Project Gantt Charts (2) Body
Project Gantt Charts (2) Body
Task Task description Assigned % April May June July Aug Sep Oct Nov Dec Jan Feb Mar
# for done 2022 2022 2022 2022 2022 2022 2022 2022 2022 2023 2023 2023
Curriculum/Syllabus Tasks
1 Review of FS UK Rules
2 Extracting FS EV Rules
3 Review of AHEP
accreditation Criteria and
LO’s
4 Converting FS EV Rules into
LO’s
5 Allocating the HVT module
relevant to each LO/rule
6 Develop LO/module
map/matrix
Task Task description Assigned % done July 2022 Aug 2022 Sep 2022
# for
Week Week Week Week Week Week Week Week Week Week Week Week
1 2 3 4 1 2 3 4 1 2 3 4
-- Curriculum Tasks
1
2
3
4
5
6
7
8
9
10
-- FS Team Tasks
4 4.1 collect rules of
general safety at
the design stage
4.1.1 collect the The 100 %
safety rules for entire Complete
the battery group
4.1.2 collect the
safety rules for
the motor
4.1.3 collect the The 100 %
safety rules for entire Complete
chassis group
4.1.4 collect the
safety rules for
brake
4.1.5 collect the
safety rules for
steering
4.1.6 collect the
safety rules for
wheels and tires
4.1.7 collect the
safety rules for
suspension
4.1.8 collect the The 100 %
safety rules for entire Complete
frame and body group
4.1.9 collect the The 100 %
safety rules for entire Complete
seat group
4.2.1 Collect of The 100 %
rules for body entire Complete
design group
4.3.1 Collect of The 100 %
rules for entire Complete
ergonomic group
5 5.1 The 100 %
Developing Gantt entire Complete
chart for the team group
and group tasks
annually,quarterly
and monthly
6 6.1 The 100 %
Review of the entire Complete
available group
literature in the
FS competition
modes and
required
documentations
7 7.1 Demo kit
(searching for
materials,cost
and design).
7.2
Manufacturing
the Demo kit
8 8.1 create a social 100 %
media page Complete
9 9.1 Define design
rules and body
dimension
9.2 A schematic
sketch showing
the details of the
body design
9.3 body design
simulation on
solid work
9.4 simulation
test work
9.5 ،Streamlined
body design to
reduce air
resistance
9.6 A schematic
showing the
details of the
body design for
air resistance
9.7 simulation
test work
9.8 Choosing the
right seat for the
specified
dimensions
9.9 sketch design
for the seat
9.10 simulation
work for seat
9.11 Design
processing