GOVERNMENT OF CHHATTISGARH

WATER RESOURCES DEPARTMENT

ADMISTRATIVE APPROVAL FOR


BANK PROTECTION WORK ON BOTH BANK OF PULGAON NALLA
NEAR JANJGIRI WITH PITCHING & DESILTING WOKS
IN DISTT DURG

BLOCK DURG

TAHSIL - DURG

DISTRICT - DURG

ESTIMATED COST - ₹ 307.27 LAKH

CHIEF ENGINEER
MAHANADI GODAWARI BASIN,
WATER RESOURCES DEPTT.
RAIPUR (C.G.)
INDEX

S.No. Particulars Page No.


1 Report
2 Leading Details
3 Index Map
4 Performa to be attached to the Minor
Irrigation Scheme
5 Check Statement for feasibility of project
6 Check list in accordance with A.A. for
irrigation Scheme.
7 iz”kkldh; Lohd`fr ds
fy;sizLrqrizkDdyuesalayXudjusgsrqi
zi=
8 Proforma to accompany project estimate
costing more than 5 lakh
9 ty lalk/kufoHkkx dh ifj;kstukvksa ds
ijh{k.kgsrqtkap fcUnq¼foRr
ea=ky; }kjk fu/kkZfjr½
10 dk;Z dk losZ{k.k
11 la{ksfidk
12 Ykkxresao`f) ckcr~ izek.k&i=
13 futhlaifRrlaca/khizek.ki=
14 Certificate
15 Cost benefit ratio
16 General Abstract
17 Estimate of "A" Preliminary
18 Estimate of "B" Land
19 Estimate of "C" Mesonry
20 Estimate of "K" Building
21 Estimate of "L" Earth work
22 Estimate of "M" Plantation
23 Estimate of "O" Miscellaneous
24 P- Maimtenance
25 Lead Chart
26 DRAWINGS
LEADING DETAILS
1. Name of Work : BANK PROTECTION WORK ON BOTH
BANK OF PULGAON NALLA NEAR
JANJGIRI WITH PITCHING &
DESILTING WOKS
IN DISTT DURG

2. Village : Janjgiri

3. Block : Durg

4. District : Durg

5. M.L.A. Constituency : Hon'ble Shri Tamradhwaj Sahu jee

6. Vidhan Sabha Constituency : Durg Gramin

7. Location : Latitude 20o 5' 57"


Longitude : 81o19' 34"
Toposheet No. 64/ G/8,
8. Length of Protection : 330.00 m ( On both sides)

9. Average Slant Length : 8.00 m

10. Type of Protection : CC Block 300 mm thick over


moorum
11. HFL : 104.45 m

12. Nalla bed level : 100.20 m.

13. Catchment Area : 360.00 sqKm

14. RL of Toe Wall : 100.75 m

15. TBL : 104.95

16. Size of Beam : 300 x 600 mm

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg
के पाटन दुर्ग प्रखंड में रेंगाकठे रा स्टाप डैम का
निर्माण कार्य

जिला दुर्ग के पाटन विधानसभा क्षेत्र में तेलीगुंडारा में गहनीकरण


,सौंदर्यीकरण एवं नवीनीकरण का कार्य

उपअभियंता

सौंदर्यीकरण नवीनीकरण गहनीकरण


Remodelling and lining of Minors of
SondDistributory under Tandula Project
SALIENT FEATURES
1. Name of Work : Remodelling and lining of Minors
of SondDistributory under Tandula
Project.
2. District : Bemetra
3. Tahsil & Block : Berla
4. Location : Latitude 21o 21'45"
Longitude :81o 27' 00"
5. Name of : Berla&Hon'ble Shri Ashish
Constituency&M.L.A. Chhabada

6. Catchment Ara : N.A.


7. Mean Annual rainfall :
8. Mean Mansoon yield : N.A.
9. Binnies percentage : 39.90%
10. Gross storage : -
11. Dead storage capacity : -
12. Live storage capacity : -
13. Anicut H.F.L. : N.A.
14. Anicut L.S.L. : N.A.
15. Anicut F.S.L. : N.A.
16. Ground Level (Left Flank) : N.A.
17. Water spread area : N.A.
18. Length of Anicut : N.A.
19. Top width of Anicut : N.A.
20. Discharge Maximum : N.A.
21. Bed grade : N.A.
22. Velocity : N.A.
23. No. of Gates : N.A.
24. Gross Area under command : 3089.54Hact
25. Area to be irrigated : 2710.12Hact

Sub Divisional Officer Executive Engineer


TandulaWater Resources Sub Division Tandula Water Resources Division
No. 4Durg (C.G.) Durg (C.G.)
Proforma to be attached to the Minor Irrigation
Scheme Costing Rs. 25 Lacs and Less for obtain
Administrative Approval of State Government
Reference: T.C. No. 70-W-(M) 68, Bhopal, Dated 17.07.1968

1. Name of the Scheme : BANK PROTECTION WORK ON BOTH


BANK OF PULGAON NALLA NEAR
JANJGIRI WITH PITCHING & DESILTING
WOKS IN DISTT DURG

2. (a) Name of Officers who : Shri Suresh Pandey


investigated the scheme , Executive Engineer

(b) Name of the officers who : Shri Suresh Pandey


inspected the scheme Executive Engineer
Shri , S.K.Dewangan SDO

3. Estimate Cost of the scheme : Rs 307.27Lakhs


(a) Cost per Hact. : Rs - lakh
(b) Whether the above cost per hact. N.R.
is reasonable? Scheme is :
recommended
4. (a) Village served and the prevalent : N.R.
crop parrem according to the
statement of Agriculture
statistic.
(b) Crop Pattern (With manes and : N.R.
areas of crop proposed.
(c) Letter from the agriculture deptt. : N.R.
and collector regarding the
reasonable of the crop pattern
and willingness to pay water
rates attached or not.

