Republic of the Philippines

REGION IX, ZAMBOANGA PENINSULA

PROVINCE OF ZAMBOANGA SIBUGAY


MUNICIPALITY OF MALANGAS
Candiis, Malangas, Zamboanga Sibugay

CY 2024 PROJECT
AS - PLAN FOR
CONCRETING OF ROAD LEADING TO TECHNICAL VOCATIONAL SCHOOL
MARCELO BAQUIAL SR. CAMPUS, MABINI
Sta. 00 + 000 - Sta 00 + 097.50
NET LENGTH - - - - - - - - - - - - - 97.50 Ln.m.

PREPARED : CHEKED & REVIEWED BY: RECOMMENDED: APRROVED:

JAYBETH G. BETINOL ENGR. VICTOR L. LAGUNA ELPIDIO T. POTAYRE HON. MARCELO M. BAQUIAL JR., REE.
Mun. Engineer OIC, MPDO Local Executive Officer
Date : Date : Date : Date :
Republic of the Philippines
REGION IX, ZAMBOANGA PENINSULA

PROVINCE OF ZAMBOANGA SIBUGAY N


INDEX OF SHEETS: MUNICIPALITY OF MALANGAS
1 - 2 Title Page, LM & VM
Candiis, Malangas, Zamboanga Sibugay
BEG. OF PROJ.
3 - Typical Plans 00 + 000.00

4 - Standard Plan of RCPC ENG OF PROJ.


00 + 100.00

5 - Plan & Profile


6- Geo Map CY 2020 PROJECT
7 - Cross Section
DETAILED ENGINEERING DESIGN PLAN FOR
CONCRETING OF ROAD LEADING TO TECHNICAL VOCATIONAL SCHOOL
PROJECT LENGTH: MARCELO BAQUIAL SR. CAMPUS, MABINI
BRGY. POB. MALANGAS, ZAMBOANGA SIBUGAY
Beg. of Project ------ 00 + 000.00
Sta. 00 + 000 - Sta 00 + 097.50

End of Project ------ 00 + 097.50


NET LENGTH - - - - - - - - - - - - - 97.50 Ln.m.
Length ------ 97.50 ln.m.
LOCATION MAP

THIS SITE

VICINITY MAP

PROJECT TITLE: PREPARED BY: SHEET NO.:


Republic of the Philippines CONCRETING OF ROAD LEADING TO TECH. VOC. 1. VICINITY MAP
Province of Zamboanga Sibugay SCHOOL MARCELO BAQUIAL SR., CAMPUS, 2. LOCATION MAP 02
MUNICIPALITY OF MALANGAS MABINI JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE 3. SITE DEVELOPMENT
4. QTY. SHEET 07
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer Municipal Mayor
MPDC
GENERAL NOTES:
1. Alignments and grades are subject to adjustment to suit actual field conditions.
23. Exact locations, gradients, lengths, top and invert elevations, of all drainage structures that required and
additional cross drainage structures observed necessary to suit actual field conditions shall be determined
2. Distances and elevations are in meters unless indicated otherwise.
in the field by the Engineer.

3. Grade shown are top of subgrade preparation.


24. Widening should be applied on the inner side of the curve and attained linearly along the required super
elevation run-off or doing spiral transition.
4. All works shall comply with the Standard Specifications for Highways and Bridges, Revised 2004.
LEGEND:
25. All existing cross drainage including those for extension shall be thoroughly checked for its strength/stability
5. Where no detours are available, traffic shall be handled in accordance with the provision of
during implementation such that corrections can be made prior to the paving of Item 311.
article 7.7 of the general requirements and covenants. LVC = LENGTH OF VERTICAL CURVE
26. Use of steel form is mandatory.
6. When directed by the engineer or shown on the plans, unsuitable subgrade materials shall be PVC = POINT OF VERTICAL CURVATURE
excavated below ground surface to the required width and depth, the area excavated shall
27. Weakened plane for the Item 311 - shall be done using concrete cutter at the right age.
be backfilled with approved materials. No embankment materials shall be placed until foundation PVT = POINT OF VERTICAL TANGENCY
is suitable. Excavation shall be paid for under "Item 102-Excavation" and backfilled materials shall
28. Longitudinal grooving shall be provided at the outside/external edge of concrete of slab for future
be paid for under "Item 104-Embankment" (Selected Borrow)
widening of pavement. PVI = POINT OF VERTICAL INTERSECTION
7. Cut slopes except in rocks and all fill slopes shall be rounded at the top and bottom at intersections
29. Barricade, danger signals and warning signs: in addition to traffic services services ( road signs and bollards) Mo = MIDDLE ORDINATE
of cut and fill, slope shall be adjusted and warp to flow into each other, into natural surface without
provided in the contract. the contractor furnish, erect and maintain at his own risk all necessary barricade,
noticeable break.
suitable sufficient light, danger signals, signals signs and other traffic works and safety of the public Rv = APPROXIMATE RADIUS OF VERTICAL CURVE
throughout the duration of the project.
8. Watering and compacting of all embankment shall be considered as subsidiary works pertaining to
other contract. The cost of performance thereof shall be included in the contract unit price bid other item. g1, g2 = GRADES IN PERCENT
30. All conditions and requirements in the Environmental Compliance Certificate (ECC) shall be strictly compiled.

