TESTING:
1. Turn on the main switch on the operation panel and start up the seawater pump. Now the vacuum
will be established. Check that 95% vacuum is obtained in 10 to 15 minutes.
2. Stop the seawater pump. Now the vacuum shall maintain constant or drop off at max. 3-4% in 30
minutes.
4. Open the feed water valve. Now notice the feed water level in the sight glass. The level shall be
visible and constant in the upper half of the sight glass.
6. Look at the level indicating tube on the side of the freshwater bleeding tank. When the fresh
water level is visible.
8. Open slowly the freshwater outlet valve. The pressure will now decrease. Stop opening the
valve at a pressure at 1-1.5 bar.
Now the freshwater production is running.
9. Have a look at the sight glass and readjust the Feed water valve at a level visible in the upper
part of the glass. The feed water valve should be opened totally during production and the capacity
of feed water should be regulated by the dimension of the feed water nozzle.
As long as the actual fresh water salt content is higher than the set-point ( 10 ppm ) the freshwater
is dumped out through the solinoid valve.
Heating water: Temperature Drop between inlet and outlet from evaporator: Max. 12-15 degC.
10 m3/h
Please go through carefully the above mentioned points, and the freshwater production will
be o.k.
Starting up Report
Nom.
value
Date
Time
Water clock m3
Capacity sek/10l
Capacity m3 /24h
Salinity ppm
Pressure FW Bar
Pressure before ejector Bar
Pressure after ejector Bar
o
Shell temp. C
o
Seawater inlet temp. C
o
Seawater outlet temp. C
o
Heat water inlet temp. C
o
Heat water outlet temp. C
Vacuum %
Remarks: