RA-05 - Brick Work
RA-05 - Brick Work
RA-05 - Brick Work
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: Brick Work HIRA No: 0
Assessment team:
Risk Assessment
Risk Matrix
Fatal 5 M M H H H
Impact Rating
Hospitalization Case 4 L M M H H
1 2 3 4 5
Probability Rating
Unlikely
Inevitable
Most Unlikely
Likely
Most Likely
Risk Level = Probability x
Impact Rating
Legend
Page 1 of 4
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: Brick Work HIRA No: 0
Assessment team:
Rating (P)
Risk Level
Rating (I)
Action by
Residual
Impact
(IxP)
Prob.
S.
Risk
Activity Hazard / Risk Risk Controls Required
No.
1 Shifting and 1. Slip, trip & fall 3 4 M The work area shall be kept clean and free from obstacles, projected
staging of during sharp materials to prevent slip, trip & fall.
brick. material Brick stack should not be done more the 1.2 mtr/4 feet.
handling. As much as possible avoid head transportation of brick.
2. Fall of Trained & Skilled persons shall be deployed.
material Job specific PPEs shall be used during the job (Goggles / rubber gloves)
(Brick) Work shall be done under proper Supervision.
3. Heat related Rest shelter & drinking water shall be provided
illness. Ensure PTW before start the work.
Site Engineer
Proper arrangement for person to work & materials storing.
Low Risk
2 Lying of 1. Collapse of 4 3 M Safe mean of approach shall be provided to work front.
bricks below soil. Use gunny begs during plastering to avoid soil contamination
the Ground 2. Soil Area housekeeping to be maintained.
level up to contamination Loose materials shall not be stacked in the edge of excavated area.
1mtr. 3. Personal Trained & Skilled persons shall be deployed.
injury. Use rubber hand gloves for plastering purpose.
4. Heat related Job specific PPEs shall be used during the job
illness. Work shall be done under proper Supervision.
Rest shelter & drinking water shall be provided
Ensure workmen aware about MSDS of chemical
Page 2 of 4
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: Brick Work HIRA No: 0
Assessment team:
Rating (P)
Risk Level
Rating (I)
Action by
Residual
Impact
(IxP)
Prob.
S.
Risk
Activity Hazard / Risk Risk Controls Required
No.
3 Lying of 1. Fall from 5 2 M Job specific working platform with fall protection measures shall be
bricks above height. ensured prior to engage the crew in height work.
the Ground 2. Collapse of Use gunny begs during plastering to avoid soil contamination.
level up to 3 wall. Verticality of wall to be maintained.
mtrs. 3. Soil Trained & Skilled persons shall be deployed.
contamination Thoroughly wash the exposed body with water.
4. Hazardous Use rubber hand gloves for plastering purpose.
material Job specific PPEs shall be used during the job
contact with Work shall be done under proper Supervision.
skin/Contact Rest shelter & drinking water shall be provided
with eyes. Job specific TBT & Training shall be provided to the working person
5. Heat related
illness.
4 Curing of 1. Slip, trip & 3 3 M Water logging/ slippery surface shall be avoided in work locations.
brickwork fall. The work area shall be kept clean and free from obstacles, projected
2. Personal sharp materials.
injury. Regular housekeeping to be maintained
Site Engineer
Low Risk
3. Heat related Rest shelter & drinking water shall be provided
illness. Follow permit system before start the job & Ensure proper illumination
during work.
Page 3 of 4
RISK ASSESSMENT MSP- Rev-00
Name of the jobsite: TCPL-Green Energy Source Private Limited, Jamshedpur. Date:
Name of the main activity: Brick Work HIRA No: 0
Assessment team:
Prepared by: Grant Enterprises Reviewed by: JLL Approved by: TGESPL/JLL