Cayong, Harod

BSIT-Electricity

My Narrative Report During Internship

January 23, 2023

Applying for OJT at Kuatako Construction and General Contractor. They let us survey and
analyze the plan of the site. It is a two story and a basement.

January 24, 2023 - February 25, 2023

First day of our OJT and we choose the ground floor/first floor to start.

First we do some grinding and breaking some part of the wall for the installation of pvc, utility
boxes for switches and outlets. And after that we install the wire and junction boxes and before
splicing it we check the wires using tester. We also do it at second floor and basement.

February 27, 2023 - March 8, 2023

We decide agin to grind and break a part of a wall for the installation of panel board in ground
floor, second floor and basement. After that we install also the circuit breaker and connect the
wires.

March 9, 2023

We do check all the wires, connection of the wires just like lights to break and outlets to
breaker. And after the inspection of the wire we connect/splice the 3 main breaker using a 8.0
mm wire and after that we connect it to the sub-meter.

March 10, 2023 - March 25, 2023

The supervisor told us to install all the switches, outlets, bulb and chandelier. After the
installation we do some testing of switches, outlets and bilbs to determine if there is a
defective, no connection, striped, and others.

March 27, 2023 - March 30, 2023

We do some changes of outlets or additional light and switch.

Thi is what we do during our OJT days at Kuatako Construction and General Contractor.