5. (a) Does the scheme find place in the : New Scheme


plan programme and is within
the plan programme ceiling
indicated by Chief Engineer for
new minor irrigation
Programme.
(b) How otherwise the scheme is :
proposed to be financed.
6. It is an Ex-Mulguzarri thank or other : No
revenue tank? Have the details
required vide C.E.’s No. 107-K-1/C
of 64 dated 03.01.1976 regarding the
ownership etc. obtained.
7. (a) Is this a pich-up weir nala :
diversion or regulator scheme
have the discharge observation
been carried out and for what
duration has the statement of
discharge been enclosed ?
(b) If nof has the Superintending :
Engineer, Satisfied himself
about the adequacy of discharge
assumed ?
8. Has the adequate survey of canal :
been carried out and there is not
thunderous later on in the utilizations
of irrigation benefits.

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg
iz”kkldh; Lohd`fr ds fy;s izLrqr izkDdyu esa layXu
djus gsrq izi=
1- ;kstuk dk uke %दुर्ग जिला के पुलगांव नाला पर
जंजगिरी के पास दोन ksa rV
पर पिचिंग के साथ डिसिल्टिंग
का कार्य

2- e/;e@y?kq ;kstuk %y?kq ;kstuk


3- Cykd@rglhy@ftyk %nqxZ
4- fo/kkulHkk {ks= dk uke ,oa ua- %nqxZ
5- fo/kk;d dk uke %ekuuh; Jh ताम्रध्वज साहू जी

6- izLrkfor in %y?kq ;kstuk


vkFkkZr ;kstuk@vkfnoklh
mi;kstuk@Mh-ih- ,-ih-
7- ;kstuk dh izkDdfyr ykxr %:- 307 27 yk[k
8- izLrkfor flapkbZ %vko';d ugha
9- izfr gsDVs;j ykxr %
10- ch-lh- ;kstuk C;kt ds nj ij %vko';d ugha
¼e/;e ;kstuk gsrq½
11- ;fn O;iorZu ;kstuk gS rks ty L=ksr %vko';d ugha
ds cgko dk fooj.k
12- ty nj nsus laca/kh ftyk/;{k dk izek.k %vko';d ugha
i=
13- d`f"k foHkkx dk Øki iSVuZ laca/kh %vko';d ugha
vfHker
14- ftyk ;kstuk e.My@ftyk ijke”kZ lfefr %vko';d ugha
dh lgefr
15- Cykd ,oa rglhy dk leLr L=ksrksa ls %vko”;d ugha
flapkbZ izfr”kr
16- ykHkkfUor xzkeksa dh la[;k ,oa uke %1 xzke जंजगिरी
4 ctV esa izko/kku dh fLFkfr %:i;s 900 00 yk[k lu~ 2023 24
ctV cqd ljy dz- 13 ist dz- वर्ष
20 00 yk[k
729171264.docx r mishra
5 Mwc {ks= esa jdcs dk fooj.k ,oa %ykxw ugha
flapkbZ ds HkkSfrd {ks= ij Mwc esa
vk;h dkLr ;ksX; Hkwfe dk izfr”kr]
Mwc esa vkus okys xzke] ?kj] dqW,]
Qynkj o`{k vkfn dk fooj.k
6 ;fn dk;Z vfnoklh mi;kstuk ds {ks= %ugha
esa izLrkfor gks
v- vkfnoklh dk izfr”kr] HkwfeLokfeRo %&rnSo&
dk izfr”kr@ftyk/;{k dk izek.ki=
c- lacaf/kr ;kstuk vf/kdkjh@izkstsDV %&rnSo&
vf/kdkjh dk vuqeksnu
7 ;kstuk fdrus o"kksZ esa iw.kZ djuk %iz'kkldh; Lohd`fr ds 1 o"kZ
izLrkfor gSA cknA
8 izLrkfor ;kstuk ds cuus ls Cykd dk %vko”;d ugha
flapkbZ izfr”kr D;k gksxkA
9 izkDdyu fdl lh-,l-vkj- ij cuk;k x;k %NRrhlx<+ “kklu] ty lalk/ku
foHkkx }kjk fu/kkZfjr ,l-vks-
vkj- 01-08-2010 iqujhf{kr nj
fnukad 22-08-2022 ds vuqlkj

10 Åaps nj ds fy;s izkDdyu esa izko/kku %izko/kku ugha fd;k x;k gSA
%

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku milaHkkx dz- rkanqyk ty lalk/ku
05 laHkkx
nqxZ ¼N-x-½
ft- nqxZ ¼N-x-½

