Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
1.1 Entering Tronox premises Security not notified about S Production delays 1.Elimination:
1
4
2
12
16
L
L
the delivery *None
Fairbreeze 2.Substitution:
Expansion * None
project 3.Engineering:
* None
4.Administrative:
* The security at the RSF entrance or
Bridge 4 entrance will be notified in
advance about the delivery of the
containers and material.
5.PPE:
* None
1.2 Contracting Covid 19 H Serious illness or death 1.Elimination:
3
300
1000
10
10
H
H
Fairbreeze * None
Expansion 2.Substitution:
project *None
3.Engineering:
* None
4.Administrative:
* All the employee’s temperatures will be
taken before allowed access to site.
Employees will complete the declarations
forms each morning. Keep a safe distance
of 1.5 meters away from each always.
*Sanitizer and clean water for washing
hands will be available for the team on site.
5.PPE:
*Wearing a cloth mask is compulsory.
1.3 Unauthorised employees on S Serious injuries 1.Elimination:
M
135
7.5
4
1
30
H
Fairbreeze site Work stoppage * None
Expansion 2.Substitution:
project *None
3.Engineering:
* None
4.Administrative:
* No employee will be allowed to perform
any task on site without the following –
- Medical
- KBC Induction
- Tronox access badge
* Visitors / Delivery drivers will adhere to
Tronox access requirements.
5.PPE:
*None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
M
225
7.5
6
1
45
H
Fairbreeze MINI Risk Assessment / Damage to property * None
Expansion 2.Substitution:
JSRA not completed (Lack
project *None
of information) 3.Engineering:
* None
4.Administrative:
* Before any work commences, the
supervisor will evaluate the work area and
compile the MINI Risk Assessment
according to the site conditions. The Mini
Risk Assessment will be communicated to
the team and attendance register will be
signed.
5.PPE:
*None
2.1 Driving to the site camp S Injuries 1.Elimination:
2.5
4
2
50
20
L
Fairbreeze Delivery trucks / vehicles Soil contamination * None
Expansion 2.Substitution:
not inspected
project *None
3.Engineering:
* None
4.Administrative:
* Delivery trucks / vehicles will be inspected
by a Tronox designated person (William)
before allowed access to site.
5.PPE:
*None
2.2 S Serious injuries 1.Elimination:
M
135
7.5
6
1
45
H
Fairbreeze Routes to site not identified Production loss *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* Routes to the offloading area will be
determine by Leomat Construction and
communicated to SSG
* The location of the laydown area will be
discussed with the driver.
* The drivers will be escorted to the site.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
1
4
5
40
20
L
Fairbreeze *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* In the event the RSF entrance is blocked
off, the Bridge 4 entrance will be used for
access.
5.PPE:
* None
2.4 Delivery trucks / vehicles S Serious injuries 1.Elimination:
M
100
5
4
5
60
H
Fairbreeze not escorted Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* Delivery trucks / vehicles will be escorted
to the site.
5.PPE:
* None
2.5 Driver not adhering to S Serious injuries 1.Elimination:
M
100
5
4
5
60
H
Tronox road rules. Property damage *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* The drivers will adhere to all Tronox road
rules.
* Disciplinary hearing will be held with those
not following the rules.
* All drivers will adhere to Tronox Traffic
Management Plan.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
3.1 Set-up the crane truck Containers offloaded in the S Injuries 1.Elimination:
2.5
4
2
50
20
L
Fairbreeze wrong location Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* The laydown area will be agreed upon
between Loemat construction and
Stefanutti Stocks. The supervisor will
ensure the containers is offloaded in the
correct area.
5.PPE:
* None
3.2 Uneven ground levels S Injuries 1.Elimination:
2.5
4
2
50
20
L
Property damage *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* The ground level will be inspected by the
supervisor. The ground will be level and
able to support the crane truck, while
offloading the container.
5.PPE:
* None
3.3 Incorrect set-up of the crane S Injuries 1.Elimination:
2.5
4
2
50
20
L
Fairbreeze truck Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* Only the truck driver or his assistant will
set-up the crane truck.
