SD-ST-010 Post Tension Drawing Calculation Reports For All Zones - Updated
SD-ST-010 Post Tension Drawing Calculation Reports For All Zones - Updated
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
General Notes
12
4- ALL LEVELS INDICATED ARE STRUCTURAL SLAB
LEVELS UNLESS OTHERWISE INDICATED.
P.T SLAB
5- THIS DRAWING TO BE READ IN CONJUNCTION WITH
Z03-B03-300X1000
Z03-B03-300X1000
10 THIK. 350mm
Z02-B03-300X1000
F'c=35MPa 11
600
RELEVANT STRUCTURAL , ARCHITECTURAL ,
Z01-B04-300X800
Z02-B03-300X1000
MECHANICAL & ELECTRICAL DRAWINGS , DETAILS &
600
AA Z03-B04-01-300X950 Z03-B04-01-300X950
SPECIFICATIONS . THE CONTRACTOR SHALL
BA COORDINATE THESE DRAWINGS AND DOCUMENTS
Z02-B03-300X1000
AND REPORT IF ANY DISCREPANCY FOR
Z03-B03-300X1000
18 CLARIFICATION BEFORE PROCEEDING WITH THE
Z03-B05-01-400X800
WORK INVOLVED .
Z01-B03A-3-400X1450
Z02-B03-300X1000
8
Z01-B04-300X800
P.T SLAB
THIK. 350mm
F'c=35MPa
Z0
3-
B0
5-
01
BB FOOTINGS .
00
X7
00
1-4
Z03-B03-300X1000
-0
06
3-B
AB
Z0 16 Z01-B04 Z01-B04
7- DESIGN FOUNDATION IS BASED ON ASSUMED NET
Z01-B03A-2-400X1450
700
Z02-B03-300X1000
Z01-B04-300X800
0X
Z02-B03-300X1000
-40
P.T SLAB
2
6-0
P.T SLAB
THIK. 350mm
Z03
CB-03
BC
06-02
Z03-B
Z01-B03A-1-400X1450
15
AC CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
Z01-B04-300X800
Z01-B06-300X1620
Z02-B03-300X1000
Z01-B06A-300X1620
Z01-B07-300X1620
Z01-B07-300X1620
Z0
3-B
06
-04
00 -40
0X
X8 70
00 0 Z01-B06-300X1620
1-4
Z0
3-
B 05
- 0
REINFORCEMENT LEGEND:
Z03-B05A-01-400X800
Z02-B03-300X1000
P.T SLAB 950 950 950 950 950
THIK. 350mm Z01-B01-300X900
Z01-B01-300X900 Z01-B01-300X900 Z01-B01-300X900 Z01-B01-300X900
BD
F'c=35MPa TOP REINFORCEMENT
9
Location of stair starter is BOTTOM REINFORCEMENT
19
not matching with Arch.
AD
Z01-B03-500X1000/1500
P.T SLAB
Z02-B03-300X1000
Z03-B03-01-300X950 Z03-B03-02-300X950 Z03-B03-01-300X950 Z03-B03-01-300X950 Z03-B03-02-300X950 Z03-B03-02-300X950 Z03-B03-03-300X950 Z03-B03-01-300X950 Z03-B03-02-300X950 Z03-B03-03-300X950
Z01-B02-400X900/1500
BE
Z01-B02-400X900/1500
THIK. 350mm
Z01-B02-400X900/1500
Z01-B02-400X900/1500
Z01-B02-400X900/1500
F'c=35MPa
600
600
600
600
AE
Z03-B01A-400X1250
Z02-B03-300X1000
Z03-B01-850X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
13
14
Main Contractor
Project Title
B Approved as Noted BANK ALJAZIRA
RIYADH
C Resubmitted As Noted Drawing Title
D Disapproved
-These drawings must be stamped by Esolution Company
before construction, and this approval is considered F No Action Taken
ineffective without Esolution Company’s stamp GROUND FLOOR
-All levels and dimensions should be coordinated with Signature Date GENERAL ARRANGEMENT LAYOUT PLAN
Hassan Al Mawaldi 20/11/2023
ARCH before the constructions. MASTER PLAN
-All openings should be coordinated with ARCH & MEP This drawing has been reviewed for design and general arrangement only.
before the constructions. The action indicated does not relieve the contractor from responsibility for Approved Seal Date
full compliance with the Contract Documents and other working drawings.
Contractor shall indicate on his submittal any deviation, if any, from
Designed Drawn Checked
Contract Documents.
The action indicated shall not vary the Contract Sum. M.K M.S M.A
Scale A1 (594x841) Revision No
1-300 00
Drawing No
ES-PL-FP-GF-GA-M
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
Z01-B04-300X800
Z02-B03-300X1000
3- ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
ARE IN METERS UNLESS OTHERWISE INDICATED.
Z01-B03A-3-400X1450
Z02-B03-300X1000
8
Z01-B04-300X800
WORK INVOLVED .
