Professional Documents
Culture Documents
Time & Work Type - 10 - 13817851
Time & Work Type - 10 - 13817851
10
TYPE
1. 50 men can complete a work in 28 days. They 4. 33 man complete a work in 30 days. If 44 man
started the work together, but at the end of started the work and every day one man left
each 10th day, 10 men left the job. The work day-by-day then minimum how many days are
was completed in how many days? required for completion of work ?
50 28 33 30 44
10 10
1 2
(A) 56 (B) 56
3 3
(C)
1 (A) 30 (B) 25
(D) 46
3 (C) 38 (D) 40
3. A group of men decided to do a job in 8 days. 6. 150 men undertake a work to do in some days.
But since 10 men dropped out every day, the If after everyday 4 men leave the work then
job got completed at the end of the 12th day. work will be completed in 8 more days than
How many men were there at the beginning? before. Then find the number of days in which
8 work has to be completed intially?
10 150
12 4
(CAT Previous Year) 8
(a) 165
(b) 175 (A) 32 days/ (B) 18 days/
(c) 80
(C) 17 days/ (D) 21 days/
(d) 90
1 7
(A) 39 hours (B) 42 hours
(A) 8 days / (B) 9 days/ 13 13
(C) 10 days/ (D) 11 days/ 7
(C) 43 hours (D) 44 hours
13
2 HEAD OFFICE : J-7, Himmat Nagar, In front of BIG Bazar, Gopalpura Pulia, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org
Mother's Arithmetic • Time & Work
Solutions
1. (C) Total work = 50 × 28 = 1400 33 × 60 = n [89 – n]
First 10 days work done by 50 people n = 44
= 50× 10 = 500 work get completed in 44 days.
Second 10 days work done by 40 people 5. (B) Let now work was completed in x days
= 40 × 10 = 400 m is efficiency of each man
Third10 days work done by 30 people So, Total work = 150 × m × (x – 8)
= 30 × 10 = 300 150 × m × (x – 8) = 150 × m + 146 × m + 142 × m
Fourth 10 days work done by 20 people + ......... (x days)
= 20 × 10 = 200
x
Total = 1400 150 × m × (x – 8) = m × [2 × 150 + (x – 1) (–4)]
2
The work complete in = 40 days
150x – 1200 = 150x – 2x2 + 2x
2. (B) Total Work - 40 × 40 = 1600 units
x2 – x – 600 = 0
First 10 day's work - 40 × 10 = 400 units (x – 25) (x + 24) = 0
IInd 10 day's work - 35 × 10 = 350 units (x 24 because time can't be negative)
IIIrd 10 day's work - 30 × 10 = 300 units x = 25 days
IVth 10 day's work- 25 × 10 units
Vth 10 day's work - 20 × 10 = 200 units 6. (C) Let intially work to be done in (n – 8) days
50 day's work = (400 + 350 + 300 + 250 + Total work will be equal
200) = 1500 units 150 (n – 8) = 150 + 146 + 142 ..... + n
Remaining work = (1600 – 1500) = 100 units
n
Remaining people = 15 150 (n – 8) = [2 × 150 + (n – 1) (–4)]
2
100 2
So, time = = 6 days n
15 3 150 (n – 8) = [300 – 4n + 4]
2
2 2
Total time = 50 6 = 56 days n
3 3 150 (n – 8) = [304 – 4n]
2
3. (A) let there are X men in the group initially. n = 25
So, Total work = 8x
n – 8 = 17
8x = x + (x – 10) + (x – 20) ...+(x–110)
So, required time = 17 days
8x = 12x – 660
7. (B) Let there were n workers on a job
4x = 660
Let limit of work is done by one worker in
x = 165 men
one day.
4. (B) Let work get completed in n days
Work done on 1st day = n × 1 = n
total work = 33 × 30 Work done on 2nd day = (n – 1) × 1 = n – 1
N
sum of N terms = 2a n 1 d 2n
2 n + (n – 1) + ......... 2 + 1 = n ×
3
33 × 30 = (44 + 43 + 42 ....n term)
n n 1 2n²
N =
33 × 30 = [2 × 44 + (n – 1) (–1)] 2 3
2
3n + 3 = 4n
33 × 60 = n [88 – n + 1] n=3
Jaipur • Gopalpura • Lalkothi • Jhotwara • Ambabari • Alwar • Udaipur 3
Mother's •
8. (D) 25 × 60 = 25 × x + 15 × (80 – x) 11.(A) 6M + 2B = 10 days ....(i)
25 × 60 = 25x + 1200 – 15x and 26M + 48 B = 2 days ...(ii)
300 = 10x 15M + 20 B = ?
x = 30 Here, M 1D 1 = M 2D 2
9. (C) Let now total work got completed in x days × 10 = (26M + 48M) × 2
m is efficiency of each man 60M + 80 B = 52M + 96B 8M = 16B
Total work = 50 × m M = 2B
50 × m = m + 2m + 3m + ........ (x days) Now, in Eq. (i), put M = 2B
6 × 2B + 8B = 10 days
x x 1 12B + 8B = 10 days
50 × m = m 2 So, 20 B work finish in 10 days.
Then, 15M + 20B = 15 × 2B + 20B
x2 + x – 100 = 0
= 30B + 20B = 50B
1 1 400 Now, M 1D 1 = M 2D 2
x= = 10 days
2 20 × 10 = 50 × D2
20 10
1 D2 = D2 =4 days
10. (C) 24 girls do th of project in 4 days. 50
9
12. (C)
24 girls will do 1 work in 36 days.
Again, remaining work
1 1
=1–
9 3
9 1 3 5
=
9 9
5 20
(24 girls + 30 boys) do work in
9 3
days.
(24 girls + 30 boys) will do 1 work in
20 9
= 12 days.
3 5
One day's work of 30 boys
1 1
=
12 36
3 1 2 1
=
36 36 18
Required time = 18 days
4 HEAD OFFICE : J-7, Himmat Nagar, In front of BIG Bazar, Gopalpura Pulia, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org