RIYADH CITY DEVELOPMENT SOUTH PHASE - 5

PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 1 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

SS # RD
22kV TRANSFORMER
kVA
SITE TEST REPORT

SNAG

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 1 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 2 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

22kV DISTRIBUTION TRANSFORMER

SI.NO Checks to be Performed Remarks


1 Transformer Name Plate Details OK

2 Earth Resistance Measurement Test OK

3 Physical Site Inspection OK

4 Measurement of Winding Insulation Resistance OK

5 Measurement of Winding Resistance OK

6 Ratio Test OK

7 Measurement of The Excitation Current OK

8 Verification of Vector Group OK

9 Magnetic Core Balance Test OK

10 Short Circuit Test OK

11 Transformer Alarm & Trip Operation OK

12 Neutral CT Test ( For SBEF Relay ) OK

13 Remarks OK

14 Test Equipment Details OK

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 2 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 3 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

1.TRANSFORMER NAME PLATE DETAILS:


Manufacturer Name FEDERAL TRANSFORMER CO.L.L.C
Serial Number
Transformer Rating (KVA) kVA
HV 22000 V
Transformer Rated Voltage at No Load (V)
LV 415 V
HV
Transformer Rated Current (A)
LV
Frequency (Hz) 50 Hz
Type of Cooling ON AN
Transformer Type OIL
Winding Material ALUMINUM
Normal Tap / Number Of Phases 3 3
Temperature Rise oil / Winding (°C) 45 °C 55 °C
Vector Group Dyn11
Impedance Voltage at 75 °C (%)
Reference Standard IEC 60076
Year of Manufacture
Neutral Current Transformer Ratio - NCT

1.1 RATED VOLTAGE AND CURRENT FOR HV AND LV SIDE:


Tap Position Join Tap HV ( Volt ) LV ( Volt ) HV ( Amps ) LV ( Amps )
1 6-5 23100
2 5-7 22550 415 V
3 7-4 22000

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 3 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 4 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

4 4–8 21450
5 8-3 20900

2. EARTH RESISTANCE MEASUREMENT TEST:


Sl. No. Earth Pit Destination Earth Resistance ( Ω ) Remarks
1 Transformer Body Ω
2 Transformer Neutral Ω
Acceptance Criteria: Earth resistance value should be less than 1Ω.
3. PHYSICAL SITE INSPECTION:
Sl. No. Description Remarks
1 Installation according to the drawing
2 No oil leakage & Oil level Position Correct
3 All drain valves are fully closed
4 No visible cracks or breaks to bushing
5 All bushing connections are fully tightened
6 Main tank grounding correct
7 Neutral Grounding Correct (Fixed, Tightened & Insulated)
8 Pressure relief valve are correctly installed
9 Earthing of cable boxes and other removable parts

4. MEASUREMENT OF WINDING INSULATION RESISTANCE:


Test Measured Resistance in GΩ PI Value
SI. No. Connection Voltage in Remarks
15 Sec 60 Sec (60Sec/15Sec)
Volts
1 HV- (LV+E) 5000

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 4 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 5 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

2 HV- LV 2500
3 LV- (HV+E) 1000
Acceptance Criteria: Measured ( Absorption ratio ) Value should be >1.2&<3.0
5. MEASUREMENT OF WINDING RESISTANCE:
Ambient Temp ( Amb ): 34 °C Oil Temperature ( T ): 32 °C
Mean Mean
Tap Measured Resistance
Phase Measured Resistance Remarks
Position Value At 75 °C
Value At 75 °C
1R-1Y
1 ( HV ) 1Y-1B
1B-1R
1R-1Y
1Y-1B
2 ( HV )
1B-1R
1R-1Y
1Y-1B
3 ( HV )
1B-1R
1R-1Y
1Y-1B
4 ( HV )
1B-1R
1R-1Y
1Y-1B
5 ( HV )
1B-1R
Mean Mean
Measured Resistance
Phase Measured Resistance Remarks
Value At 75 °C
Value At 75 °C
LV 2r-2y
2y-2b
2b-2r
2r-2n

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 5 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 6 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

2y-2n
2b-2n
Winding Calculation at 75º C :-
R75° C= Ramb x (225 + t 75)/(225+tamb)

6. RATIO TEST:
6.1 MEASUREMENT OF WINDING RATIO BY VOLTMETER METHOD.
Apply 3 Phase Voltage on HV winding and measure HV & LV Voltages on each Phase (by
using voltmeters). The measurements are repeated for all taps.

Tap HV Applied volts ( V ) LV Measured volts ( V )


Position 1R-1Y 1Y-1B 1B-1R 2r-2y 2y-2b 2b-2r 2r-2n 2y-2n 2b-2n
1
2
3
4
5

Tap Measured Ratio Actual


Average % Error
Position 1R-1Y / 2r-2n 1Y-1B / 2y-2n 1B-1R / 2b-2n Ratio

1
2
3

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 6 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 7 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

4
5

Acceptance Criteria: % Error is less than 0.5%


6.2 MEASUREMENT OF WINDING RATIO BY USING TRANSFORMER RATIO METER
(TTR)

Tap TURN RATIO CURRENT ( µA ) % ERROR


No
A B C A B C A B C
1

5
Acceptance Criteria: %Error is less than 0.5%

7. MEASUREMENT OF THE EXCITATION CURRENT ( 3 Phase AC )

Applied Voltage ( V ) Measured Current ( mA )


Tap
Remarks
Position
VRY VYB VBR IR IY IB

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 7 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 8 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

