Provision of 4x4 Pick Up Type Service

A.1.1(2) Vehicle for the Engineer on Bare (Rental Provision of 4x4 Pick Up Type Service Vehicle for t
Provisio of CombinedBasis)
Field Office, Provisio of Combined Field Office, Laboratory and
A.1.1(5) Laboratory and Living Quarters, Building
for the Engineer (Rental Basis) 0
B.5 Project Billboard/Sign Board Project Billboard/Sign Board
B.7(2) Occupational Safety and Health Program lumpsum ### Occupational Safety and Health Program
B.8(2) Traffic Management lumpsum 90,209.70 Traffic Management
B.9 Mobilization/Demobilization lumpsum ### Mobilization/Demobilization
102(2) Surplus Common Excavation cu.m. 228.54
102(3)a Surplus Rock Excavation (Soft) cu.m. 153.13
102(3)b Surplus Rock Excavation (Hard) cu.m. 1,679.70
103(1)a Structure Excavation (Common Soil) cu.m. 182.23
103(1)b Structure Excavation (Soft Rock) cu.m. 335.79
103(3) Foundation Fill cu.m. 506.60
103(6)a Pipe Culverts and Drain Excavation cu.m. 323.65
104(1)a Embankment from Roadway Excavation cu.m. 150.41
105 (1)a Subgrade Preparation (common material) sq.m. 16.51
200(1) Aggregate Subbase Course cu.m. 622.38
Portland Cement Concrete Pavement
311(1)c1 sq.m. 1,358.02
(Unreinforced)
Portland - 0.23 mPavement
Cement Concrete thick
311(1)e1 sq.m. 1,518.12
(Unreinforced) - 0.28 m thick
404(1)a Reinforcing Steel, Grade 40 kgs 65.09
404(1)b Reinforcing Steel, Grade 60 kgs 65.16
Structural Concrete (Class A, 20.68 Mpa, 28
405(1)a3 cu.m. 4,968.36
days)
407(8) Lean Concrete (16.5 Mpa, Class B) cu.m. 5,500.22
414(1) Formworks and Falseworks lumpsum ###
500(1)a3 Pipe culverts (910mm dia, Class 11 RCPC) ln.m 6,376.62
506(1) Stone Masonry cu.m. 3,350.91
517(1)b Drain Pipe (PVC) ln.m 157.71
600(7) Curb and Gutter (Precast) each 3,841.87
605(1)c1 Warning Signs each 4,909.28
Hazard Markers, Chevron Signs
605(6)e2 each 4,074.30
(600mmx800mm)
ReflecterizedThermoplastic
612(1) sq.m. 1,090.49
PavemenMarkings (White)
ReflecterizedThermoplastic
612(2) sq.m. 1,166.59
PavemenMarkings (Yellow)
TOTAL
Up Type Service Vehicle for the Engineer on Bare (Rental Basis)
d Field Office, Laboratory and Living Quarters, Building for the Engineer (Rental Basis)

and Health Program #VALUE!


-
#VALUE!
-

-
Err:509
106.00
#NAME?
#NAME?
-
-
-
-
8+087
Err:509
0.29
Err:509
Err:509
#VALUE!
#NAME?

Err:509
Err:509
-
Date:

To: PBO CONSTRUCTION

Project: 22PB0009

SCOPE OF WORK QTY UNIT UNIT PRICE TOTAL COST


B.7(2) Occupational Safety and Health Program 0.33 lumpsum 214,899.57 71,633.19
B.8(2) Traffic Management 0.33 lumpsum 90,209.70 30,069.90
B.9 Mobilization/Demobilization 0.33 lumpsum 196,068.60 65,356.20
102(2) Surplus Common Excavation 3,155.31 cu.m. 228.54 721,115.46
102(3)a Surplus Rock Excavation (Soft) - cu.m. 153.13 -
102(3)b Surplus Rock Excavation (Hard) 449.81 cu.m. 1,679.70 755,550.90
103(1)a Structure Excavation (Common Soil) 185.02 cu.m. 182.23 33,715.28
103(1)b Structure Excavation (Soft Rock) 9.28 cu.m. 335.79 3,116.13
103(3) Foundation Fill 10.60 cu.m. 506.60 5,368.69
103(6)a Pipe Culverts and Drain Excavation 59.59 cu.m. 323.65 19,286.95
104(1)a Embankment from Roadway Excavation 110.85 cu.m. 150.41 16,672.20
105 (1)a Subgrade Preparation (common material) 4,810.47 sq.m. 16.51 79,420.79
200(1) Aggregate Subbase Course 721.57 cu.m. 622.38 449,090.67
311(1)c1 Portland Cement Concrete Pavement (Unreinforced) - 0.23 m thick 1,308.46 sq.m. 1,358.02 1,776,915.60
311(1)e1 Portland Cement Concrete Pavement (Unreinforced) - 0.28 m thick 3,179.95 sq.m. 1,518.12 4,827,551.77
404(1)a Reinforcing Steel, Grade 40 6,548.60 kgs 65.09 426,248.69
404(1)b Reinforcing Steel, Grade 60 826.45 kgs 65.16 53,851.39
405(1)a3 Structural Concrete (Class A, 20.68 Mpa, 28 days) 130.23 cu.m. 4,968.36 647,039.51
407(8) Lean Concrete (16.5 Mpa, Class B) 3.91 cu.m. 5,500.22 21,505.86
414(1) Formworks and Falseworks 0.33 lumpsum 1,216,566.54 406,342.01
500(1)a3 Pipe culverts (910mm dia, Class 11 RCPC) 24.00 ln.m 6,376.62 153,038.88
506(1) Stone Masonry 279.18 cu.m. 3,350.91 935,507.05
517(1)b Drain Pipe (PVC) 10.80 ln.m 157.71 1,703.27
600(7) Curb and Gutter (Precast) 339.42 each 3,841.87 1,304,007.52
605(1)c1 Warning Signs 4.00 each 4,909.28 19,637.12
GROSS AMOUNT 12,823,745.02