Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

Palasa kidney HVAC AS PER DWG PROPOSED QTY

CAPACITY QTY CAPACITY QTY TOTAL


S.no room name length(M) breadth(M) area(M2) As per drawing praposed TOTAL (TR)
(TR) (NOS) (TR) (NOS) (TR)

1 Ground floor block-A

ward(5beds) 1 X 2 7 6 84 ducting cassette 11 1 11 3.2 3 9.6


Minor o.t 1 X 1 7.255 6.115 44.36 cassette cassette 4 1 4 4 1 4
C.T scan 1 X 1 6.885 5 34.425 cassette cassette 3.2 1 3.2 3.2 1 3.2
2 First floor Block-A
seminar hall-1 1 X 1 4.985 8.48 42.27 DX casette DX casette 3.5 1 3.5 3.5 1 3.5 NOT IN VRF
seminar hall-2 1 X 1 4.835 8.48 41.00 DX casette DX casette 3.5 1 3.5 3.5 1 3.5 NOT IN VRF
meeting hall 1 X 1 7.255 6.115 44.36 casette cassette 3.2 1 3.2 3.2 1 3.2

Superintendent chamber 1 X 1 6.885 5.48 37.73 casette cassette 3.5 1 3.5 4 1 4

4 Second floor Block-B


dialysis ward 1 X 2 14.43 18.575 536.07 ducting ducting 11 4 44 11 2 22
5 Third floor Block-A

Pre-operative ward 1 X 1 9.08 8.595 78.04 DX cassette DX cassette 3.5 2 7 4 1 4 NOT IN VRF

Post operative ward 1 X 1 14.43 8.595 124.03 ducting cassette 11 1 11 4 1 4


6 Third floor Block-B
Post operative ward 1 X 1 10.035 12.83 128.75 Ducting cassette 11 1 11 4 1 4
Blood store 1 X 1 6.9 3.6 24.84 cassette cassette 3.2 1 3.2 3.2 1 3.2
8 Fourth floor Block-B
Reasearch lab-1,2 1 X 2 7.37 9.23 136.0502 cassette cassette 3.2 4 12.8 3.2 2 6.4
Standard lab-1,2 1 X 2 4.8 9.23 88.608 cassette cassette 4 2 8 4 2 8
Different research lab 1 X 1 13.95 6.16 85.932 cassette cassette 3.2 2 6.4 3.2 1 3.2
I P M lab 1 X 1 7.37 18.69 137.7453 ducting ducting 11 1 11 11 1 11
Lab-1,2 1 X 2 4.8 9.23 88.608 cassette cassette 4 2 8 4 2 8
Seminar hall 1 X 1 6.465 8.595 55.566675 cassette cassette 4 1 4 4 1 4
Lecture hall 1 X 1 16.43 8.595 141.21585 ducting ducting 11 1 11 11 1 11

total(Sq.m)= 1948.215075

total rooms + corrides area= 4815.0

1st floor Block-A communication


9 1 X 2 7.37 9.37 138.1138 DX cassette cancelled
rooms

1st floor Block-A informaton


10 1 X 2 7.37 9.09 133.9866 DX cassette cancelled
room
11 3rd floor Block-A OT 1 X 1 7.195 6.055 43.565725 Ducting split ac
S.no room name length(M) breadth(M) area(M2)