* Wheel Chocks will be placed behind the
crane truck wheels.
* The outriggers will be extended and
levelled.
* If the soil is wet, outrigger pads will be
used.
Only the truck driver / assistant will
manage the controls for the crane.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
4.1 Rigging the container Lifting equipment machinery S Serious Injuries 1.Elimination:
M
150
7.5
4
2
60
H
Fairbreeze failure Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* The crane truck will have valid
certificates for the following - Hook, and
Winch. The Calibration and Load test will be
available.
* The 4-legged chain will have a valid
quarterly compliance certificate.
* The operator / driver will conduct a pre
inspection on the crane truck. The
inspection will be recorded.
* Lifting tackle will be inspected by the
banksman before use. The inspection will
be recorded.
5.PPE:
* None
4.2 Rigging equipment not S 1.Elimination:
M
150
7.5
4
2
60
H
inspected by Tronox *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Rigging equipment will be inspected by a
Tronox designated person (William) before
allowed to be used to offload.
5.PPE:
* None
4.3 Incompetent person rigging S Serious Injuries 1.Elimination:
M
150
7.5
4
2
60
H
the load Property damage *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Only a person with a valid rigging and
slinging certificate will rig the load.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
2.5
4
2
50
20
L
containers lifting rungs *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Ladder will be used to access the
container lifting rugs.
5.PPE:
* None
4.5 Substandard ladder used to S Injuries 1.Elimination:
M
5
3
2
60
30
Fairbreeze access the container lifting *None
Expansion lugs 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* The ladder will be inspected before used.
If faulty do not use. The ladder will be the
correct height. Three rungs above the
contact point.
* Fall Protection Plan will be communicated
to the team before work commence.
5.PPE:
* None
4.6 Employee falling off the S Injuries 1.Elimination:
M
5
3
2
60
30
Fairbreeze ladder while *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* One person will stand at the bottom of the
ladder holding it when the person ascends
or descend on the ladder.
* The person will have three-point contact
when ascending and descending on the
ladder.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
M
120
4
1
10
40
H
Fairbreeze Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* The person rigging the load will ensure the
hook is secured and the safety latch is
close.
5.PPE:
* None
4.6 Drop zone not identified S Serious injuries 1.Elimination:
M
120
4
1
10
40
H
Fairbreeze Property damage *None
Expansion 2.Substitution:
project * None
3.Engineering:
* None
4.Administrative:
* The drop zone will be identified.
* Only the offloading team will be in the
area.
5.PPE:
* None
5.1 Lift and place the Guide ropes not used to S Serious injuries 1.Elimination:
M
150
7.5
4
1
30
H
container on the ground control the load Property damage *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* The load will be guised with guide ropes.
5.PPE:
* None
Probability/Likelihood
Residual Risk Rating
Consequence Level
Consequence Level
Exposure/Impact
Pure Risk Rating
Item Number
Classification
Risk Profile
Risk Profile
Activity /Task Impact or Risk
Section Control Measures
/Process/ Aspect or Hazard (Considering Who/ What can
/Area be harmed/ injured/ polluted)
Equipment
2.5
4
2
50
20
L
*None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Container will be levelled.
* Never place hands underneath the
container.
5.PPE:
* None
6.1 Offloading material Load more than 25kg S Back injuries 1.Elimination:
2.5
4
2
50
20
L
(Manual handling) *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Two or more employees to assist when a
load weight more than 25Kg.
5.PPE:
* None
6.2 Lifting a load above S Injuries 1.Elimination:
2.5
4
2
50
20
L
shoulder height *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Never lift a load above the shoulders.
5.PPE:
* None
6.3 Hands caught under the S Hand injuries 1.Elimination:
2.5
4
2
50
20
L
load *None
2.Substitution:
* None
3.Engineering:
* None
4.Administrative:
* Never place your hands under the load
when putting the load down.
5.PPE:
* Gloves
NB: PLEASE RETURN THE COMPLETED SHE TALK AND ATTENDANCE LIST TO