729171264.docx r mishra
ENCLOSURE No. I PRESCRIBED VIDE T.C. No. 25/W (N) 61 DATED: 08.02.1982
CHECK STATEMENT FOR GENERAL FEASIBILITY OF PROJECT
Remarks By
SNO. Items
SDO EE
I. Has the cost per acre been checked and found NA NA
reasonable?
II. Has the side been found suitable with regards to -
(a) Stop Dam site NA NA
(b) Waste weir site Question not Not Required
arise
(c) Head reach of channel Question not Not Required
arise
(d) Nalla closure point of view Question not Not Required
arise
III. Whether the construction material are available Yes Yes
in the required quantity &within economical lead
?
IV. Is the percentage of submergence of cultivated Question does Water level
land to the area proposed for irrigation within not aries remain within
10% the river bank
V. Whether
(i) The bank percentage adopted is consistent Question does Not Applicable
with the crop required & the rainfall of the not arise
region.
(ii) The storaged proposed is adequate for the Not Required Not Required
needs and future expansion.
vi. Whether under command-
(i) Cultivated land is shown with crop proposed Question does Not Applicable
for irrigation and is the Other 60% of proposed not arise
irrigation.
(ii) The soil is fit for irrigation from the point of Question does Not Applicable
saline and othe consideration. not arise

vii. Has certificate from the revenue authority in


respect of-
(i) Need of irrigation Question does
not arise
(ii) Approval of Distt. - advisory committee Yes Yes
(iii) Reason for new minor works Proposed by
C.G. Govt.
viii. Whether the site inspection of Executive Engineer Yes Done
enclosed (all cases) (Superintending Engineer above
5.0 Lakh)

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

729171264.docx r mishra
CHECK LIST IN ACCORDANCE WITH ADMINISTRATIVE APPROVAL
FOR IRRIGATION SCHEME
1 Name of Scheme : BANK PROTECTION WORK ON BOTH
BANK OF PULGAON NALLA NEAR
JANJGIRI WITH PITCHING & DESILTING
WOKS
IN DISTT DURG

2 Tahasil : Durg
3 District : Durg
4 Cost of Estimate Rs 307.27Lakhs
a) Unit -I 'Head work' : Rs. 307.27 Lakh
b) Unit-II 'Canal work' : nil
5 Area proposed for irrigation : -Hactare
6 Cost per Hact. : Rs -Lakh
7 Financial Return :
8 Benefits Cost Ratio : .
9 Whether the cost per acre is within the :
permissible limit ? (Indicate the permissible
limit)
10 If not indicate the reason for proposing the : Budget provision for the year
scheme 2022-23 Rs.900.00Lakhs
S.No.13 Page No ,This year
20.00 Lakh
11 Is there any budget provision and if so, how : Yes
much and for what year?
12 Whether the scheme has been technically : Not Necessary
clearance by the planning commission?
13 Whether the scheme has been included in the : No
five-year plan and with what provision?
14 The period required for preparing detailed : Within 2 months after accorded
estimate and giving technical sanction? AA.
15 The period for which the scheme is : 12 Months after starting the
programmed to be completed project.
16 Whether Collector's Certificate regarding the : N.R.
willingness of cultivators to pay water rates
supplied in the prescribe proforma.
17 Whether the cultivated area in the : N.R.
submergence is within the limit.

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

729171264.docx r mishra
729171264.docx r mishra
PART-II
"HEAD WORK"
1 HYDROLOGY:-
a) Whether Catchment area rainfall and run off and : Not Required
percentage of tank have been worked out and
scrutinized.
b) Whether in the working table losses, at 1,2& 3 for : Not Required
Kharif, Rabi & Summer Season allowed and whether
replenishment during kharif at 20% of surplus water
limited to 1/3rd irrigation requirement for Kharif only
is considered and failures above 10% have been
limited to 25% of years.
2 ANICUT SECTIONS:-
a) Whether it is based on soil analysis or is per type : Not Required
design borrow of investigation whether quality and
involved lead survey have been done and certified by
S.D.O. and E.E. in charge.
3 CUT OFF TRENCH:-
Whether investigation including bore holes data of trial : Not Required
pits to show depth of impervious soil or rock have been
done and the trench designed accordingly if imprevious
soil is not avalaible in cut off trench, the clay blanket
proposed.
4 SLUICE:-
a) Whether investigation with trail pit and load bearing : Not Required
data of the foundation are given.
b) Whether design is supported by calculation. : Yes
5 WASTE WEIR:-
a)Whether investigation including including trial pit and : N.A.
bore holes to determine hard rock extended to
reasonable depth in hard rock.
b) Whether design calculation for length attached. : N.A.
6 SPILL CHANNEL:-
a) Whether investigation with trail pit data show : Not Required
avalaibility of hard rock and whether they extend to
river bed level.
b) Whether design calculation along with grid plan and 'L' : Not Required
section shwoing location of fall is attached.
7 SUBMERGENCE AREA:-
Whether survey for submergence are i.e. property and : Not Required
land survey been done and rates adopted certified by
revenue authorization Govt. of C.G.

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

729171264.docx r mishra
PART-III
"CANAL & COMMAND AREA"
1 What is the commanded cultivable and irrigated :- NA
area ?
a) Command Area :- As above
b) Culturable Area :- As above
c) Kharif :- - Hactare
d) Ravi :- -
e) Proposed Irrigated Area :- - Hactare
2 Have agriculture statistics village wise been :- Yes
enclose ?
3 Have soil survey been done ? :- Yes
4 Is crop, pattern, existing and proposed given ? :- Yes
5 Whether reason for new crop pattern have been :- Yes
given.
6 Whether water depths are4 proposed as per soil :- As Above
surveys of Agriculture offices Opinion?
7 Has the yearly Development irrigation be :- As above
considered?
8 Whether cultivators have been consulted :- Yes
regarding water rates and betterment levy ?
9 Whether opining of revenue and agriculture :- Yes
authorised have been obtained?
10 Whether canal bed had discharge have been :-
worked out monthly where mixed cropped
pattern proposed
a) what duty are adopted :- As above
b) Have cut off Statement Been Enclosed? As above
11 Have survey been done for :- Yes
a) main Canal and Distributary
12 Are the estimate for main canal and distributary :- Yes
based on cost acre basis of cusesmiles ?