9. The Contractor shall continuously keep the road undergoing improvement and section detours in such Lo = DISTANCE TO LOWEST OR HIGHEST POINT
31. Bunkhouse shall be located on government own / donated lot and shall be turn over to the LGU after the
condition satisfactory to the Engineer that the traffic will be accommodated during the entire contract
completion of the project. x = DISTANCE FROM PVC OR PVT TO ANY
period without any inconvenience to the traveling public in accordance with Articles 38 Part 7 of the
Requirements and Conditions of the Contract shall bear all expenses of constructing if necessary and POINT ON CURVE
32. The Implementing Office shall identify the locations of and provide accessibility facilities for persons with
maintaining such road detours, approaches, intersections and any accessory features including y = VERTICAL OFFSET AT DISTANCE X
disability in accordance with D.O. # 37 series of 2009.
run-around temporary bridges without direct compensation.

33. Date Surveyed: _________________ 20____.


10. Unsuitable materials excavated and other excess excavation (waste) shall be disposed of or used for the
filling low places within free haul limits at the direction of the engineer. No direct payment be made for
this work as the cost of performance thereof is considered to be included in the unit price bid for
"Item 102(1)-Unsuitable Excavation". MATERIALS SPECIFICATION:
11. Cut in earth shall be rolled as designated by "Item 105-Subgrade Preparation" of the Standard Specification
for Highways and Bridges, revised 2004. No direct payment shall be made for this work and shall be 1. Aggregates for base course shall consist of hard, durable particles natural gravel and filler of natural sand
considered subsidiary work pertaining to other contract items. or other mineral matter. the composite material shall be free of vegetable matter, lumps or balls of clay
and shall be of such nature that it can be compacted readily to form a firm, stable base.
12. All embankment shall be constructed in accordance with the requirement of "Item 104-Embankment" of
the Standard Specifications for Highways and Bridges, revised 2004. Grading Requirement:
Sieve Designation Mass % of Passing
13. Watering and compacting of all embankments shall be considered as subsidiary work pertaining to other Standard (mm) US Standard (inch)
contract items. The cost of performance thereof shall be considered to be included in the contract unit 50 2" 100
price bid for those items. 37.50 1 1/2" -
25 1" 60 - 95
14. Approaches and road connections shall be constructed by the contractor as shown in the plans or as 19 3/4" -
directed by the engineer in such a manner as to ensure proper connections of the riding surfaces. 12.5 1/2" 35 - 65
4.75 No. 4 20 - 50
15. The necessary drawings contained are the DPWH Standard Drawings for Roads and Bridges shall be utilized 0.425 No. 40 5 - 20
for the project unless otherwise a more detailed drawing is specified and/or provided and approved. 0.075 No. 200 -
-Cut/Fill slopes stake will depend upon the stability of material.
-The thickness of the pavement structure was based on their design of the existing pavement. The fraction passing of the the no. 200 sieve shall not be greater than 2/3 of the fraction passing the no. 40
sieve. the fraction passing no. 40 sieve shall have a liquid limit not greater then 25 and plasticity index not PVI
x
16. On cut sections, actual subgrade CBR shall be determined at the sufficient intervals after excavation to greater then 6 as determined by AASHTO T-89 and T-90. the material passing the 3/4" sieve shall have a
subgrade level, such that pavement thickness shall be adjusted to suit the actual CBR determined during soaked CBR value of not less than 80% as determined by AASHTO T-193. the CBR value shall be obtained at
Mo
implementation. the maximum dry density as determined by AASHTO T-180, Method D.