1 first floor block-A


3.0 m wide corridor (back side) 1 X 1 21.09 3 63.27
2.4 m corridor 1 X 2 19.035 2.4 91.368
3.0 m corridor (front) 1 X 1 30.9 3 92.7
2 first floor block-Ramp
Ramp corrider 1 X 1 29.395 3 88.185
3 first floor block-B
3.0 m wide corridor (back side) 1 X 1 21.09 3 63.27
2.4 m corridor 1 X 2 18.8 2.4 90.24
3.0 m corridor (front) 1 X 1 30.79 3 92.37
4 Second floor Block-A
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
2.4 m corridor 1 X 2 18.8 2.4 90.24
3.0 m corridor (front) 1 X 1 30.905 3 92.715
5 Second floor block-Ramp
Ramp corrider 1 X 1 29.51 3 88.53
6 Second floor Block-B
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
corridors at waiting area-1 1 X 1 18.575 4.6 85.445
corridors at waiting area-2 1 X 1 18.575 3
3.0 m corridor (front) 1 X 1 30.905 3 92.715
7 Third floor Block-A
3.0 m wide corridor (back side) 1 X 1 21.46 3 64.38
2.4 m corridor 1 X 1 18.8 2.4 45.12
3.0 m corridor (front) 1 X 1 30.905 3 92.715
8 Third floor block-Ramp
Ramp corrider 1 X 1 29.51 3 88.53
9 Third floor Block-B
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
3.0 m corridor (front) 1 X 1 30.905 3 92.715
10 Fourth floor Block-A
2.4 m corridor 1 X 1 18.8 2.4 45.12
3.0 m corridor (front) 1 X 1 30.905 3 92.715
3.0 m corridor (back) 1 X 1 21.46 3 64.38
11 Forth floor block-Ramp
Ramp corrider 1 X 1 29.51 3 88.53
12 Fourth floor Block-B
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
3.0 m corridor (front) 1 X 1 30.905 3 92.715
4.16m corridor 1 X 1 18.8 4.16 78.208
2.4m corridor 1 X 1 18.8 2.4 45.12
13 Fifth floor Block-A
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
2.4 m corridor 1 X 2 18.8 2.4 90.24
3.0 m corridor (front) 1 X 1 30.905 3 92.715
14 Fifth floor block-Ramp
Ramp corrider 1 X 1 29.51 3 88.53
15 Fifth floor Block-B
3.0 m wide corridor (back side) 1 X 1 27.275 3 81.825
2.4 m corridor 1 X 2 18.8 2.4 90.24
3.0 m corridor (front) 1 X 1 30.905 3 92.715
total(sq.m)= 2866.686
room breadth(
S.no length(M) area(M2)
name M)
3 Third floor Block-A
ward(6be
1 X 2 7.37 6.115 90.1351
ds)
ward (4
1 X 2 4.8 6.115 58.704
beds)
ward (20
1 X 1 23.37 8.595 200.8652
beds)
7 Fifth floor Block-A
ward(6be
1 X 2 7.37 6.115 90.1351
ds)
ward (4
1 X 2 4.8 6.115 58.704
beds)
ward (20
1 X 1 23.37 8.595 200.8652
beds)

A.H.U
1st a 1 X 1 6.24 3 18.72
room
A.H.U
1 X 1 6.885 3 20.655
room-1
3rd b
A.H.U
1 X 1 6.515 3 19.545
room-2
A.H.U
1 X 1 7.255 4.58 33.2279
room-1
A.H.U
4th a 1 X 1 7.255 3 21.765
room-2
A.H.U
1 X 1 6.515 3 19.545
room-3
A.H.U
4th b 1 X 1 6.515 3 19.545
room-1
A.H.U
1 X 1 6.885 3 20.655
room-1
5th b
A.H.U
1 X 1 4.3 5.25 22.575
room-2
895.6414
Palasa kidney HVAC AS PER DWG PROPOSED QTY

S.no Room name length(M) breadth(M) area(M2) As per drawing praposed CAPACITY (TR) QTY (NOS) TOTAL (TR) CAPACITY (TR) QTY (NOS)

1 Ground floor block-A

ward(5beds) 1 X 2 7 6 84 ducting cassette 11 1 11 3.2 3


Minor o.t 1 X 1 7.255 6.115 44.36 cassette cassette 4 1 4 4 1
C.T scan 1 X 1 6.885 5 34.425 cassette cassette 3.2 1 3.2 3.2 1
Meeting hall 1 X 1 7.255 6.115 44.36 casette cassette 3.2 1 3.2 3.2 1
2 First floor Block-A

Superintendent chamber 1 X 1 6.885 5.48 37.73 casette cassette 3.5 1 3.5 4 1

5 Third floor Block-A


Post operative ward 1 X 1 14.43 8.595 124.03 ducting cassette 11 1 11 3.2 3
4 Second floor Block-B
Dialysis ward 1 X 2 14.43 18.575 536.07 ducting ducting 11 4 44 11 4
6 Third floor Block-B
Blood store 1 X 1 6.9 3.6 24.84 cassette cassette 3.2 1 3.2 3.2 1

6 Third floor Block-B


Post operative ward 1 X 1 10.035 12.83 128.75 Ducting cassette 11 1 11 3.2 3
8 Fourth floor Block-B
Reasearch lab-1,2 1 X 2 7.37 9.23 136.0502 cassette cassette 3.2 4 12.8 3.2 4
I P M lab 1 X 1 7.37 18.69 137.7453 ducting ducting 11 1 11 11 1
PROPOSED QTY

TOTAL (TR)

9.6
4
3.2
3.2
20 20

9.6
13.6 20
44

3.2
47.2 60

9.6

12.8
11
33.4 40

You might also like