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

729171264.docx r mishra
PART - IV

1 What rates are adopted for earth work? Are : E/W rate adopted as per S.O.R.
they workable? in forced from 01.08.2010 and
amended on dated 22.08.2022
2 What is the cost per ha. and financial return :
at the end of 1years after completion of the
Project?

3 If Project is unproductive of comparatively : Not required


costly special ground for undertaking it.
4 It the Project is undeasable whether data of : Not required
inspection by SE with recommendations for
proposing it from the plan have been
supplies.

5 If cost is more than Rs. 10.00 lakhs and less : Enclosed


than Rs. 1.00 Crores whether proforma in
triplicate with index plan is enclosed for
submission to C.W. & P.C.
6 Whether previous technical objections have : Yes
been replied.
7 Whether points conversed in the inspection : Not required
note of SE and CE have been considered
and complied.

8 Whether the case is fit for-


a) Acceptance I Technical Clearance by : Not required
CWC and Planning Commission.
b) A.A. of Government. : Awaited
c) Technical Sanction by Government/ : To be taken after A.A.
Chief Engineer.

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

729171264.docx r mishra
CHECK STATEMENT FOR MINOR IRRIGATION SCHEMES TO
ACCOMPANY T.C. NO. 70
1 Name of The Scheme :- .
BANK PROTECTION WORK ON
BOTH BANK OF PULGAON
NALLA NEAR JANJGIRI WITH
PITCHING & DESILTING WOKS
IN DISTT DURG

2 Location of Near Village :- Hotraka


3 Constituency No. I Name :-
4 a) Name of The M.P. :- Hon Shri Vijay Baghel jee
b) Name of The M.L.A. :- Hon'ble Shri Tamradhwaj
Sahujee
5 a) Name of BLOCK :- Durg
b) Name of TAHSIL :- Durg
c) Name of DISTRICT :- Durg
6 a) Tribal Population Non-Tribal Area :- Nil
b) Area Under Tribal Percentage of Non- :- Nil
Tribal & Certificate Attached
7 Cost :-
8 Area proposed for Irrigation :- - Hactare
9 Cost per Hectare :-
10 Crop Pattern :-
a) Kharif (Paddy) :- - Hactare
b) Rabi -
c) Total Design Area of Irrigation - Hactare
(Surface)
11 Water Planning :-
a) Catchment Area NA
b) Rainfall 75% Dependable Annual 1107.44 mm
c) 75% Dependable Mansoon Yield 830.58 mm
d) Water Use at Field at Canal Head Gross Nil

12 Storage and Utilization of LIVE :- Storage Utilization


a) Required Not applicable
b) Proposed -
c) Reasons for Not Providing the Required Not applicable
Capacity
13 Storage anci Utilization of DEAD :-
a) Required Not Required
b) Provided Not Required
c) Reasons for Not Providing The Required Not Required
Capacity
14 Submergence :-

729171264.docx r mishra
a) Gross No submergence
b) Cultivated No submergence
c) Submergence Percentage Item 14 a) x 10 No submergence
Item 10 (c)
15 C.S.R. on Which The Estimate is Based :- S.O.R. in force from date
01.08.2010 of W.R. and amended
on date 22.08.2022deptt.
16 Cost Escalation (Provided Over The C.S.R. as :- No
Per 15 Above)
a) Earth Work Nil
b) Masonry Nil
17 General Tendered Percentage in The Area :- As per provision in estimate

18 Land Compensation per Acre :-


a) Cultivated Nil
b) Other cultivated Nil
19 Precentage of irrigation in Block from All :-
Sources Till
a) Add for Scheme Under Construction Not Required
b) Gross Percentage Irrigation after NotRequired
Completion of Ongoing Scheme as Well Not Required
as the Sceheme.

729171264.docx r mishra
ty lalk/ku foHkkx dh ifj;kstukvksa ds ijh{k.k gsrq tkap
fcUnq
¼foRr ea=ky; }kjk fu/kkZfjr½
1- ;kstuk dk uke % दुर्ग जिला के पुलगांव

नाला पर जंजगिरी के

पास दोन ksa rV पर

पिचिंग के साथ

डिसिल्टिंग का कार्य

2- ftys@ ftyksa dk uke tgka ;kstuk %nqxZ


dk;kZfUor ,oa {ks= ykHkkfUor gksxk
3- fodkl[k.M@ [kaMks ds uke tgka ;kstuk %ikVu
dk;kZfUor ,oa {ks= ukekadu gksxk
4- ;kstuk dk izdkj %गहनीकरण, बैंक सुरक्षा