y
+g1 -g2

17. Cut sections subject to reinvestigation during implementation. 2. Fine Aggregate passing No. 10 shall consist of natural sand stone screening or other inert materials with
similar characteristics having hard strong and durable particles approved by the Engineer. The use of
18. Any miscellaneous removal not shown in the plans including removal of headwall and wing walls of existing beach sand will not be allowed unless washed thoroughly of its salinity and with prior approval of the
drainage structures that are to be extended or improved and the disposal of resulting materials shall be Project Engineer. PVC PVT

considered as subsidiary works pertaining to other contract items. The cost of performance thereof shall be LVC/2 LVC/2
considered to be included in the unit price bid for those items. 3. All concrete shall have a minimum Compressive Strength at 14 days where fc' = 24.1 MPa (3500 psi).
LVC

19. Extensions and other improvements of existing drainage structures are subject to changed and shall be
determined in the field by the Project Engineer. 4. All exposed corners shall be chamfered 0.20 m. No construction joints are to be made except where
shown. When bottom slab is subject to Abrasion, add 0.025 m to bottom slab to increase coverage on steel. VERTICAL PARABOLIC CURVE
21. Extensions and other improvements of existing drainage structures are subject to changed and shall be
5. All reinforcing steel to be intermediate Grade 40, with deformation conforming to ASTM A - 305 where
determined in the field by the Project Engineer.
fy = 275.60 MPa (40,000 psi).
22. During constructions, any existing pipes found damaged or defective shall be removed by the contractor Where:
6. Concrete protection for reinforcement shall not be less than the following:
and replaced at the direction of the Engineer. Removal of existing structures shall be paid for under LVC (g2 - g1)
a. Concrete in contact with ground - 75 mm PI = Point of horizontal intersection
"Item 103 - Structure Excavation", the pipes to be installed shall be paid for under "Item 500 - Pipe Culvert Mo =
b. Concrete surface exposed to water flow PVC = Point of vertical curvature
and Storm Drainage". 800
for bars greater than #5 - 50 mm PVT = Point of vertical tangency
for #5 bars and smaller - 40 mm LVC = Length of vertical curve (in meter)
x 2 (Mo)
y = g1g2 = Gradient
(LVC)
2 Mo = Middle Ordinate
x = Distance from PVC or PVT to any point of the curve
y = Vertical offset with respect to distance x
7. Lapping of bars or splices shall be 40 bar diameter, splices shall be staggered.

PROJECT TITLE: PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET NO.:
Republic of the Philippines 1. AS SHOWN ABOVE
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
03
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor
4.50 4.50 4.50

1.50
SHOULDERING

0.13

2.50

TRANSVERSE JOINT
12 mm Ø Deformed Bars
spaced @ 0.60 m O.C.

8.00
0.60

spaced @ 0.30 m O.C.


LONGITUDINAL JOINT

16 mm Ø Plain Bars
2.50
SHOULDERING

1.50
0.13
0.60

NEADWALL
(STONE MASONRY)

WINGWALL
(STONE MASONRY)

CROSS SECTION OF 910 MMØ RCPC WITH HH, WW & CUT OFF WALL

TOP PLAN 1-LINE 910 MM Ø RCPC FRONT ELEVATION

PROJECT TITLE: PREPARED BY: SHEET NO.:


Republic of the Philippines 1. AS SHOWN ABOVE
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
04
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
Municipal Engineer MPDC Municipal Mayor
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY
TWO LINES OF CIRCULAR
REINFORCEMENT

SECTION - 4A

3mm
TWO LINES OF CIRCULAR REINFORCEMENT
4A

1. ALL JOINTS, UNLESS OTHERWISE SPECIFIED SHALL BE FILLED WITH STIFF MORTAR
LONGITUDINAL SECTION COMPOSED OF ONE PART PORTLAND CEMENT AND TWO PARTS SAND.
df = bc + 15cm FOR PIPES 76.2cmØ
bc + 75cm FOR PIPES 76.2cmØ
2. MORTAR SHALL BE PLACED TO FORM A DURABLE, WATERTIGHT JOINT.

3. ADDITIONAL MORTAR SHALL BE USED TO FORM A BEAD AROUND THE OUTSIDE


OF THE JOINT.