Z01-B04 Z01-B04
CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
Z01-B03A-2-400X1450
Z02-B03-300X1000
Z01-B04-300X800
Z02-B03-300X1000
P.T SLAB
THIK. 350mm REINFORCEMENT LEGEND:
P.T SLAB
F'c=35MPa THIK. 350mm TOP REINFORCEMENT
Z01-B04 Z01-B04 F'c=35MPa
BOTTOM REINFORCEMENT
CB-03
BC
Z01-B03A-1-400X1450
Z01-B04-300X800
Z01-B06-300X1620
Z02-B03-300X1000
Z01-B06A-300X1620
Z01-B07-300X1620
Z01-B07-300X1620
Z01-B06-300X1620
P.T SLAB 950 950 950 950 950 Revision No. Description Date
THIK. 350mm Z01-B01-300X900
Z01-B01-300X900 Z01-B01-300X900 Z01-B01-300X900 Z01-B01-300X900
BD Revisions
F'c=35MPa Client
9
Location of stair starter is
not matching with Arch.
Z01-B03-500X1000/1500
P.T SLAB
Z02-B03-300X1000
Z03-B03-03-300X950
Z01-B02-400X900/1500
BE
Z01-B02-400X900/1500
THIK. 350mm
Z01-B02-400X900/1500
Z01-B02-400X900/1500
Z01-B02-400X900/1500
F'c=35MPa
Z02-B03-300X1000
RegistrationNo.248
P.O.Box146,Riyadh
Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
Project Title
BANK ALJAZIRA
C Resubmitted As Noted
RIYADH
D Disapproved Drawing Title
-These drawings must be stamped by Esolution Company GROUND FLOOR GENERAL ARRANGEMENT LAYOUT PLAN
01 ( ZOON-01 ) F No Action Taken
before construction, and this approval is considered
ineffective without Esolution Company’s stamp Signature Date GROUND FLOOR
-All levels and dimensions should be coordinated with Hassan Al Mawaldi 20/11/2023
GENERAL ARRANGEMENT LAYOUT PLAN
ARCH before the constructions. ( ZONE-01 )
This drawing has been reviewed for design and general arrangement only.
-All openings should be coordinated with ARCH & MEP The action indicated does not relieve the contractor from responsibility for
before the constructions. full compliance with the Contract Documents and other working drawings.
Approved Seal Date
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents.
The action indicated shall not vary the Contract Sum. Designed Drawn Checked
1-125 00
Drawing No
ES-PL-FP-GF-GA-Z1
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
Z03-B03-300X1000
Z03-B03-300X1000
2- ANY DISCREPANCIES , IF ANY TO BE BROUGHT TO THE
Z02-B03-300X1000
ATTENTION OF THE ARCHITECT / ENGINEERS.
600
ARE IN METERS UNLESS OTHERWISE INDICATED.
Z02-B03-300X1000
Z03-B03-300X1000
MECHANICAL & ELECTRICAL DRAWINGS , DETAILS &
SPECIFICATIONS . THE CONTRACTOR SHALL
COORDINATE THESE DRAWINGS AND DOCUMENTS
AND REPORT IF ANY DISCREPANCY FOR
CLARIFICATION BEFORE PROCEEDING WITH THE
WORK INVOLVED .
COLUMN LEGEND:
Z03-B03-300X1000
16
CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
Z02-B03-300X1000
P.T SLAB REINFORCEMENT LEGEND:
P.T SLAB THIK. 350mm
TOP REINFORCEMENT
THIK. 350mm F'c=35MPa
F'c=35MPa BOTTOM REINFORCEMENT
15
Z02-B03-300X1000
Revision No. Description Date
Revisions
Client
600
600
Programme / Programme Management Consultant
Z03-B01A-400X1250
Z02-B03-300X1000
Z03-B01-850X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
Main Contractor
13
ARABIAN CONSULTING ENGINEERING SERVICES Posttension Contractor
14 Bahrain Tower,
Project Title
D Disapproved
GROUND FLOOR
-These drawings must be stamped by Esolution Company GENERAL ARRANGEMENT LAYOUT PLAN
F No Action Taken
before construction, and this approval is considered ( ZONE-02 )
ineffective without Esolution Company’s stamp Signature Date
-All levels and dimensions should be coordinated with Hassan Al Mawaldi 20/11/2023
Approved Seal Date
full compliance with the Contract Documents and other working drawings. M.K M.S M.A
before the constructions. Contractor shall indicate on his submittal any deviation, if any, from Scale A1 (594x841) Revision No
ES-PL-FP-GF-GA-Z2
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
A1 A2 A3 A4 A5 A5'
General Notes
Z03-B05-01-400X800
CLARIFICATION BEFORE PROCEEDING WITH THE
P.T SLAB WORK INVOLVED .
THIK. 350mm
F'c=35MPa
Z0
6- FOUNDATION LEVEL ( BOTTOM LEVEL OF RC .
3-
B0
5-
FOOTINGS .
01
-4
00
X8
00
7- DESIGN FOUNDATION IS BASED ON ASSUMED NET
BEARING CAPACITY AS PER SOIL REPORT.