कार्य
5- ;kstuk dk en %
6- ;kstuk dh ykxr %:- 307 27 yk[k
7- ;kstuk ds iw.kZ gksus dh vof/k ,oa o"kZ %12 ekg iz”kkldh;
Lohd`fr feyus ds
mijkar
8- izLrkfor flapkbZ {kerk %
d- okf"kZd %vko';d ugha
[k- lerqY; {ks= %vko';d ugha
9- izfrgsDVs;j ykxr ¼lerqY; {ks=½ %vko';d ugha
10- Mwc esa vkus okyh ouHkwfe {ks=Qy %'kwU;
gsDVs;j
11- mijksDr Mwc esa vkus okyh ouHkwfe dh %vko';d ugha
Lohd`fr dsUnz ls izkIr dj yh gS D;k
12- flafpr Hkwfe ds fo:) Mwc esa vkus okyh %vko';d ugha
Hkwfe dk {ks=Qy
13- Mwc esa vkus okys {ks= %
d- xkao dh la[;k %'kwU;
[k- ifjokjksa dh la[;k %'kwU;
x- dqy vkcknh %'kwU;
14- buds iquokZl gsr izLrko la{ks= esa ykxr %vko';d ugha
15- ;kstuk fdl iapo”khZ; ;kstuk esa “kkfey dh %vko';d ugha
xbZ gSA
[Type here]
16- ;kstuk dh rduhdh Dyh;jsUl dsUnzh; ty %vko';d ugha
vk;ksx@l{ke vf/kdkjh ls izkIr gS ;k ugh
17- ty lalk/ku ea=h th }kjk vuqeksfnr gS D;k %
18- ubZ ;kstuk@pkyw ;kstuk ¼iqujhf{kr½ %ubZ ;kstuk
19- ubZ@pkyw ;kstukdks “kkfey fd;k tkuk %&
d- o"kZ %&
[k- vc rd O;; dh xbZ jkf”k %&
20- ykxr c<+ tkus ds la{ksi esa dkj.k esa %Ykkxw ugha
izLrkfor gks
21- ftl iapo"khZ; ;kstuk esa “kkfey dh xbZgSA %&
mldk ljy Øekad
22- mDr ifj;kstuk ds fy;s ;kstuk esa n”kkZbZ %&
/kujkf”k ¼:- yk[k esa½
23- ;kstuk ds eq[; en esa n”kkZbZ xbZ /kujkf”k %&
¼:- yk[k esa½
24- orZeku esa flafpr Hkwfe dk izfr”kr %vko';d ugha
d- “kkldh; L=ksrksa ls %vko';d ugha
[k- v”kkldh; L=ksrksa ls %vko';d ugha
x- dqy lHkh L=ksrksa ls %vko';d ugha
25- ifj;kstuk ds iw.kZgksij c<+k gqvk vfrfjDr %vko';d ugha
flafpr Hkwfe dk izfr”kr
26- ykHkkfUor vkfnoklh d`’kdksa dk izfr”kr %vko';d ugha
27- ykHkkfUor fo”ks"k ?kVdksa dk izfr”kr %vko';d ugha
28- ;kstuk ls ykHkkfUor gksus okys fo/kkulHkk %ikVu
{ks=
29- ;kstuk ls ykHkkfUor gksus okyh vkcknh %
d- vkfnoklh %&
[k- gfjtu %&
x- dqy xzke %1 xzke
30- mn~ogu flapkbZ ;kstuk es %vko';d ugha
d- ;fn uydwi ij vk/kkfjr gksrh izLrkfor %vko';d ugha
vFkok vklikl ds uydwiksa dh rFkk
jftfLV foV losZ{k.k fjiksVZ {kerk ?k-
eh-
[k- lrgh L=ksr dqy miyC/k lk/kkj.k {kerk ? %vko';d ugha
k-eh- vFkok de ls de cgko flapkbZ ekg
31- iw.kZ gksu ij ;kstuk lapkyu ,oa lk/kkj.k %&
vk;@O;;
d- dqy O;; okf"kZd %“kwU;
[k- izfrgsDVs;j flafpr Hkwfe ij O;; %“kwU;

[Type here]
उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark
rkanqyk ty lalk/ku rkanqyk ty lalk/ku
milaHkkx dz-05 laHkkx
ft- nqxZ ¼N-x-½ nqxZ ¼N-x-½

[Type here]
PROFORMA TO ACCOMPANY ALL PROJECTS ESTIMATED
COSTING MORE THAN Rs. 5 LAKHS
PART-I
"PRELIMINARY"
1 Name of Scheme : BANK PROTECTION WORK ON
BOTH BANK OF PULGAON NALLA
NEAR JANJGIRI WITH PITCHING &
DESILTING WOKS
IN DISTT DURG

2 District : Bemetra
3 Origional Work/Extension and : Original
Improvement/ New Work
4 Plan/Trible Sub-Plan/Non Plan : Plan
5 Administrative Approved/A.A. Required : Yes
6 Technically Approved/Technical Approval : Yes, after receipt of AA T.S. will be
Required obtained within 2 month
7 Estimated Cost :
8 Area Proposed for Irrigation Kharif & : 102.00hact
Rabi

9 Date of Starting : After receipt of AA& TS


10 Anticipated Date of Completion : 12 Months After Reciept of T.S.
(If Fund Made Available)

11 Actual Expenditure to end of 11th Plan : Nil


12 Provision Under Tribal Sub-Plan : Nil
13 Actual Expenditure During The Last Year : Nil
14 Physical Progress to Date :
a) Cut off : Nil
b) Earth Work : Nil
c) Sluice : Nil

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

[Type here]
[Type here]
दुर्ग जिला के पुलगांव नाला पर जंजगिरी के पास दोन ksa rV पर पिचिंग के
साथ डिसिल्टिंग का कार्य

