement 11:00-11:30 LT 14:00-14:30 LT
INITIAL FINAL
PORT STBD MEAN PORT STBD MEAN
Draft Forward 1.00 1.00 1.000 5.20 5.20 5.200
Stem Correction - -
Corrected to F.P.P 1.000 5.200
Draft After 0.80 0.80 0.800 5.65 5.65 5.650
Stern Corrected - -
Corrected by A.P.P 0.800 5.650
Mean Draft Fwd.& Aft 0.9000 5.4250
Draft Midship 0.90 0.90 0.900 5.10 5.10 5.100
Mean of Means 0.90000 5.26250
Draft Corrected for Hogging
and Shaging 0.900000 5.181250
Displacement 1,615.974 10,819.521
Trim by Head/Stern -0.200 0.450
Corrected for Trim (1st/2st) - -
Displacement Corrected for Trim 1,615.974 10,819.521
Observed Density 1.021 1.021
Correction for Density -6.306 -42.223
Displacement Corrected for Density 1,609.668 10,777.298
Total Consumable Store & Ballast
Displacement Corrected for Cons, -
Store & Ballast 1,609.668 10,777.298
Corrected Displacement :

INITIAL 1,609.668 MT
INTERMEDIATE 10,777.298 MT

Total Cargo Loaded/Discharged 9,167.631 MT


Persentase 99.65%

Balance -32.369 MT
Retase Sublot Sample 312
Rata-Rata Tonnase per Rate DT 29.383 MT
Estimasi Kekurangan DT (±) -1 Muh. Redzky S R
Estimasi Keseluruhan Retase 313 Attending Surveyor
INTERPOLASI
INITIAL
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
0.900 1,615.974 0.000 0.000 1.000 0.000
0.9000 1,615.974 0.000 0 1.4000 0.000
1.000 1,809.396 0.000 0.000 0.000 0.000

FINAL
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
5.100 10,639.146 0.000 0.000 5.220 0.000
5.1813 10,819.521 0.000 0 5.6813 0.000
5.200 10,861.146 0.000 0.000 5.230 0.000

Unit ;
45.72 91.44

INTERMEDIATE
Draft (Meter) Displ. (MT) LCF/MF (M) TPC (T) Draft (m) MTC-1(T-M)
4.560 9,045.000 -1.432 22.070 4.180 165.250
5.1813 10,411.750 -1.152 22.38062 5.6813 181.764
4.580 9,089.000 -1.423 22.080 4.190 165.360

Unit ;
0.03048
Draft (m) MTC-2 (T-M)
1.000 0.000
0.4000 0.0000
0.000 0.000
Diff MTC 0.000
1st Trim 0.000
2nd Trim 0.000
Total Corr 0.000
Draft (m) MTC-2 (T-M)
4.220 0.000
4.6813 0.000
4.230 0.000
Diff MTC 0.000
1st Trim 0.000
2nd Trim 0.000
Total Corr 0.000

Total Corr Err:520


Draft (m) MTC-2 (T-M)
3.180 146.290
4.6813 188.325
3.190 146.570
Diff MTC -6.561
1st Trim -12.693
2nd Trim -0.727
Total Corr -13.420
INITIAL
*Daily Report,*

0
0
0 _*

Initial : Dec, 30 1899 ; 11:00-11:30 LT


Plan to loaded : ± 6200 MT
Weather : Drizzle
Sea Condition : Smooth
Job Desk : Draught Survey & Sampling

*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*

*_INTERMEDIATE_*
*Daily Report,*
February 22, 2024
0
0
0

*_Initial : Dec, 30 1899 ; 11:00-11:30 LT _*


Intermediate : Dec, 30 1899 ; 14:00-14:30 LT
Plan to loaded : ± 6200 MT
Retase : 312
*_Est. Cob : 9,167.631 MT_*
*_Balance : 2,967.631 MT_*
Weather : Overcash
Sea Condition : Smooth
Job Desk : Draught Survey & Sampling

*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*

*_FINAL_*
*Daily Report,*
February 22, 2024
0
0
0

Initial : Dec, 30 1899 ; 11:00-11:30 LT


Final : Dec, 30 1899 ; 14:00-14:30 LT
Plan to loaded : ± 6200 MT
*_Est. Cob : 9,167.631 MT_*
Weather : Overcash
Sea Condition : Smooth
Job Desk : Draught Survey & Sampling

*_Regards;_*
*_Ardiansyah Arsyad_*
*_Attending Surveyor_*

You might also like