70
0 COLUMN LEGEND:
00X
1-4
06-0
3- B
Z0
AB CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
700
0X
2 -40
6-0
REINFORCEMENT LEGEND:
-B0
Z03
Z03-B05-01-400X800 P.T SLAB TOP REINFORCEMENT
20
THIK. 350mm
BOTTOM REINFORCEMENT
F'c=35MPa
0
0X70 -40
3 -B 06-02
0
AC
Z
Z0
3-B
06
-04
00 -40
8 0X
0X 70
0
-40
- 01
5
- B0
3
Z0 00 ISSUED FOR COORDINATION 2023-10-19
Z03-B05A-01-400X800
Revision No. Description Date
Revisions
Client
19
600
600
AE Programme / Programme Management Consultant
ARABIAN CONSULTING ENGINEERING SERVICES
RegistrationNo.248
Z03-B02-400X1250
Z03-B02-400X1250
Z03-B01-850X1250
Z03-B01-850X1250
Z03-B01-850X1250
P.O.Box146,Riyadh
Main Contractor
A Approved
Posttension Contractor
Bahrain Tower,
B Approved as Noted King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
Project Title
D Disapproved BANK ALJAZIRA
RIYADH
F No Action Taken Drawing Title
-These drawings must be stamped by Esolution Company This drawing has been reviewed for design and general arrangement only. GROUND FLOOR
The action indicated does not relieve the contractor from responsibility for
before construction, and this approval is considered full compliance with the Contract Documents and other working drawings. GENERAL ARRANGEMENT LAYOUT PLAN
ineffective without Esolution Company’s stamp Contractor shall indicate on his submittal any deviation, if any, from ( ZONE-03 )
Contract Documents.
-All levels and dimensions should be coordinated with The action indicated shall not vary the Contract Sum.
ARCH before the constructions. Approved Seal Date
1-125 00
Drawing No
ES-PL-FP-GF-GA-Z3
KEY PLAN
B6
BD BA A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
1 : 50 10 1 : 50
4- ALL LEVELS INDICATED ARE STRUCTURAL SLAB
LEVELS UNLESS OTHERWISE INDICATED.
REINFORCEMENT LEGEND:
Section 11
11 Section 12 TOP REINFORCEMENT
1 : 50 12 1 : 50 Section 13
BOTTOM REINFORCEMENT
AD AE
13 1 : 50
A8 A9 A9'
RC Ramp 300 mm THK
Section 18 Client
Revisions
18 1 : 50
C16 PT Beam (700x1000)
C6-1 RW-400mm
15 Section 16
Section 14 1 : 50 16 1 : 50
14 1 : 50
A2 Programme / Programme Management Consultant
Project Title
Signature Date
General Details
ineffective without Esolution Company’s stamp Hassan Al Mawaldi 20/11/2023
-All levels and dimensions should be coordinated with
ARCH before the constructions. This drawing has been reviewed for design and general arrangement only.
The action indicated does not relieve the contractor from responsibility for
-All openings should be coordinated with ARCH & MEP full compliance with the Contract Documents and other working drawings.
Beam (400x800) Contractor shall indicate on his submittal any deviation, if any, from
before the constructions. With Ramp Contract Documents.
Approved Seal Date
The action indicated shall not vary the Contract Sum. Designed Drawn Checked
1-125 00
Section 20 Drawing No
ES-PL-FP-GF-GD
20 1 : 50
KEY PLAN
TOP BARS
Beam Label SPAN Width Depth BOTT BARS
MID SUPPORT SIDE BARS STIRRUPS
END SUPPORT MID SPAN A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
LEFT SUPPORT BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BE
BD
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
Z01 B01 01 300 900 950 4-20 - 5-20 - 6-20 - 6-20 - 4-20E T12@200 T10@200 T10@200 T10@200
ARABIAN CONSULTING ENGINEERING SERVICES
02 300 900 950 4-20 - - - 6-20 - 6-20 - 4-20E T12@200 T10@200 T10@200 T10@200
RegistrationNo.248
03 300 900 950 4-20 - - - 6-20 - 6-20 - 4-20E T12@200 T10@200 T10@200 T10@200
04 300 900 950 4-20 - 5-20 - - - - - 4-20E T12@200 T10@200 T10@200 T10@200
P.O.Box146,Riyadh
General Notes
Z01 B02 01 400 900/1500 4-20 2T20
- 7-20 - - - - - 4-20E T10@100-4L T10@200-4L T10@100-4L
1- DO NOT SCALE FROM THIS DRAWING ONLY WRITTEN
Z01 B03 01 500 1000/1500 4-25 4-25 5-20 3-20 - - 4-20 4-20 4-25E T12@200 T10@200-4L T10@200-4L T10@200-4L DIMENSIONS SHOULD BE FOLLOWED . ALL EXISTING
A Approved DIMENSIONS TO BE CHECKED AT SITE PRIOR TO
Z01 B03A 01 400 1450 4-20 3-20 4-20 3-20 - - 4-20 4-20 4-20E T12@200 T10@200 T10@200 T10@200
COMMENCEMENT OF WORKS OR MANUFACTURING OF
02 400 1450 4-20 3-20 4-20 3-20 4-20 4-20 4-20 4-20 4-20E T12@200 T10@200 T10@200 T10@200 COMPONENT.
