This document outlines the construction of a 29.92 km, 4-lane highway in Telangana, India. Key aspects of the project include a flexible bituminous pavement using 64,000 cubic meters of asphalt material. Earthwork will involve excavating and filling 35,00,000 cubic meters of soil. Major bridges and viaducts will total 0.761 km in length and include 114 piles. Retaining walls will cover an area of 2,02,241 square meters. Two multi-joint box steel girder structures, each with a 90m span, will also be built.
A Short Guide to the Types and Details of Constructing a Suspension Bridge - Including Various Arrangements of Suspension Spans, Methods of Vertical Stiffening and Wire Cables Versus Eyebar Chains
This document outlines the construction of a 29.92 km, 4-lane highway in Telangana, India. Key aspects of the project include a flexible bituminous pavement using 64,000 cubic meters of asphalt material. Earthwork will involve excavating and filling 35,00,000 cubic meters of soil. Major bridges and viaducts will total 0.761 km in length and include 114 piles. Retaining walls will cover an area of 2,02,241 square meters. Two multi-joint box steel girder structures, each with a 90m span, will also be built.
This document outlines the construction of a 29.92 km, 4-lane highway in Telangana, India. Key aspects of the project include a flexible bituminous pavement using 64,000 cubic meters of asphalt material. Earthwork will involve excavating and filling 35,00,000 cubic meters of soil. Major bridges and viaducts will total 0.761 km in length and include 114 piles. Retaining walls will cover an area of 2,02,241 square meters. Two multi-joint box steel girder structures, each with a 90m span, will also be built.
This document outlines the construction of a 29.92 km, 4-lane highway in Telangana, India. Key aspects of the project include a flexible bituminous pavement using 64,000 cubic meters of asphalt material. Earthwork will involve excavating and filling 35,00,000 cubic meters of soil. Major bridges and viaducts will total 0.761 km in length and include 114 piles. Retaining walls will cover an area of 2,02,241 square meters. Two multi-joint box steel girder structures, each with a 90m span, will also be built.
Project: Construction of 4-Lane Access Controlled Greenfield Highway section on NH-163G
(Khammam–Vijayawada) from V. Venkatayapalem village at Design Ch. 220.480 Km to
Brahmanapalli(K) village at Design Ch. 250.400 Km (total length 29.920 Km) under other Economic Corridor (NH(O)) programme on Hybrid Annuity Mode in the State of Telangana (Package-I)
Type of Pavement: Flexible (Bituminous)
Total length of CW: 29.92 Kms Total Asphalt Material: 64,000 Cum Earthwork (excavation & filling qty): 35,00,000 Cum Length of Major bridges/ viaducts: 0.761 Kms Piling (if any) dia/number/ Running Mtr: 114 Nos. RE wall/ Retaining wall: 2,02,241 Sqm Any other critical/ major feature: 2 MJB Steel Girders structure (90m span each). Major Challenges:
A Short Guide to the Types and Details of Constructing a Suspension Bridge - Including Various Arrangements of Suspension Spans, Methods of Vertical Stiffening and Wire Cables Versus Eyebar Chains