Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Pulgaon Nalla Bank Protection Near Janjgiri

"A" Preliminary
Details of Quantity
S. SOR Particulars of items Unit Dimensions Quantity
No item No. L B D
No.
01 02 03 04 05 06 07 08 09
1 204 (i) (a) Chain and compass survey (i) Head
Works

Base Line m 1 400.00 400.00

Cross Section (Above 15 m) m 45.00 410.00 18450.00

Total 18850.00
Km 18.85
2 206 (a) Levelling (b) Head Works (iii) more than 10
but up to 15 m interal
(iv) Above 15 m interal km As per above item 18.85 km
Canal

3 207 (b) Double levelling for transfer of bench


marks-
(b) above 15 m interval
AS per item no 1 m 1 18.85 - - 18.85
Total 18.85
km 18.85 km
4 210 Benchmark as per type design 6 of Water
Resources Department.
(a) Bench mark stone of size 15x15x75 cm Each 2 2
of 1:2:4 RCC including cost of steel
(b) Erection and fixing (embedding 45 cm Each 2 2
depth of stone with 15cm concrete all
around and in bottom) -
(ii) Labour for excavation (any type of soil), Each 2 2
handling and fixing of B.M. stone including
mixing, laying & curing of concrete
(iii) cost of water for mixing and curing of Each 2 2
concrete

Sub Engineer/Assistant Engineer Sub Divisional Officer


Tandula W.R.Sub Division
No 5 Durg

729171255.xlsx U-2|A-Pre|Estimate G 1 :: 3
Pulgaon Nalla Bank Protection Near Janjgiri
"A" Preliminary
ABSTRACT FOR COST
R = 366.92
S. SOR Particulars Qty Rate Unit Amount
No item
No.
01 02 03 04 05 06 07
1 204 (i) (a) Chain and compass 18.85 2201.52 Km 41,499.00
survey (i) Head Works
(ii)
2 206 (a) Levelling (b) Head Works
(iii) more than 10 but up to
15 m interal

(iv) Above 15 m interal 18.85 1467.68 km 27,666.00


3 207 (b) Double levelling for 18.85 4403.04 km 82,997.00
transfer of bench marks-
(b) above 15 m interval
4 210 Benchmark as per type
design 6 of Water
Resources Department.
(a) Bench mark stone of 2.00 119.00 Each 238.00
size 15x15x75 cm of 1:2:4
RCC including cost of steel
(b) Erection and fixing 2.00 236.00 Each 472.00
(embedding 45 cm depth of
stone with 15cm concrete
all around and in bottom) -

(ii) Labour for excavation 2.00 733.84 Each 1,468.00


(any type of soil), handling
and fixing of B.M. stone
including mixing, laying &
curing of concrete

729171255.xlsx A-Pre|ABS G 2 :: 3
S. SOR Particulars Qty Rate Unit Amount
No item
No.
(iii) cost of water for 2.00 366.92 Each 734.00
mixing and curing of
concrete
Total 155,074.00
Add 1% for contingency 1,551.00
Grand Total 156,625.00
Say Rs. 1.57 Lakh

Sub Engineer Sub Divisional Officer


Tandula W R Sub Division
No 5 Durg

729171255.xlsx A-Pre|ABS G 3 :: 3