CY 2024 PROJECT
AS - PLAN FOR
CONCRETING OF ROAD LEADING TO TECHNICAL VOCATIONAL SCHOOL
MARCELO BAQUIAL SR. CAMPUS, MABINI
Sta. 00 + 000 - Sta 00 + 097.50
NET LENGTH - - - - - - - - - - - - - 97.50 Ln.m.
JAYBETH G. BETINOL ENGR. VICTOR L. LAGUNA ELPIDIO T. POTAYRE HON. MARCELO M. BAQUIAL JR., REE.
Mun. Engineer OIC, MPDO Local Executive Officer
Date : Date : Date : Date :
Republic of the Philippines
REGION IX, ZAMBOANGA PENINSULA
THIS SITE
VICINITY MAP
9. The Contractor shall continuously keep the road undergoing improvement and section detours in such Lo = DISTANCE TO LOWEST OR HIGHEST POINT
31. Bunkhouse shall be located on government own / donated lot and shall be turn over to the LGU after the
condition satisfactory to the Engineer that the traffic will be accommodated during the entire contract
completion of the project. x = DISTANCE FROM PVC OR PVT TO ANY
period without any inconvenience to the traveling public in accordance with Articles 38 Part 7 of the
Requirements and Conditions of the Contract shall bear all expenses of constructing if necessary and POINT ON CURVE
32. The Implementing Office shall identify the locations of and provide accessibility facilities for persons with
maintaining such road detours, approaches, intersections and any accessory features including y = VERTICAL OFFSET AT DISTANCE X
disability in accordance with D.O. # 37 series of 2009.
run-around temporary bridges without direct compensation.
y
+g1 -g2
17. Cut sections subject to reinvestigation during implementation. 2. Fine Aggregate passing No. 10 shall consist of natural sand stone screening or other inert materials with
similar characteristics having hard strong and durable particles approved by the Engineer. The use of
18. Any miscellaneous removal not shown in the plans including removal of headwall and wing walls of existing beach sand will not be allowed unless washed thoroughly of its salinity and with prior approval of the
drainage structures that are to be extended or improved and the disposal of resulting materials shall be Project Engineer. PVC PVT
considered as subsidiary works pertaining to other contract items. The cost of performance thereof shall be LVC/2 LVC/2
considered to be included in the unit price bid for those items. 3. All concrete shall have a minimum Compressive Strength at 14 days where fc' = 24.1 MPa (3500 psi).
LVC
19. Extensions and other improvements of existing drainage structures are subject to changed and shall be
determined in the field by the Project Engineer. 4. All exposed corners shall be chamfered 0.20 m. No construction joints are to be made except where
shown. When bottom slab is subject to Abrasion, add 0.025 m to bottom slab to increase coverage on steel. VERTICAL PARABOLIC CURVE
21. Extensions and other improvements of existing drainage structures are subject to changed and shall be
5. All reinforcing steel to be intermediate Grade 40, with deformation conforming to ASTM A - 305 where
determined in the field by the Project Engineer.
fy = 275.60 MPa (40,000 psi).
22. During constructions, any existing pipes found damaged or defective shall be removed by the contractor Where:
6. Concrete protection for reinforcement shall not be less than the following:
and replaced at the direction of the Engineer. Removal of existing structures shall be paid for under LVC (g2 - g1)
a. Concrete in contact with ground - 75 mm PI = Point of horizontal intersection
"Item 103 - Structure Excavation", the pipes to be installed shall be paid for under "Item 500 - Pipe Culvert Mo =
b. Concrete surface exposed to water flow PVC = Point of vertical curvature
and Storm Drainage". 800
for bars greater than #5 - 50 mm PVT = Point of vertical tangency
for #5 bars and smaller - 40 mm LVC = Length of vertical curve (in meter)
x 2 (Mo)
y = g1g2 = Gradient
(LVC)
2 Mo = Middle Ordinate
x = Distance from PVC or PVT to any point of the curve
y = Vertical offset with respect to distance x
7. Lapping of bars or splices shall be 40 bar diameter, splices shall be staggered.
PROJECT TITLE: PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET NO.:
Republic of the Philippines 1. AS SHOWN ABOVE
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
03
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor
4.50 4.50 4.50
1.50
SHOULDERING
0.13
2.50
TRANSVERSE JOINT
12 mm Ø Deformed Bars
spaced @ 0.60 m O.C.