2
3
4
5

8. VERIFICATION OF VECTOR GROUP:


LV Side Measured Voltage between
HV Side Applied Voltage (V)
Voltage (V) HV and LV terminals
Terminals Volts Terminals Volts Terminals Volts
1R-1Y 2r-2y 1Y-2y
1Y-1B 2y-2b 1Y-2b
1B-1R 2b-2r 1B-2y
2r-2n 1B-2b
2y-2n 1R-2n
2b-2n 1Y-2n
1R 2r

2n 2y
2b

1B 1Y

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 8 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 9 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

Vector Group Equations Conditions verified Remarks

1R1Y = 1R2n+1Y2n OK
Dyn11 1Y2b = 1Y2y OK
1B2b < 1B2y OK

9. MAGNETIC CORE BALANCE TEST:

Voltage Applied on Voltage Measured on Voltage Measured on


HV side ( V ) HV Side ( V ) LV Side ( V )
Remarks

R Y B 1R-1Y 1Y-1B 1B-1R 2r-2n 2y-2n 2b-2n

YES YES NO

NO YES YES

YES NO YES
Acceptance Criteria: Voltage applied = SUM of voltage measured on HV side.

10. SHORT CIRCUIT TEST:(2r,2y,2b,2n Shorted)

Applied voltage at HV
Measured HV current (A) Measured
terminals in volts % of
TAP LV current
impedance
1R-1Y 1Y-1B 1B-1R 1R 1Y 1B (A)

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 9 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 10 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

Rated HV Voltage = 22000 V


Rated HV Current = A
% Impedance = Applied Voltage x Rated HV Current x 100
Rated HV Voltage x Measured HV Current

11. TRANSFORMER ALARM & TRIP OPERATION:

a) TEMPERATURE INDICATOR:
DESCRIPTION SETTINGS REMARKS
Alarm 95 °C
Trip 105 °C

b) FUNCTIONAL CHECKS OF PROTECTIVE DEVICE:


SR.NO DESCRIPTION REMARKS
1 Oil Temperature Alarm
1 Oil Temperature Trip
2 Pressure Relief Device Trip
3 Vertical Oil Level Trip

c) FUNCTION CHECK OF PROTECTIVE DEVICE


Transformer MB
Sr . No Name of Device Remarks
Contact.

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 10 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 11 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

1 Pressure Relief Device Trip 1,2 - ( NO )


2 Pressure Relief Device Trip 3,4 - ( NO )
3 Vertical Oil Level Switch ( Max ) 5,6 - ( NC )
4 Vertical Oil Level Switch ( Min ) 6,7 - ( NO )
5 Oil Temperature Indicator ( ALRAM ) 9,10 - ( NO )
6 Oil Temperature Indicator ( TRIP ) 11,12 - ( NO )
7 Neutral Current Transformer 13,14

12. NEUTRAL CT TEST: ( For SBEF Protection Relay )


12.1 NAME PLATE DETAILS:

Make PRECISE ELECTRICAL Ratio 2000 / 1A


Serial Number Burden / Class 10VA / 5P20

12.2 Visual Checks:


1. CT Correctly Connected as per drawing :
2. Any Mechanical Damage :
3. All Terminals tightly secured :
4. Grounding & Shorting Connections are Secure :

12.3 MEASUREMENT OF INSULATION RESISTANCE (IR):

S. No. Connection Test Voltage ( VDC) Measured Resistance Value Remarks


1 Sec-Earth 500 V / 60 Sec

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 11 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 12 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

1. CT Polarity Test :
2. Winding Resistance Test:
3. CT Saturation Test:
4. Ratio Test:
( The above test results are available in the attached Printout Sheet )
Note: CT test is preferable to be performed using CT Analyzer Test Kit.

13. REMARKS:

14. TEST EQUIPMENT DETAILS:

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 12 of 13
RIYADH CITY DEVELOPMENT SOUTH PHASE - 5
PROJECT
INFRASTRUCTURE AND STREETSCAPE
EQUIPMENT 22kV TRANSFORMER
CLIENT ADDC DATE
CLIENT ALDAR PROJECTS SUB STATION RD
PMC KBR CONTRACTOR SAIF BIN DARWISH
CONSULTANT ARCADIS PAGE Page 13 of 13
TESTING
FALCON MIDDLE EAST CONTRACTING, & GENERAL MAINTENANCE
COMPANY

SITE ACCEPTANCE TEST REPORT FOR 22kV TRANSFORMER

CALIBRATION
S.NO INSTRUMENT NAME MAKE / MODEL SERIAL NO
DUE DATE
1 Digital Multimeter Fluke/87V 53550177 19.06.2024
2 Leakage Clamp Meter Fluke/369FC 43860064WS 01.08.2024
3 Clamp Meter Fluke/376FC 51700288MV 18.06.2024
4 IR Tester Megger/MIT520-2 1000-374/100610-2448 06.09.2024
5 Digital Earth Tester Hioki 22-CZ4284-01 11.09.2024
6 CT Analyzer Omicron/CT Analyzer KM285H 27.04.2024
7 Winding Resistance Kit DV Power/TWA25A 21TW551 20.06.2024
8 Transformer Ratio Meter DV Power/TRT63A 21X230 20.06.2024

TESTED BY CONTRACTOR CONSULTANT CLIENT


COMPANY FALCON SAIF BIN DARWISH ARCADIS ADDC
NAME

SIGNATURE

DATE

Page 13 of 13