4. MATERIALS TO BE USED SHALL SATISFY THE DPWH TECHNICAL SPECIFICATIONS. ROLLER COMPACTED
EMBANKMENT COMPACTED GRANULAR
BACKFILL

bc + 10cm

THOROUGHLY TAMPED EARTH


14 MPa CONC.
OR BETTER MIN = bc/10cm
pbc/10

pbc
GROUND bc bc
MAX. p = 0.7
STEP 2 - STEP 3 -
CONSTRUCT COMPACTED EMBANKMENT TRENCH THROUGH THIS COMPACTED COMPLETE EMBANKMENT IN
TO AN ELEVATION ABOVE TOP OF EMBANKMENT AND INSTALL PIPE BACK- USUAL MANNER.
THE PROPOSED PIPE. FILL WITH COMPACTED GRANULAR
MATERIAL.
EARTH CUSHION
EARTH ACCURATELY SHAPED
TO FIT PIPE
MIN = bc/10

EARTH OR ROCK
ROCK
CALIFORNIA METHOD 'A'
MIN = 3bc/10

MIN = 1/4 INSIDE DIAMETER


FINISHED GRADE
FIRST CLASS BEDDING
CONCRETE CRADDLE BEDDING

TYPICAL BEDDING FOR PROJECTING CONDUITS df = 2bc


df = DEPTH OF FILL
ROLLER COMPACTED
bc = OUTSIDE DIAMETER OF PIPE
EMBANKMENT

COMPACTED GRANULAR
ROLLER COMPACTED BACKFILL
EMBANKMENT

GROUND bc bc

STEP 1 - STEP 2 - STEP 3 -


CONSTRUCT COMPACTED EMBANKMENT TRENCH THROUGH THIS COMPACTED FILL REMAINDER OF TRENCH WITH BACKFILL
TO A TOTAL DEPTH EQUAL TO TWICE EMBANKMENT AND INSTALL PIPE BACK- PLACE IN LOOSEST POSSIBLE CONDITION.
THE OUTSIDE DIAMTER OF THE PIPE. FILL WITH COMPACTED GRANULAR
MATERIAL TO TOP OF PIPE. COMPLETE EMBANKMENT IN NORMAL MANNER.

CALIFORNIA METHOD 'B'

15" 375
METHODS OF PIPE INSTALLATION
18" 450

21" 525

24" 600

27" 675
P P

I.D. SIZE OF PIPE


30" 750

33" 825

C
A
B

E
36" 900

42" 1050

48" 1200

54" 1350

60" 1500
DETAIL OF RCP ENDS
THE DISTANCE FROM CENTERLINE OF THE REINFORCEMENT TO THE NEAREST SURFACE REFERENCE:
OF THE CONCRETE HAS BEEN ASSUMED AS 0.032m FOR PIPES WITH A SHELL
THICKNESS OF 0.064m OR MORE. AASHTO-STANDARD SPECIFICATIONS FOR TRANSPORTATION MATERIALS & METHODS
OF SAMPLING AND TESTING

PROJECT TITLE: PREPARED BY: SHEET NO.:


Republic of the Philippines 1. RCCP TYPICAL CIP
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
PLAN 05
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor
ITEMS OF WORK ITEMS OF WORK ITEMS OF WORK

LEGEND:
Item No. Quantity Item No. Quantity
Item No. Quantity
Item 102 2.851m2 Item 102 1.879m2
Item 102 6.456m2
Item 104 0.287m2 Item 104 0.067m2
Item 104 0.000m2
Item 105

Item 200(1)
9.585 m Item 105

Item 200(1)
8.536 m
Item 105 10.277 m Item 105
1.800m2 1.800m2
Item 200(1) 1.800m2
Item 311 1.00m² Item 311 1.00m²
Item 311 1.00m²

CL Item 200(1)

C
L CL Item 311

Item 102

Item 104

ITEMS OF WORK ITEMS OF WORK


ITEMS OF WORK
Item No. Quantity
Item No. Quantity
Item No. Quantity
Item 102 3.624m2
Item 102 2.851m2
Item 102 3.408m2
Item 104 0.059m2
Item 104 0.476m2
Item 104 0.000m2
Item 105 9.695 m
Item 105 10.885 m
Item 105 10.874m
Item 200(1) 1.800m2
Item 200(1) 1.800m2
Item 200(1) 1.800m2
Item 311 1.00m²
Item 311 1.00m²
Item 311 1.00m²

C
L
CL CL

PROJECT TITLE: PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET NO.:
Republic of the Philippines 1. CROSS SECTIONS
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
PROFILE 06
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor
PROJECT TITLE: PREPARED BY: SHEET NO.:
Republic of the Philippines
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR. 1. LONGITUDINAL 07
STAND-ALONE SENIOR HIGH SCHOOL, MABINI PROFILE
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
2. V-GEOMETRY 08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor 3. H-GEOMETRY
PROJECT TITLE: PREPARED BY: SHEET NO.:
Republic of the Philippines
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR. 1. SUPER ELEVATION 08
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor