1 PURPOSED
This Work Instruction will be as the guideline for Maintenance personnel to perform
Absorber System Inspection.
2 SCOPE
This Work Instruction will be applied for Absorber System Inspection at Tanjung Jati
B Power Plant. The works not mentioned in this instruction will be performed in
accordance with drawings and appropriate specifications then will be considered to be
added in this Work Instrcution later. This Work Instruction is refer to O&M manual from
OEM.
3 RESPONSIBILITY
The Maintenance Manager has responsibility for updating this instruction.
The Maintenance Engineer has responsibility to control maintenance works made
according to the instruction and co-ordinate with other teams during planning and
report activities to the Maintenance Manager.
The Maintenance Engineer and Supervisor have responsibility to plan, supervise and
report of maintenance works which are undertaken in accordance with this procedure.
The Maintenance Technician has responsibility to implement the Works Instruction in
safe manner.
Work Instruction 2 (11)
Petunjuk Kerja
4 DETAIL OF WORKS
4.1 Preparation
1. Work will carried out during Outage.
2. Work should be carried out by 15 peoples and distribute in several area in group.
3. Prepare all necessary documents (Easy Laser D279 Instructions Manual Doc. No. 05-
0100 REV 7 - EASY LASER D279 and inspection report form prior to start of work).
4. Prepare the necessary parts, tools and equipment before commencing actual work.
5. Confirm that the equipment is isolated and a permit to work is available before
commencing work.
6. Prepare a suitable lay-down area.
2. Spanner set: 10 mm, 11 mm, 12 mm, 14 mm, 19 mm, 29 mm, 30 mm, 34 mm.
3. Hammer, punch, screw driver set, measuring tape.
4. Fire hose and nozzle 2 ½ Inch.
5. DC Lamp set.
6. Cable roll.
Work Instruction 4 (11)
Petunjuk Kerja
and some pieces shell one by one header (totally 15 header). Please coordinate with
operator for manufer the valves and for not interfere the second unit FGD absorber
operations.
12. After pipe is clear for pluuged material and the nozzle also clean, please reinstall all
nozzle to the lateral pipes. Please replace some defected nozzles.
gearbox high speed hub (design reference by Hibon is 177.85 mm). If necesarry move
the motor away from the gear box to reach design reference value.
5 REFERENCE
1. Easy Laser D279 Instructions Manual Doc. No. 05-0100 REV 7 - EASY LASER
D279.
6 ATTACHEMENT
1. List of spare parts use for Absorber System Inspection.
2. Easy Laser D279 Instructions Manual Doc. No. 05-0100 REV 7 - EASY LASER
D279.
Work Instruction 10 (11)
Petunjuk Kerja