8.00
0.60
16 mm Ø Plain Bars
2.50
SHOULDERING
1.50
0.13
0.60
NEADWALL
(STONE MASONRY)
WINGWALL
(STONE MASONRY)
CROSS SECTION OF 910 MMØ RCPC WITH HH, WW & CUT OFF WALL
SECTION - 4A
3mm
TWO LINES OF CIRCULAR REINFORCEMENT
4A
1. ALL JOINTS, UNLESS OTHERWISE SPECIFIED SHALL BE FILLED WITH STIFF MORTAR
LONGITUDINAL SECTION COMPOSED OF ONE PART PORTLAND CEMENT AND TWO PARTS SAND.
df = bc + 15cm FOR PIPES 76.2cmØ
bc + 75cm FOR PIPES 76.2cmØ
2. MORTAR SHALL BE PLACED TO FORM A DURABLE, WATERTIGHT JOINT.
4. MATERIALS TO BE USED SHALL SATISFY THE DPWH TECHNICAL SPECIFICATIONS. ROLLER COMPACTED
EMBANKMENT COMPACTED GRANULAR
BACKFILL
bc + 10cm
pbc
GROUND bc bc
MAX. p = 0.7
STEP 2 - STEP 3 -
CONSTRUCT COMPACTED EMBANKMENT TRENCH THROUGH THIS COMPACTED COMPLETE EMBANKMENT IN
TO AN ELEVATION ABOVE TOP OF EMBANKMENT AND INSTALL PIPE BACK- USUAL MANNER.
THE PROPOSED PIPE. FILL WITH COMPACTED GRANULAR
MATERIAL.
EARTH CUSHION
EARTH ACCURATELY SHAPED
TO FIT PIPE
MIN = bc/10
EARTH OR ROCK
ROCK
CALIFORNIA METHOD 'A'
MIN = 3bc/10
COMPACTED GRANULAR
ROLLER COMPACTED BACKFILL
EMBANKMENT
GROUND bc bc
15" 375
METHODS OF PIPE INSTALLATION
18" 450
21" 525
24" 600
27" 675
P P
33" 825
C
A
B
E
36" 900
42" 1050
48" 1200
54" 1350
60" 1500
DETAIL OF RCP ENDS
THE DISTANCE FROM CENTERLINE OF THE REINFORCEMENT TO THE NEAREST SURFACE REFERENCE:
OF THE CONCRETE HAS BEEN ASSUMED AS 0.032m FOR PIPES WITH A SHELL
THICKNESS OF 0.064m OR MORE. AASHTO-STANDARD SPECIFICATIONS FOR TRANSPORTATION MATERIALS & METHODS
OF SAMPLING AND TESTING
LEGEND:
Item No. Quantity Item No. Quantity
Item No. Quantity
Item 102 2.851m2 Item 102 1.879m2
Item 102 6.456m2
Item 104 0.287m2 Item 104 0.067m2
Item 104 0.000m2
Item 105
Item 200(1)
9.585 m Item 105
Item 200(1)
8.536 m
Item 105 10.277 m Item 105
1.800m2 1.800m2
Item 200(1) 1.800m2
Item 311 1.00m² Item 311 1.00m²
Item 311 1.00m²
CL Item 200(1)
C
L CL Item 311
Item 102
Item 104
C
L
CL CL
PROJECT TITLE: PREPARED BY: CHECKED & REVIEWED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENTS: SHEET NO.:
Republic of the Philippines 1. CROSS SECTIONS
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR.
PROFILE 06
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor
PROJECT TITLE: PREPARED BY: SHEET NO.:
Republic of the Philippines
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR. 1. LONGITUDINAL 07
STAND-ALONE SENIOR HIGH SCHOOL, MABINI PROFILE
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
2. V-GEOMETRY 08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor 3. H-GEOMETRY
PROJECT TITLE: PREPARED BY: SHEET NO.:
Republic of the Philippines
Province of Zamboanga Sibugay CONCRETING OF ROAD @ MARCELO BAQUIAL SR. 1. SUPER ELEVATION 08
STAND-ALONE SENIOR HIGH SCHOOL, MABINI
MUNICIPALITY OF MALANGAS JAYBETH G. BETINOL VICTOR L. LAGUNA ELPIDIO T. POTAYRE MARCELO M. BAQUIAL JR., REE
08
LOCATION: BRGY. MABINI, MALANGAS, ZAMBOANGA SIBUGAY Municipal Engineer MPDC Municipal Mayor