Professional Documents
Culture Documents
Time & Work Type - 3 - 13604591
Time & Work Type - 3 - 13604591
Time & Work Type - 3 - 13604591
3
TYPE
31 7
2 person work (A)
18
(B) 4
18
A = x, B = y, A/B left the work after
some time. Find the remaining work 37 41
(C) (D)
completed? 18 18
39.5 7
Time taken by Amit = = 4
(A) 14 days/ (B) 15 days/ 9 18
(C) 16 days/ (D) 17 days/ 3. A can complete some work in 35 days and B
can complete the same work in 15 days. They
(A) Amir 30 worked together for 8 days, then B left the
1
30 = Total Work
work. In how many days will A alone complete
60% of the remaining work?
Akbar 15 2
A, 35 B
Akbar worked for 8 days = 2 × 8 = 16 units 15 8
B A 60%
Left Work = 30 – 16 = 14
(CPO 24-10-2020 Shift II)
14 (A) 15 (B) 10
Remaining work done by Amir = = 14 days
1 (C) 5 (D) 8
110 120
2 person work (A)
13
(B)
13
A + B = x, B = y.
A/B left work after. Find the remain- 130 121
(C) (D)
ing work of A/B = ? 11 13
4. A and B together can complete a work in 20 2
5. (B) A and B together complete work = 6 day
days. They started together but after 4 days A 3
left the work. The remaining work was com- 5 3 3
pleted by B alone in 24 more days. In how A and B, 10 day complete work = =
20 4
many days can A complete the entire work
alone? 3 1
Remaining work = 1 – =
4 4
A B
A 1
Work complete by B = 6 days
4
B A
4
B complete work = 6 × = 24
(A)75 (B)25 1
(C)45 (D)60
A Complete work
4. (D) A and B together complete a work = 20 days
A and B together work 4 days 3 1 13 120
= – = = days
20 24 120 13
4 1
=
20 5
3 person work
1 4
Remaining work = 1 – A = x, B = y, C = z. A/B/C left work
5 5
after. Find the remaining work of A/
4 B/C = ?
B work Part = 24 days
5 6. A, B and C, alone can do a piece of work in 9,
B alone complete whole work = 30 days 12 and 18 days respectively. They all started
LCM the work together, but A left after 3 days. In
3 A+B 20
60 how many days, was the remaining work com-
6 B 30
pleted?
60 A, B C 9, 12 18
A complete work = = 60 days
1 3
5. A and B together can complete a work in A
2 5 11 4
6 day. They started together but after 5 days (A) 2 (B) (C) (D) 1
3 2 4 5
A left the work and the work is completed by (D) A 9 4
B after 6 more days. A alone can complete the B 12 3 36
entire work in how many days? C 18 2
2
A B 6 All work together for 3 days
3 = (4 + 3 + 2) × 3 = 27
5 A
Remaining work = 36 – 27 = 9 next day
B 6 A
9 4
Time = = 1 days
5 5
2 HEAD OFFICE : 201, Himmat Nagar, Gopalpura Mode, Tonk Road, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org
Maths • Time & Work
3 1 1
7. A, B and C can do job in 3 , 2 and 7 (C) A+B 10 6
4 7 2 4 60
days respectively if they worked alone. A B+C 15 3
1 C+A 20
leaves after they have worked together for
2
days. In how many days can B and C do the 13 1
(A + B + C) = ,C=
rest of the job? 2 2
A, B C
3 1 1 1 13
3 ,2 7 (A + B + C)8 = 8 52
4 7 2 2 2
A B C 8
Remaining by CTime = 1 / 2 = 16 days
(C)
A + B for 9 days = 5 × 9 = 45
Remaing work = 60 – 45 = 15
15 5
C efficency = =
6 2
5 9
B + C = 2+ =
2 2
B + C = 75% of total work
75
60× = 45
100
45 2
B completed work =
9
= 10 days
4 HEAD OFFICE : 201, Himmat Nagar, Gopalpura Mode, Tonk Road, Jaipur-302018
0141-2711689, +91-7073909991 | www.motherseducationhub.org