Sub Surface Dam - PDF 1
Sub Surface Dam - PDF 1
SCALE 1:50
OVERFLOW SECTIONS
2.00
2.50
0.50
1.00
1.50
DESIGN PROCEDURE
650
0 b3
0.50
1.00
1.50
D = Depth of overflow
D
500 plus safety (M) b2
2.00
2.50
0.50
1.00
1.50
0 1. Storage requirements H 1
1400
b1
(M)
0 (M)
b
H1 1.00 2. Q and length of overflow
Section Depth of overflow d
1400
1.00
H 1.00
H 2.00
3. Depth of overflow plus safety
1.40
D = 1.5d +0.1m.
2.00
2.00 4. Height of wing wall
3.00
H = H1+D
3.00 5. H2= H - 1.4m.
3.00
4.00 (1.4m fixed by stability calculations)
4.00
6. H = 1.4m - D
4.00
650
7. Base width from graphs
5.00
b b1
Upstream Downstream
500
5.00 H 2 (M) NOTE: max. D = 1.4m
b b1
b b1
H 1 (M)
Upstream Downstream
H (M)
200 200
75
200
FINAL STAGE
Rubber Waterbar A
A 2. STAGE
DETAIL OF CREST VERTICAL UPSTREAM
1. STAGE
300 (INITIAL ELEVATION)
VIEW FROM UPSTREAM
R4
00 EXPANSION JOINTS SECTION A-A
SCALE 1:50
H (M) 1 2 3 4 5
R (CM) 20 25 30 35 40
10mm open joint
NUMBER AND ELEVATIONS OF REQUIRED A
CONSTRUCTION STAGES HAVE TO BE ESTIMATED
THE DEPTH OF THE TRENCH MIGHT ACCORDING TO SEDIMENT TRANSPORT OF
BE ALTERED ACCORDING TO THE ROCK Rubber Waterbar RESPECTIVE RIVERS
ENCOUNTERED
D = 0.8m 850
650 H = 2.50m no overflow
Sand
1400
SHUTTERING OF MASONRY
D=300
Rolled Rubber
STANDARD CROSS SECTIONS
600
500
Water Bar
150
Masonry in mortar 1:4
SUB-SURFACE DAMS
(Natural stones)
3800
150 200
3200
2900
1400
200
400
400
CONCRETE 1:3:6
with plums
2nd CASTING DESIGNED REDMER G. SHEET: 2 of 2
H=1100m
1st CASTING
400
CONCRETE 1:3:6
with plums TRACED NYANGOKA M. P. AUG. 1979
SCALE: AS SHOWN
300
300
350
CONCRETE 1:3:6
with plums Phase 2. DIGITIZED J.G. Muturi APRIL 2010
T=300
T=250