B Approved as Noted
03 400 1450 4-20 3-20 4-20 3-20 4-20 4-20 - - 4-20E T12@200 T10@200 T10@200 T10@200 2- ANY DISCREPANCIES , IF ANY TO BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT / ENGINEERS.
Z01 B04 01 300 800 4-20 4-20 - - - - - 2-20E - T10@200 T10@200 T10@200
C Resubmitted As Noted
Z01 B05 01 300 800 3-20 - 3-20 - 4-20 4-20 - - 2-16E - T10@200 T10@200 T10@200 3- ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
ARE IN METERS UNLESS OTHERWISE INDICATED.
02 300 800 3-20 - 3-20 - 4-20 4-20 - - 2-16E - T10@200 T10@200 T10@200 D Disapproved
4- ALL LEVELS INDICATED ARE STRUCTURAL SLAB
Z01 B06 01 300 1620 4-20 3T20 4-20 - - - - - 2-20E T12@200 T10@200 T10@200 T10@200 LEVELS UNLESS OTHERWISE INDICATED.
Z01 B06A 01 300 1620 4-20 3-20 4-20 3-20 - - - - 2-20E T12@200 T10@200 T10@200 T10@200 F No Action Taken 5- THIS DRAWING TO BE READ IN CONJUNCTION WITH
Z01 B06 01 300 1620 4-25 3-25 4-25 3-25 - - - - 2-20E T12@100 T12@100 T12@100 T12@100 RELEVANT STRUCTURAL , ARCHITECTURAL ,
Signature Date MECHANICAL & ELECTRICAL DRAWINGS , DETAILS &
SPECIFICATIONS . THE CONTRACTOR SHALL
TOP BARS Hassan Al Mawaldi 20/11/2023 COORDINATE THESE DRAWINGS AND DOCUMENTS
Beam Label SPAN Width Depth AND REPORT IF ANY DISCREPANCY FOR
MID SUPPORT SIDE BARS STIRRUPS
MID SPAN CLARIFICATION BEFORE PROCEEDING WITH THE
This drawing has been reviewed for design and general arrangement only. WORK INVOLVED .
BOTT BARS END SUPPORT LEFT SUPPORT RIGHT SUPPORT Bar E Zone A Zone B Zone C The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings. 6- FOUNDATION LEVEL ( BOTTOM LEVEL OF RC .
Bar F Bar G Bar A Bar B Bar C1 Bar D1 Bar C2 Bar D2 FOOTINGS .
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents. 7- DESIGN FOUNDATION IS BASED ON ASSUMED NET
Z03 B01 01 850 1250 SEE BEAM ELEVATION should be submitted The action indicated shall not vary the Contract Sum. BEARING CAPACITY AS PER SOIL REPORT.
Z03 B02 01 400 1250 SEE BEAM ELEVATION should be submitted COLUMN LEGEND:
Z03 B03 01 300 1000 4-20 - 4-20 - - - - - 2-20E - T10@200 T10@200 T10@200
Z03 B04 01 300 950 4-20 - 4-20 - - - 4-20 - 2-16E - T10@200 T10@200 T10@200 CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
Z03 B05 01 400 800 4-25 - 4-25 - - - - - 4-25E T12@200 T10@200 T10@200 T10@200
REINFORCEMENT LEGEND:
Z03 B05A 01 400 800 4-25 4-25 4-25 - - - - - 4-25E T12@200 T10@200 T10@200 T10@200
TOP REINFORCEMENT
Z03 B06 01 400 700 4-25 - 4-25 - 4-20 - - - 2-20E T10@200 T10@200 T10@200 T10@200 BOTTOM REINFORCEMENT
02 400 700 4-25 - - - 4-20 - 4-20 - 2-20E T10@200 T10@200 T10@200 T10@200
04 400 700 4-25 - 4-25 - - - 4-20 - 2-20E T10@200 T10@200 T10@200 T10@200
Z02 B03 01 300 1000 5-25 - 5-25 - - - - - 3-25E - T10@100 T10@100 T10@100 -All openings should be coordinated with ARCH & MEP Client
Revisions
Z02 B03 02 300 1000 5-25 - - 5-25 - 5-25 - 3-25E - T10@100 T10@100 T10@100 before the constructions.
0.25Ln1 0.3Ln1 or 0.3Ln2 (Larger) 0.3Ln1 or 0.3Ln2 (Larger) 0.3Ln2 or 0.3LnN (Larger) 0.3Ln2 or 0.3LnN (Larger) 0.25LnN
d
h
h
h
F G F G F G Posttension Contractor
Bahrain Tower,
0.125Ln1 0.125Ln2 0.125Ln2 0.125LnN King Fahed St , Olaia,
Riyadh , Saudi Arabia
ZONE A ZONE B ZONE C ZONE D ZONE E ZONE A ZONE B ZONE C ZONE D ZONE E ZONE A ZONE B ZONE C ZONE D ZONE E Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
info@esolution-pt.com
www.esolution-pt.com
NOTES:
