Download as pdf
Download as pdf
You are on page 1of 3
AR ees _ ¢ E. Mobile : 98270 34880 SD caterers cea E-mail : sunilogarg@gmail.com Govt. Regd. Valuer & Chartered Engineer Format — 14 NGINEER'S CERTIFICAT! (FOR THE PURPOSE OF REGISTRATION OF NEW PROJECT Under RERA) Information as on Certificate No: CER/RERA/20-21/271 'ssue Date: 08-03-2021 PROJECT NAME: SAATVIK VIHAR PHASE II ADDRESS: Khasra No. 110, 111, 112/1,112/2,165/1,165/2,165/3,/165/4,172 of Village Mangliya, Teh ‘Sawer, Distt. Indore PROMOTER NAME: RUCHI REALTY PRIVATE LIMITED ‘Address: 170/10, FILM COLONY, RNT MARG, INDORE-452001, This is to certify that! have undertaken assignment of Serve estimated cost and expenses incurred on actual on ‘ite construction for the Realestate project mentioned above, (i) Shri Amit Agrawal as Architect; {it M/s NV Bhale & Associates as MEP Consultant; i) Shri Deepak Kothari as Quantity Surveyor Tables A and B). 6. | certify that the cost of civil, as given in Table A and 8 below: 199-B, Tilak Nagar Extension, AR 5 ieee on ere eee « .S.LA., AM.LE.) ees E-mail : sunilogarg@gmail.com Govt. Regd. Valuer & Chartered Engineer TABLE A Building/Wing/Tower bearing Number- Not Applicable since Plotted Development Project {To be prepared separately for each Building/Wing of Real Estate Project/ Phases. In case of more than one building/ label as Table-A1, A2, a3 etc.) S.No, Particulars “Amount in Lakh + | Total Estimated cost of the Bulling/ Wing as on date of bulding permission Wow Competent] Rs Authority. (based on the original Estimated cost) Cost incurred on Additional Extra tems not included inthe Estimated Cost (Ann@wure A) | Rs tresnclone in percentage (as percentage of estimated cost plus additional] Extra items) 9% (a*100/(245) (Enclose separate sheets for the cost calculations for each ‘unit/building or tower) 2 | Costincurred as on Date (based on the actual cost incurred as por records) Rs 3 _| Value of Work done in Percentage (as percentage ofthe estimated cost (1*100/2) % 4 | Balance Cost tobe incurred (Based on estimated cost) (1-2) Rs 5 é TABLE B {nternal & External Development work and common amenities (To be prepared forthe entire registered phase of the Real Estate Project) S.No) Particulars ‘Amount in Lakh 1" | Total Estimated cost of the internal and External Development Wore including Rs. 1040.12 tac common amenities and facilities in the layout as on date of Permission from Competent Authority. (based on the original Estimated cost) 2 | Costincurred as on Date (based on the actual cost incurred as por records) RS-NIL 3 | Work done in Percentage (as percentage of the estimated cost (1*100/2) 0.00% 4 | Balance Cost to be incurred (Based on estimated cost] (7-3) Rs. 1040.12 Lae 5_| Cost incurred on Addtional/ Extra items not induded in the Exiled Con Rs-NIL & | Work done in percentage (as percentage of estimated cost plus ‘additional/ Extra 0.00% Items) (1*100)/(245) [Enclose separate sheet for the cost calculations) TABLE ~ C (item wise detailed physical status) [S.No ~Teems Particulars Current Physical Status Percent completion 5 of item (94) Not Started O% 1_[Concrete/Blacktop road Not Started 0% 2_Storm water drains Not Started % 3_Mater storage tank (OHT and Sump) Not Started % 4 Water supply pipeline 199-B, Tilak Nagar Extension, SUNIL GARG OF esl e7 0 (B.E., FIV, FLLLS.LA, AM.LE,) Govt. Regd. Valuer & Chartered Engineer iz IE Not Started 0% 5_fexternal electrification Not Started o% 6 Streetlight and electric poles ‘Not Started 0% 7_ Sewage disposal STP /septic tank Not Started 0% 8_park Development Not Started 0% 9_ Playground * bther amenities, as promieg, Net starre oe (a)Entrance gate and Boundary wall (b)Club house / community hal es A ellos ete ee he Bech eben red cans ty Signature & Engineer Name- Sunil Garg ‘Address- 199 B Tilak Naga} ‘Mobile Number(s) - 9827034 (Uicense Number or Authority: (AM/ 80507/9) Note: 1. The Scope of work is to complete entire Real Estate Project as per drawings approved from time to time to obtain ‘occupation Certificate/Completion Certificate. 2, Quantity survey can be done by office of engineer or can be done by independence Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. Please indicate name of the Quantity Surveyer ‘and for whom he is working, 3. The estimated cost includes all labor, material, fagement and machinery required to carry out entire work including common facilites, but does not include marketing/advertising cost, salaries not drecty attributable tothe Project, and loan/interest repayment to financial institution, 4 Annexure A and B attach the list of Extra/additional items executed if any with cost (which were not part of the Original estimate ofthe total cost) and justification for the same, 5 Refer Guldeline for Designated account document available in DOWNLOAD section of RERA website,

You might also like