1- dk;Z dk uke % दुर्ग जिला के पुलगांव नाला

पर जंजगिरी के पास दोन ksa

rV पर पिचिंग के साथ

डिसिल्टिंग का कार्य

2- dNkj@midNkj % Ekgkunh dNkj@


f”koukFk
2-1 ftyk@rglhy@Cykd ua- % nqxZ@ ikVu @ikVu
xzke@i-g-u
2-2 fo/kkulHkk {ks= laln {ks= uke % ikVu
o uEcj
2-3 laHkkx@milaHkkx % dk;Zikyu vfHk;ark
rkanqyk ty lalk/ku
laHkkx nqxZ ¼N-x-
½@vuqfoHkkxh;
vf/kdkjh rkanqyk ty
lalk/ku milaHkkx dz- 05
nqxZ ¼N-x-½
2-4 foHkkx % ty lalk/ku foHkkx
3- dk;Z dk Lo:i % ewy dk;Z
¼ewydk;Z@foLrkj@lq/
kkj@iquZfuekZ.k@uohuhdj.k½
3-1 dk;ZØe ftl ds varxZr dk;Z % ;kstuk en
izLrkfor gS tokgj
jkstxkj ;kstuk@thou/kkjk@
jkgrdk;Z
3-2 ykHkkfUor vuqlwfpr % vko”;d ugha
tkfr@tutkfr ¼;fn gks rks½
4- 4-1 Vksiks “khV uacj % 64 – G/8
4-2 v{kkal ,oa ns”kkal % 200 5’ 57”& 810 19’57”

4-3 Vksiks “khV ds vuqlkj tyxzg.k % vko”;d ugha


{ks=
4-4 dk;Z dk izdkj LVki % गहनीकरण , बैंक सुरक्षा
Mse@fuLrkj
कार्य कार्य
rkykc@pkSd@jhpktZMse
5- Lkacaf/kr vkadMs ,oa uD”ksa ,df=r % vko”;d ugha
[Type here]
djuk
5-1 unh@ukys esa losZ{k.kk/khu % vko”;d ugha
dk;Z ds viLVªhe cfgaxk ,uhdV
fLFkr gS esa izLrkfor vFkok
iw.kZ dh xbZ ;kstuk
5-2 unh@ukys esa losZ{k.kk/khu % vko”;d ugha
dk;Z ds Mkmu LVªh;e esa
izLrkfor vFkok iw.kZ dh
xbZ ;kstuk
5-3 lkbV ij miyC/k “kq) ty xzg.k % vko”;d ugha
{ks=
5-4 o"kkZ ekid dsUnz] o"kkZ dk % 1150 lsehvkSlr
eki vf/kdre@U;wure@vkSlr
5-5 xzke ds uD”ks ij jsYos ykbu] % vko”;d ugha
lM+d iDds LVªDplZ nyny
tehu] fjt o oSyh ykbu n”kkZ;k
tkuk
6- izLrkfor ykHk %
6-1 izLrkfor flapkbZ % 0 00 हैक्ट
6-2 fuLrkj % gk¡
6-3 o"kkZ ty dk nksgu % gk¡
6-4 ty lao/kZu % gk¡
6-5 i;kZoj.k % gk¡
7- LFky fujh{k.k djus okys vf/kdkjh dk % Jh f”ko dqekj nsokaxu]
uke vuqfoHkkxh; vf/kdkjh
7-1 dk;Zikyu % Jh] ,l-ds-ikaMs
vfHk;ark@milapkyd@ifj;kstuk dk;Zikyu vfHk;ark
vf/kdkjh
7-2 fujh{k.k dk fnukad %
8- QhYM MkVk ,oa dk;Z LFky dh %
mi;qDrrk
8-1 fujh{k.k ds fnu lkbV ij ikuh ds cgko % &
dh ek=k
8-2 D;k fuEu ds fy;s dk;ZLFky %
mi;qDr gS
v- LVki Mse ds fy;s QkmUMs”ku % mi;qDr gS
LVªkVk
c- fuLrkj rkykc ds fy;s cka/k % mi;qDr gS
lfy@osLV fo;j
l- D;k mfpr ek=k esa fuekZ.k lkexzh % mi;qDr gS
dk;Z LFky fd utnhd miyC/k gS \
n- D;k d`f"k ;ksX; Hkwfe@ taxy % ugha
Mwc esa vkrk gS\
[Type here]
9- VksiksxzkfQd losZ{k.k D;k % vko”;d ugha
unh@ukys ds nksuksa fdukjksa ij cap
ekdZ lhfir dj fuEu fooj.kkuqlkj
losZ{k.k dj uD”ks cuk, tkrs gSA
1- LVkiMse “khVuD”kk % संलग्न

v- yscy gsrq fxzM % संलग्न


c- dUVwj bUjoy % संलग्न
l- {ks= % संलग्न
n- Ldsy % 1%100
2- dsisflVh fudkyus gsrq uD”kk %
v- yscy gsrq xzM % vko”;d ugha
c- dUVwj bUjoy % vko”;d ugha
l- {ks= % vko”;d ugha
n- Ldsy % vko”;d ugha
;g losZ mijksDr 9 ¼1½ gsrq fd;s
losZ{k.k dks c<+kdj fd;k tkuk
pkfg;sA
3- Mwc {ks= uD”kk % vko”;d ugha
v- yscy gsrq fxzM % vko”;d ugha
c- dUVwj bUjoy % vko”;d ugha
l- {ks= % vko”;d ugha
n- Ldsy % vko”;dugha
;g losZ mijksDr 9 ¼1½ gsrq fd;s %
losZ{k.k dks c<+kdj fd;k tkuk
pkfg;sA
4- ty xzg.k uD”kk ¼2-5 oxZ fd-eh- ls de %
{ks=Qy ds fy;s½
v- yscy gsrq fxzM % gk¡
c- dUVwj bUjoy % vko”;d ugha
l- {ks= % vko”;d ugha
n- Ldsy % vko”;d ugha
5- gkbMªksfyd xzsfM;sUV gsrq % gk¡
losZ{k.k 500 ehVj viLVªhe ,oa 500
ehVj Mkmu LVªhe esa cgrs gq, eq[;
ty/kkjk dh lrg fudkyk tkuk pkfg;sA

