The document compares the requirements for Product Part Approval Process (PPAP) according to the AIAG standard versus Process and Product Audit (PPA) according to the VDA2 standard. It lists the 21 elements that must be addressed according to each standard, such as dimensional test reports, material certificates, control plans, measurement systems analysis, and confirmation of production capacity.
The document compares the requirements for Product Part Approval Process (PPAP) according to the AIAG standard versus Process and Product Audit (PPA) according to the VDA2 standard. It lists the 21 elements that must be addressed according to each standard, such as dimensional test reports, material certificates, control plans, measurement systems analysis, and confirmation of production capacity.
The document compares the requirements for Product Part Approval Process (PPAP) according to the AIAG standard versus Process and Product Audit (PPA) according to the VDA2 standard. It lists the 21 elements that must be addressed according to each standard, such as dimensional test reports, material certificates, control plans, measurement systems analysis, and confirmation of production capacity.
The document compares the requirements for Product Part Approval Process (PPAP) according to the AIAG standard versus Process and Product Audit (PPA) according to the VDA2 standard. It lists the 21 elements that must be addressed according to each standard, such as dimensional test reports, material certificates, control plans, measurement systems analysis, and confirmation of production capacity.
ref ref Cover sheet of PPA report 17-18 Part Submission Warrant (PSW) 1.1 Results of checks for product approval (eg geometries, 9- 10-13 Dimensional results (documents) - 1.2 functionality dimensional reports, material certificates, heat Material, heat treatments Certificates, 1.3 treatment certificates, test, weight etc) tests – Appearance approval report 2 Certified samples (quantity) 14 Certified samples Technical specifications (eg customer drawing, CAD data, 1-2-3 Drawing / table with reference to 3 specifications, technical changes not yet on the drawing) characteristics 4 DFMEA (for co-design suppliers) 4 Product FMEA 1 Drawing / table with reference to 5 Approval to drawing / development, by supplier characteristics 6 Data on Materials in IMDS system - Material data 7 Software test report (if applicable) - - 8 PFMEA 6 Process FMEA 9 Process flow chart (production and controls) 5 Process flow chart 10 Control Plan 7 Control Plan 11 Confirmation of process capability (preliminary) 11 Preliminary process capability Customer specific requirements 12 Evidence of conformity for Special characteristics (PQ08.02) 12-16 List of measurement devices and labs 13 List of gauges/measurement systems (if specific) docs 14 Measurement system analysis (MSA) 8 Measurement system analysis (MSA) 15 Tooling list (if specific) - - Confirmation of agreed productive capacity (feasibility - 16 - analysis) 17 Self-assessment through product & process matrix - - 2 Documents of technical changes not yet 18 Part history (list of product and process changes) on the drawing (if any) 19 Confirmation of packaging and storage suitability - - 20 Status of supply-chain PPAP/PPA - - 21 Coating systems approval (if applicable) - - 15 Reference master