esolution construction & Engineering
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
precast & Post tension concrete specialists
2. CONTINUOUS BOTTOM BAR 'G' SHALL BE SPLICED AT THE SUPPORT AS NEEDED.
Project Title
BANK ALJAZIRA
RIYADH
Drawing Title
Ln
Ln1 Ln2
0.25Ln 0.25Ln
Z03-BEAMS REINFORCEMENT
0.25Ln1 0.3Ln1 or 0.3Ln2 (Larger) 0.3Ln1 or 0.3Ln2 (Larger) 0.25Ln2
0.2Ln
BEAM HEIGHT
0.2Ln BEAM HEIGHT BEAM HEIGHT
DETAILS
0.2Ln1 0.2Ln1 or 0.2Ln2 (Larger) 0.2Ln1 or 0.2Ln2 (Larger) 0.2Ln2
B A E C D
B A E D C E A B
d
d
h
F G F G F G
Approved Seal Date
0.125Ln1 0.125Ln2
ZONE A ZONE B ZONE C ZONE D ZONE E ZONE A ZONE B ZONE C ZONE D ZONE E
ZONE A ZONE B ZONE C Designed Drawn Checked
1-125 00
Drawing No
ES-PL-FP-GF-GD
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
General Notes
600
AA
SPECIFICATIONS . THE CONTRACTOR SHALL
BA COORDINATE THESE DRAWINGS AND DOCUMENTS
AND REPORT IF ANY DISCREPANCY FOR
CLARIFICATION BEFORE PROCEEDING WITH THE
WORK INVOLVED .
COLUMN LEGEND:
BC
AC CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
REINFORCEMENT LEGEND:
BD
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AD
BE
600
600
600
600
AE
P.O.Box146,Riyadh
D Disapproved
Main Contractor
F No Action Taken
Signature Date
Hassan Al Mawaldi 20/11/2023 Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
*℄ Fax: +966 (11) 201 9859
This drawing has been reviewed for design and general arrangement only. info@esolution-pt.com
www.esolution-pt.com
℄
The action indicated does not relieve the contractor from responsibility for esolution construction & Engineering
precast & Post tension concrete specialists
full compliance with the Contract Documents and other working drawings.
Project Title
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents. BANK ALJAZIRA
The action indicated shall not vary the Contract Sum. RIYADH
Drawing Title
1-300 00
Drawing No
ES-PL-FP-GF-HZ-M
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
BC
BE
Main Contractor
Posttension Contractor
ARABIAN CONSULTING ENGINEERING SERVICES Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
RegistrationNo.248 Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
Project Title
BANK ALJAZIRA
A Approved RIYADH
Drawing Title
B Approved as Noted
GROUND FLOOR HORIZONTAL TENDONS LAYOUT
01 ( ZOON-01 ) C Resubmitted As Noted
The action indicated does not relieve the contractor from responsibility for
-All openings should be coordinated with ARCH & MEP full compliance with the Contract Documents and other working drawings.
M.K
Scale A1 (594x841)
M.S M.A
Revision No
before the constructions. Contractor shall indicate on his submittal any deviation, if any, from 1-125 00
Contract Documents.
Drawing No
The action indicated shall not vary the Contract Sum.
ES-PL-FP-GF-HZ-Z1
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
600
ARE IN METERS UNLESS OTHERWISE INDICATED.
COLUMN LEGEND:
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
600
600
Programme / Programme Management Consultant
Main Contractor
Project Title
ES-PL-FP-GF-HZ-Z2
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
A1 A2 A3 A4 A5 A5'
General Notes
COLUMN LEGEND:
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AC
P.O.Box146,Riyadh
AD
B Approved as Noted
600
600
AE C Resubmitted As Noted Programme / Programme Management Consultant
D Disapproved
Main Contractor
F No Action Taken
Signature Date
Hassan Al Mawaldi 20/11/2023 Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
This drawing has been reviewed for design and general arrangement only. Fax: +966 (11) 201 9859
A1 A2 A3 A4 A5 A5' The action indicated does not relieve the contractor from responsibility for
info@esolution-pt.com
www.esolution-pt.com
esolution construction & Engineering
full compliance with the Contract Documents and other working drawings. precast & Post tension concrete specialists
Contractor shall indicate on his submittal any deviation, if any, from Project Title
Contract Documents. BANK ALJAZIRA
The action indicated shall not vary the Contract Sum. RIYADH
Drawing Title
1-125 00
Drawing No
ES-PL-FP-GF-HZ-Z3
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
General Notes
600
AA
SPECIFICATIONS . THE CONTRACTOR SHALL
BA COORDINATE THESE DRAWINGS AND DOCUMENTS
AND REPORT IF ANY DISCREPANCY FOR
CLARIFICATION BEFORE PROCEEDING WITH THE
WORK INVOLVED .