10- HkwxHkhZ; LFky ,oa uhao ijh{k.k %


10-1 D;k ;FksLV xgjkbZ rd % gk¡
Vªk;yfiV [kksns x;s gSA
10-2 D;k lrg ij pV~Vku ij miyC/k gS % gk¡
10-3 D;k LVªDpkj dh uhoa pV~Vku % gk¡
ij j[kh tkuh gSA
11- gkbMªks ykftdy ,o ekSle laca/kh v/;;u %
[Type here]
11-1 unh esa ns[kk x;k mPpre ty %
Lrj D;k gSA
11-2 de ls de 3 o’kZ ds fMLpktZ ds % vko”;d ugha
vkadMs D;k gSA
12- fuekZ.k lkexzh dk v/;;u %
12-1 D;k feV~Vh jsr] fxV~Vh o % gk¡
iRFkj ftuslhuksa ls ykuk gS
mlds fy;s ckjksa ,fj;k Iyku
Dokjh pkVZ cuk;k x;k gSA
12-2 D;kfuekZ.k lkexzh dh % gk¡
mi;ksfxrk dh tkap gsrjsr]
fxV~Vh o iRFkj ds fy;s
isVªksxzkfQd] ,ukfyll]
xzsfMax o HkkSfrd ijh{k.k
djk;s x;s gSA
12-3 fuekZ.k lkexzh dh yhM D;k % yhM pkVZ layXu gSA
gSA feV~Vh] jsr] fxV~Vh]
cksYMj] lhesaV] LVhy

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku rkanqyk ty lalk/ku
milaHkkx dz-05 laHkkx
ft- nqxZ ¼N-x-½ nqxZ ¼N-x-½

[Type here]
la{ksfidk
1- lkekU; fooj.k %दुर्ग जिला के पुलगांव नाला पर

जंजगिरी के पास दोन ksa rV पर

पिचिंग के साथ डिसिल्टिंग का कार्य

v- uke %दुर्ग जिला के पुलगांव नाला पर

जंजगिरी के पास दोन ksa rV पर पिचिंग

के साथ डिसिल्टिंग का कार्य

c- fodkl[k.M@rglhy %nqxZ
l- LFky %जंजगिरी
n- ftyk %nqxZ
?k- D;k mlh ukys ij Åij ;k uhps dh %gk¡
vksj
2- ykxr ¼yk[k :- esa½ %:- 307 27 yk[k
v- Lohd`fr %
c- okLrfod %
3- fuekZ.k dk;Z dk fooj.k %
v- dk;Z izkjaHk djus dh frfFk %iz”kkldh; Lohd`fr mijkar
c- dk;Z iw.kZdjus dh frfFk %,tSalh fQDl gksus ds i”pkr 12
ekg
4- fuekZ.k dk mn~ns”; izLrkfor %
v- fuLrkj %& gk¡
c- flapkbZ %& gk¡
1- cgko ls %& gk¡
2- iEi ls %& gk¡
l- vU; %& gk¡
tSls fd dq,a ds tyLrj esa o`f)
¼mn~ns”; dh iwfrZ ds laca/k
esa laf{kIr Vhi layXu dh
tkosAMse ls iw.kZ gksus
mijkar ds iw.kZdky dk
o"kZokj] C;kSjk fn;k tkosA ;fn
izLrkfor ykHk izkIr ugha gks
jgs gS rks dkj.kksa dks Li"V
fd;k tk;sA½
[Type here]
5- LVkiMse dk izdkj ¼LisflfQds”ku %vko';d ugha
bR;kfn
v- uhao ¼pV~Vku ij@vU; %gk¡
LVªsVk ij½
c- uhao dh xgjkbZ ¼ehVj esa½ % 00
l- iRFkj@dkaØhV dh tqM+kbZ %gk¡
n- xsVl@dM+h ¼uV cksYV ds %gk¡
lkFk gS vFkok dMht esa fooj.k
fn;k tkosA½
6- ty lacaf/kr fooj.k %vko';d ugha
v- tyxzg.k {ks= ¼oxZ fd-eh-½ %vko”;d ugha
c- ty cgko ds vkadM+s ?ku- eh- %vko';d ugha
esa ¼fo”ks"kdj ekg vDVw- ,oa
Qjojh esa½

7- :ikadu@rkduhdh Lohd`fr dk fooj.k %


v- bl gsrq dkSu l{ke gS ,oa okLro %v/kh{k.k vfHk;ark
esa fdlds }kjk Lohd`fr nh xbZ
c- D;kfoHkkx }kjk dksbZ %
fn”kkfunsZ”k@ekinaM
fu/kkZfjr gS\ ;fn gka rks mldh
izfrfyfi layXu dh tkosA
8- dk;Z dh orZeku fLFkfr %
v- D;k dk;Z lgh fLFkfr esa gS %ubZ ;kstuk
c- D;k VwVQwV gS rks D;k %vko”;d ugha
1- uhao fxjh gS %
2- uhao ds uhps ikuh fudy tkrk gS %vko”;d ugha
3- ih;lZ@foax oky VwV x;s gS %vko”;d ugha
4- LVkiMse ds ckt esa cSad %vko”;d ugha
5- xsV~l@dMht pksj pys x;s gS %vko”;d ugha
9- la/kkj.k %
v- iw.kZ gksus ds mijkar bldk j[k %
j[kko ds fy;s% fdruk gksrk gSA
c- bl gsrq okf"kZd O;; j[k j[kko ds %
fy;s fdruk gksrk gSA
l- ;fn Li"V vkcaVu ugha gS rks %vkcaVu gSA

