Time & Work Type - 3 - 13604591

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Maths • Time & Work

3
TYPE

31 7
2 person work (A)
18
(B) 4
18
A = x, B = y, A/B left the work after
some time. Find the remaining work 37 41
(C) (D)
completed? 18 18

1. Amir and Akbar can finish a task in 30 days and 15 (B)efficiency


days respectively. Akbar worked on the task for 8 Total work = 49.5
days and left the job. In how many days can Amir Amit — 5.5 — 9
alone finish the remaining work ? Punit — 9.9 — 5
30 15 Punit’s 2 days work = 5 × 2 = 10
8 Remaining work = 49.5 – 10 = 39.5

39.5 7
Time taken by Amit = = 4
(A) 14 days/ (B) 15 days/ 9 18

(C) 16 days/ (D) 17 days/ 3. A can complete some work in 35 days and B
can complete the same work in 15 days. They
(A) Amir 30 worked together for 8 days, then B left the
1
30 = Total Work
work. In how many days will A alone complete
60% of the remaining work?
Akbar 15 2
A, 35 B
Akbar worked for 8 days = 2 × 8 = 16 units 15 8
B A 60%
Left Work = 30 – 16 = 14
(CPO 24-10-2020 Shift II)
14 (A) 15 (B) 10
Remaining work done by Amir = = 14 days
1 (C) 5 (D) 8

2. Amit can complete a work in 5.5 days and A 35 3


(C) 105
Punit can complete the same work in 9.9 days. B 15 7
Punit alone worked at it for 2 days and then
8 day work of A + B = (7 + 3) 8 = 80
left the work. In how many days will Amit alone
Remaining work = 105 – 80 = 25
complete the remaining work?
5.5 60
60% of remaining work = 25 × = 15
100
9.9 2
15
Time = = 5 days
3

Study Center : Jaipur • Gopalpura • Lalkothi • Jhotwara • Ambabari • Alwar • Udaipur 1


Mother's Maths

110 120
2 person work (A)
13
(B)
13
A + B = x, B = y.
A/B left work after. Find the remain- 130 121
(C) (D)
ing work of A/B = ? 11 13
4. A and B together can complete a work in 20 2
5. (B) A and B together complete work = 6 day
days. They started together but after 4 days A 3
left the work. The remaining work was com- 5 3 3
pleted by B alone in 24 more days. In how A and B, 10 day complete work = =
20 4
many days can A complete the entire work
alone? 3 1
Remaining work = 1 – =
4 4
A B
A 1
Work complete by B = 6 days
4
B A
4
B complete work = 6 × = 24
(A)75 (B)25 1
(C)45 (D)60
A Complete work
4. (D) A and B together complete a work = 20 days
A and B together work 4 days 3 1 13 120
= – = = days
20 24 120 13
4 1
=
20 5
3 person work
1 4
Remaining work = 1 – A = x, B = y, C = z. A/B/C left work
5 5
after. Find the remaining work of A/
4 B/C = ?
B work Part = 24 days
5 6. A, B and C, alone can do a piece of work in 9,
B alone complete whole work = 30 days 12 and 18 days respectively. They all started
LCM the work together, but A left after 3 days. In
3 A+B 20
60 how many days, was the remaining work com-
6 B 30
pleted?
60 A, B C 9, 12 18
A complete work = = 60 days
1 3
5. A and B together can complete a work in A
2 5 11 4
6 day. They started together but after 5 days (A) 2 (B) (C) (D) 1
3 2 4 5
A left the work and the work is completed by (D) A 9 4
B after 6 more days. A alone can complete the B 12 3 36
entire work in how many days? C 18 2
2
A B 6 All work together for 3 days
3 = (4 + 3 + 2) × 3 = 27
5 A
Remaining work = 36 – 27 = 9 next day
B 6 A
9 4
Time = = 1 days
5 5

2 HEAD OFFICE : 201, Himmat Nagar, Gopalpura Mode, Tonk Road, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org
Maths • Time & Work
3 1 1
7. A, B and C can do job in 3 , 2 and 7 (C) A+B 10 6
4 7 2 4 60
days respectively if they worked alone. A B+C 15 3
1 C+A 20
leaves after they have worked together for
2
days. In how many days can B and C do the 13 1
(A + B + C) = ,C=
rest of the job? 2 2
A, B C
3 1 1 1 13
3 ,2 7 (A + B + C)8 = 8 52
4 7 2 2 2
A B C 8
Remaining by CTime = 1 / 2 = 16 days

17 11 13 9. A and B, working together, can complete a work


(A) (B) (C) (D) 6 1
18 18 18 in 8 days, C and A together can complete it
(A)Eff. (unit) 3
15 2
4 A — in 16 days, B and C together can complete it
4 3
15 1
7 B — in 12 days. They worked together for 3 days
7 2
15 after that A & C quit. In how many days will B
2 C — alone complete the remaining work ?
2
Total work = 15 units 1
A B 8
1 1 3
days work = × (4 + 7 + 2) = 6.5 2
2 2
C A 16
Remaining work = 15 – 6.5 = 8.5 3
8.5 17 1
B + C can do the work = = B C 12 3
9 18 2
A C
3 person work B
A + B = x, B + C = y, C + A = z, A/B left
111 5 119
work after. Find the remaining work (A) (B) 8 (C) (D) 32
17 7 17
of A/B = ?
8. A and B together can do a piece of work in 10
days. B and C together can do it in 15 days (B) A + B 81 12
3
while C and A together can do it in 20 days. C+A 16 2 6
100
They work together for 8 days and A & B left 3 8
the work. C alone will complete the remaining B+C 12 1
2
work in :
A B 10 B
26
C C A (A + B + C) = ,C=1
ODW 2
8
A B C (A + B + C) 12
= 13 × 3 = 39
Remaining work = 100 – 39 = 61
1 61 5
(A) 12 days (B) 3 days
5 No. of days taken by C = = 8
7 7
1
(C) 16 days (D) 5 days
3

Study Center : Jaipur • Gopalpura • Lalkothi • Jhotwara • Ambabari • Alwar • Udaipur 3


Mother's Maths
1
10. A can do 20% of a work in 4 days, B can do 33 of the
3
same work in 10 days. They worked together for 9
days. C completed the remaining work in 6 days. B
and C together will complete 75% of the same work
in :
A 20% 4 B
1
33 10 9
3
C 6 B C
75%
(CGL Mains 2019)
(A) 12 days/ (B) 15 days/
(C) 10 days/ (D) 9 days/

(C)

A + B for 9 days = 5 × 9 = 45
Remaing work = 60 – 45 = 15
15 5
C efficency = =
6 2

5 9
B + C = 2+ =
2 2
B + C = 75% of total work
75
60× = 45
100

45 2
B completed work =
9
= 10 days

4 HEAD OFFICE : 201, Himmat Nagar, Gopalpura Mode, Tonk Road, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org

You might also like