COLUMN LEGEND:
BC
AC CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
REINFORCEMENT LEGEND:
BD
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AD
BE
600
600
600
600
AE
L.L=5.00 KN/m2
Design Consultant (logo)
GROUND FLOOR LOADING LAYOUT D.L=10.00 KN/m2
MASTER PLAN
ARABIAN CONSULTING ENGINEERING SERVICES
01 L.L=5.00 KN/m2
RegistrationNo.248 D.L=8.00 KN/m2 Programme / Programme Management Consultant
P.O.Box146,Riyadh L.L=5.00 KN/m2
D.L=2.00 KN/m2
A Approved L.L=5.00 KN/m2 Main Contractor
D.L=20.00 KN/m2
B Approved as Noted L.L=5.00 KN/m2
Posttension Contractor
C Resubmitted As Noted D.L=6.00 KN/m2 Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
L.L=5.00 KN/m2 Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
D Disapproved info@esolution-pt.com
D.L=12.00 KN/m2
www.esolution-pt.com
esolution construction & Engineering
precast & Post tension concrete specialists
BANK ALJAZIRA
Signature
RIYADH
Date LINE LOAD = 15 KN/M
Drawing Title
Hassan Al Mawaldi 20/11/2023
This drawing has been reviewed for design and general arrangement only.
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings.
This drawing was previously approved
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents.
( code B) on 06/11/2023 GROUND FLOOR
LOADING LAYOUT
The action indicated shall not vary the Contract Sum.
MASTER PLAN
1-300 00
Drawing No
ES-PL-FP-GF-LD-M
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
BC
BE
Main Contractor
BANK ALJAZIRA
A Approved
L.L=5.00 KN/m2 RIYADH
B Approved as Noted D.L=8.00 KN/m2 Drawing Title
This drawing has been reviewed for design and general arrangement only. D.L=12.00 KN/m2
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings.
This drawing was previously approved L.L=5.00 KN/m2
Designed
M.K
Drawn
M.S
Checked
M.A
1-125
Revision No
00
The action indicated shall not vary the Contract Sum. Drawing No
ES-PL-FP-GF-LD-Z1
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
600
L.L=5.00 KN/m2 ARE IN METERS UNLESS OTHERWISE INDICATED.
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
C Resubmitted As Noted
F No Action Taken
600
600
600
Programme / Programme Management Consultant
Signature Date
Hassan Al Mawaldi 20/11/2023
This drawing has been reviewed for design and general arrangement only. Main Contractor
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings.
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents.
The action indicated shall not vary the Contract Sum. Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
Project Title
BANK ALJAZIRA
RIYADH
Drawing Title
GROUND FLOOR
LOADING LAYOUT
( ZONE-02 )
1-125 00
Drawing No
ES-PL-FP-GF-LD-Z2
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
A1 A2 A3 A4 A5 A5'
General Notes
L.L=5.00 KN/m2
AB CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AC
ARABIAN CONSULTING ENGINEERING SERVICES
RegistrationNo.248
P.O.Box146,Riyadh
C Resubmitted As Noted
Design Consultant (logo)
AD D Disapproved
600
600
F No Action Taken
AE Programme / Programme Management Consultant
Signature Date
Hassan Al Mawaldi 20/11/2023
Main Contractor
This drawing has been reviewed for design and general arrangement only.
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings.
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents.
Posttension Contractor
The action indicated shall not vary the Contract Sum. Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
A1 A2 A3 A4 A5 A5' info@esolution-pt.com
www.esolution-pt.com
esolution construction & Engineering
precast & Post tension concrete specialists
Project Title
BANK ALJAZIRA
RIYADH
Drawing Title
1-125 00
Drawing No
ES-PL-FP-GF-LD-Z3
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
General Notes
A1 A2 A3 A4 A5 A5' A6 A7 A8 A9 A9' A10 A11 A12 A12' B1' B1 B2 B3 B4 B5 B6 B7 1- DO NOT SCALE FROM THIS DRAWING ONLY WRITTEN
DIMENSIONS SHOULD BE FOLLOWED . ALL EXISTING
DIMENSIONS TO BE CHECKED AT SITE PRIOR TO
COMMENCEMENT OF WORKS OR MANUFACTURING OF
COMPONENT.
600
600
AA ATTENTION OF THE ARCHITECT / ENGINEERS.
PS2 PS2 PS2 PS3
BA
3- ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS
ARE IN METERS UNLESS OTHERWISE INDICATED.
PS3
PS2
AC WORK INVOLVED .
PS2 PS2 PS2 PS2 PS2 PS6
COLUMN LEGEND:
AD
PS4
BE
600
600
600
600
AE PS5 CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
A1 A2 A3 A4 A5 A5' A6 A7 A8 A9 A9' A10 A11 A12 A12' B1' B1 B2 B3 B4 B5 B6 B7
ROWS
SETS
TYP.
90
ROWS
S
SETS ROWS
S
Main Contractor
S
S
S
TYP.
90
SETS
TYP.