[Type here]
j[kj[kko ds laca/k esa D;k
fLFkfr jgrh gS
n- la/kkj.k gsrq fujh{k.k dh D;k %la/kkj.k gsrq fujh{k.k ds fy,
O;oLFkk gSA dksbZ leqfpr O;oLFkk ugh
gSA o’kkZjr ds iwoZ ,oa ckn
esa fujh{k.k dj
mPpkf/kdkfj;ksa dks tkudkjh
iznku dh tkrh gSA

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;ZikyuvfHk;ark


rkanqyk ty lalk/ku milaHkkx dz- rkanqykty lalk/kulaHkkx
05 nqxZ ¼N-x-½
ft- nqxZ ¼N-x-½

[Type here]
CERTIFICATE

Certified that -

i. The quarries contain sufficient material of good quality from


nearest routes.

ii. Detailed investigation for alternative quarry has been made and the
proposed one is suitable with economical lead.

iii. There is sufficient water available at proposed site.

iv. There is no religious place, tomb or graveyard at proposed site.

v. The distance as shown in the quarry chart are as per actual and
measured Shortest route.

Sub Engr Sub Divisional Officer Executive Engineer


Tandula W R Sub Division Tandula W R Division
No 5 Durg Durg

[Type here]
CERTIFICATE

SUBJECT - BANK PROTECTION WORK ON BOTH BANK OF PULGAON NALLA NEAR


JANJGIRI WITH PITCHING & DESILTING WOKS IN DISTT DURG

Certified that calculation of quantities and rates shown in the above


estimate are correct and checked as per drawing proposals.

[Type here]
Ykkxr esa o`f) ckcr~ izek.k&i=

izekf.kr fd;k tkrk gS fd दुर्ग जिला के पुलगांव नाला पर जंजगिरी के पास


दोन ksa rV पर पिचिंग के साथ डिसिल्टिंग का कार्य dk izkDdyu vko”;d
leqfpr izko/kku j[kdj cuk;k x;k gS] le;kof/k esa vkcaVu gksus ij
Lohd`r jkf”k ds varxZr dk;Z lEikfnr gks tk;sxkA bl ;kstuk dh ykxr
dh ykxr esa 10 izfr”kr ls vf/kd dh o`f) ugha gksxhA

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku milaHkkx rkanqyk ty lalk/ku
dz-05 laHkkx
ft- nqxZ ¼N-x-½ nqxZ¼N-x-½

[Type here]
yhM izek.k&i=

izekf.kr fd;k tkrk gS fd दुर्ग जिला के पुलगांव नाला पर जंजगिरी के


पास दोन ksa rV पर पिचिंग के साथ डिसिल्टिंग का कार्य
gsrq lkexzh
utnhd ds Dokjh ls yk;h tk;sxh rFkk Dokjh esa
vko”;drkuqlkj i;kZIr lkexzh miyC/k gSA

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku rkanqyk ty lalk/ku laHkkx
milaHkkx dz-05 nqxZ¼N-x-½
ft- nqxZ ¼N-x-½

[Type here]
izek.k&i=

izekf.kr fd;k tkrk gS fd izLrkfor ;kstuk ty lalk/ku


foHkkx }kjk izpfyr nj vuqlwph tks fd 01-08-2010 ls izHkko”khy
gS] ftldh la”kksf/kr nj vuqlwph izeq[k vfHk;ark ds i= dz-341@v-
lw-@2010@cks-iz-@2016@7686] fnukad 22-08-2022 ls izkDdyu
rS;kj fd;k x;k gSA

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku milaHkkx dz- rkanqyk ty lalk/ku
05 laHkkx
ft- nqxZ ¼N-x-½ nqxZ¼N-x-½

[Type here]
futh laifRr laca/kh izek.k i=

izekf.kr fd;k tkrk gS fd दुर्ग जिला के पुलगांव नाला पर जंजगिरी के


पास दोन ksa rV पर पिचिंग के साथ डिसिल्टिंग का कार्य
ds varxZr fdlh
Hkh xzke esa futh Hkwfe rFkk lEifRr vftZr djus dh dksbZ
vko';drk ugha gSA

उपअभियंता vuqfoHkkxh; vf/kdkjh dk;Zikyu vfHk;ark


rkanqyk ty lalk/ku milaHkkx rkanqyk ty lalk/ku
dz-05 laHkkx
ft- nqxZ ¼N-x-½ nqxZ¼N-x-½

[Type here]
दुर्ग जिला के पुलगांव नाला पर जंजगिरी के पास दोन ksa rV पर पिचिंग के
साथ डिसिल्टिंग का कार्य

1- जंजगिरी -

उपअभियंता vuqfoHkkxh; vf/kdkjh


rkanqyk ty lalk/ku milaHkkx dz-
05
ft- nqxZ ¼N-x-½

[Type here]