90
Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
(TYPICAL SPACE OF STIRRUPS PERIMETER)
FOR INTERIOR COLUMN (TYPICAL SPACE OF STIRRUPS PERIMETER) Riyadh , Saudi Arabia
FOR CORNER COLUMN Tel: +966 (11) 201 9858
A A Fax: +966 (11) 201 9859
info@esolution-pt.com
SLAB THK
SLAB THK
PUNCHING REINFORCEMENT SCHEDULE www.esolution-pt.com
AS/PLAN
esolution construction & Engineering
50Ø 50Ø SHORT precast & Post tension concrete specialists
LONG DIRECTION
PUNCHING DIRECTION
ARABIANCONSULTINGENGINEERINGSERVICES MARK BAR SPACING NO. OF NO. OF BAR SPACING NO. OF NO. OF Project Title
SIZE (S) ROWS SETS SIZE (S) ROWS SETS
RegistrationNo.248 PS1 12 230 175 10 15 10 12 230 175 10 15 10 BANK ALJAZIRA
P.O.Box146,Riyadh AS SHOWN ON PLAN PS2 12 230 175 8 12 7 12 230 175 8 12 7
RIYADH
PS3 14 305 175 10 15 5 14 305 175 10 15 5
B Approved as Noted
C Resubmitted As Noted
-These drawings must be stamped by Esolution Company
D Disapproved
before construction, and this approval is considered GROUND FLOOR
ineffective without Esolution Company’s stamp REINFORCEMENT PLAN
F No Action Taken
-All levels and dimensions should be coordinated with MASTER PLAN
Signature Date
Hassan Al Mawaldi 20/11/2023 ARCH before the constructions.
This drawing has been reviewed for design and general arrangement only.
-All openings should be coordinated with ARCH & MEP Approved Seal Date
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings. before the constructions.
Contractor shall indicate on his submittal any deviation, if any, from Designed Drawn Checked
Contract Documents.
M.K M.S M.A
The action indicated shall not vary the Contract Sum.
Scale A1 (594x841) Revision No
1-300 00
Drawing No
ES-PL-FP-GF-RE-M
KEY PLAN
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
General Notes
COLUMN LEGEND:
PS6
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
BD
PS3
PS4
BE Revision No. Description Date
Revisions
Client
PS5
ARABIANCONSULTINGENGINEERINGSERVICES
RegistrationNo.248
P.O.Box146,Riyadh
-These drawings must be stamped by Esolution Company
Location of stair starter is before construction, and this approval is considered Programme / Programme Management Consultant
A Approved not matching with Arch. ineffective without Esolution Company’s stamp
A12 A12' B Approved as Noted B1' B1 B2 B3 B4 B5 B6 -All levels and dimensions
B7 should be coordinated with
Main Contractor
C Resubmitted As Noted
ARCH before the constructions.
D Disapproved
-All openings should be coordinated with ARCH & MEP
GROUND FLOOR REINFORCEMENT PLAN
01 ( ZOON-01 ) before the constructions.
F No Action Taken Posttension Contractor
Bahrain Tower,
King Fahed St , Olaia,
Signature Date Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
Hassan Al Mawaldi 20/11/2023 ROWS
Fax: +966 (11) 201 9859
info@esolution-pt.com
www.esolution-pt.com
esolution construction & Engineering
This drawing has been reviewed for design and general arrangement only. precast & Post tension concrete specialists
The action indicated does not relieve the contractor from responsibility for SETS
full compliance with the Contract Documents and other working drawings. Project Title
Contractor shall indicate on his submittal any deviation, if any, from BANK ALJAZIRA
TYP.
90
Contract Documents.
The action indicated shall not vary the Contract Sum. RIYADH
ROWS
S
SETS ROWS
S
S
S
S
TYP.
90
SETS
TYP.
90
GROUND FLOOR
(TYPICAL SPACE OF STIRRUPS PERIMETER)
(TYPICAL SPACE OF STIRRUPS PERIMETER)
REINFORCEMENT PLAN
FOR INTERIOR COLUMN
FOR CORNER COLUMN
A A ( ZOON-01 )
SLAB THK
SLAB THK
14
Scale A1 (594x841) Revision No
PS6 330 175 12 18 7 14 330 175 12 18 7
1-125 00
Drawing No
ES-PL-FP-GF-RE-Z1
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
AA AA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
General Notes
600
DIMENSIONS TO BE CHECKED AT SITE PRIOR TO
COMMENCEMENT OF WORKS OR MANUFACTURING OF
PS2 PS2 COMPONENT.
COLUMN LEGEND:
ARABIANCONSULTINGENGINEERINGSERVICES
RegistrationNo.248 CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
P.O.Box146,Riyadh
REINFORCEMENT LEGEND:
PS2
A Approved
PS2 PS2 PS2 TOP REINFORCEMENT
BOTTOM REINFORCEMENT
B Approved as Noted
C Resubmitted As Noted
D Disapproved
F No Action Taken
Signature Date
Hassan Al Mawaldi 20/11/2023
This drawing has been reviewed for design and general arrangement only.
The action indicated does not relieve the contractor from responsibility for
full compliance with the Contract Documents and other working drawings.
Contractor shall indicate on his submittal any deviation, if any, from
Contract Documents. 00 ISSUED FOR COORDINATION 2023-10-19
The action indicated shall not vary the Contract Sum. Revision No. Description Date
Revisions
Client
600
600
600
-These drawings must be stampedDesign
byConsultant
Esolution (logo)
Company
before construction, and this approval is considered
ineffective without Esolution Company’s stamp
-All levels and dimensions shouldProgramme
be coordinated with
/ Programme Management Consultant
ARCH before the constructions.
-All openings should be coordinated with ARCH & MEP
before the constructions. Main Contractor
BANK ALJAZIRA
TYP.
90
RIYADH
ROWS
S
SETS ROWS
S
S
S
S
TYP.
90
SETS
TYP.
90
GROUND FLOOR
(TYPICAL SPACE OF STIRRUPS PERIMETER)
(TYPICAL SPACE OF STIRRUPS PERIMETER)
REINFORCEMENT PLAN
FOR INTERIOR COLUMN
FOR CORNER COLUMN
A A ( ZOON-02 )
SLAB THK
SLAB THK
1-125 00
Drawing No
ES-PL-FP-GF-RE-Z2
KEY PLAN
A1 A2 A3 A4 A5 A5'
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
COLUMN LEGEND:
PS2
600
600
AE
Project Title
BANK ALJAZIRA
TYP.
90
RIYADH
ROWS
S
SETS ROWS
S
S
S
S
TYP.
90
SETS
TYP.
90
GROUND FLOOR
(TYPICAL SPACE OF STIRRUPS PERIMETER)
(TYPICAL SPACE OF STIRRUPS PERIMETER)
REINFORCEMENT PLAN
FOR INTERIOR COLUMN
FOR CORNER COLUMN
A A ( ZOON-03 )
SLAB THK
SLAB THK
14
Scale A1 (594x841) Revision No
PS6 330 175 12 18 7 14 330 175 12 18 7
1-125 00
Drawing No
ES-PL-FP-GF-RE-Z3
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
General Notes
600
AA
SPECIFICATIONS . THE CONTRACTOR SHALL
BA COORDINATE THESE DRAWINGS AND DOCUMENTS
AND REPORT IF ANY DISCREPANCY FOR
CLARIFICATION BEFORE PROCEEDING WITH THE
WORK INVOLVED .
COLUMN LEGEND:
BC
AC CONTINUD COLUMN STOP COLUMN PLANTED COLUMN
REINFORCEMENT LEGEND:
BD
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AD
BE
600
600
600
600
AE
Project Title
BANK ALJAZIRA
D Disapproved
RIYADH
-These drawings must be stamped by Esolution Company F No Action Taken
Drawing Title
1-300 00
Drawing No
ES-PL-FP-GF-VR-M
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
BC
BE
Main Contractor
Project Title
A Approved
BANK ALJAZIRA
RIYADH
B Approved as Noted
Drawing Title
ES-PL-FP-GF-VR-Z1
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'
B1 B2 B3 B4 B5 B6 B7
600
ARE IN METERS UNLESS OTHERWISE INDICATED.
COLUMN LEGEND:
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
600
600
Programme / Programme Management Consultant
Main Contractor
Posttension Contractor
Bahrain Tower,
ARABIAN CONSULTING ENGINEERING SERVICES King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
RegistrationNo.248 Fax: +966 (11) 201 9859
Project Title
BANK ALJAZIRA
A Approved RIYADH
Drawing Title
Disapproved
GROUND FLOOR
D
*℄ -These drawings must be stamped by Esolution Company VERTICAL TENDONS LAYOUT
℄
before construction, and this approval is considered F No Action Taken ( ZOON-02 )
ineffective without Esolution Company’s stamp
Signature Date
-All levels and dimensions should be coordinated with Hassan Al Mawaldi 20/11/2023
Approved Seal Date
Contractor shall indicate on his submittal any deviation, if any, from 1-125 00
Contract Documents. Drawing No
The action indicated shall not vary the Contract Sum. ES-PL-FP-GF-VR-Z2
KEY PLAN
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
AA AA
BA BA
DN
UP
BB BB
ZONE 1
AB AB
AC
ZONE 3 ZONE 2 BC
AC
BC
BD BD
BE
AD AD BE
AE AE
A1 A2 A3 A4 A5
A5' A6 A7 A8 A9
A9' A10 A11 A12
A12' B1'B1 B2 B3 B4 B5 B6 B7
A1 A2 A3 A4 A5 A5'
General Notes
COLUMN LEGEND:
REINFORCEMENT LEGEND:
TOP REINFORCEMENT
BOTTOM REINFORCEMENT
AC
AD P.O.Box146,Riyadh
600
600
AE A Approved Programme / Programme Management Consultant
B Approved as Noted
Main Contractor
C Resubmitted As Noted
D Disapproved
Posttension Contractor
F No Action Taken Bahrain Tower,
King Fahed St , Olaia,
Riyadh , Saudi Arabia
Tel: +966 (11) 201 9858
Fax: +966 (11) 201 9859
Project Title
This drawing has been reviewed for design and general arrangement only. BANK ALJAZIRA
The action indicated does not relieve the contractor from responsibility for RIYADH
full compliance with the Contract Documents and other working drawings. Drawing Title
Contractor shall indicate on his submittal any deviation, if any, from
GROUND FLOOR VERTICAL TENDONS LAYOUT Contract Documents.
( ZOON-03 ) The action indicated shall not vary the Contract Sum.
01
*℄ GROUND FLOOR
℄
-These drawings must be stamped by Esolution Company VERTICAL TENDONS LAYOUT
before construction, and this approval is considered ( ZOON-03 )
ineffective without Esolution Company’s stamp
-All levels and dimensions should be coordinated with Approved Seal Date
1-125 00
Drawing No
ES-PL-FP-GF-VR-Z3