Waiting Room (Recovered)
Waiting Room (Recovered)
Plaster
Paint
80mm
PCC
Pipe
1.00 20.00 = 20.00 Rmt
20.00
41.004
44101.85
0
Outer P.W. 412 e
Division - Executive Engineer,P.W.Division,No.1,Gondia
Sub Division:P.W.Sub-Division.Tirora
FORM-46 (P.W.412)
3rd and Final Bill
FOR
Name of contractor / piece -work Supplier- Mahatma Jyotiba Fuley Mazoor Kamgar sanstha
M.B.No. 5627
Page No. 66 to 76 Name of work :-
Construction of Waiting Room for Outpatients Relatives At
sub district hospital tirora Tirora
Allocation: 8443
Rs. 390358.00
Clerk Accountant
Audited. Reviewed
Checked
Superintendent
Auditor Gazetted officer
Sub-Division P W Sub-Division
Tirora
FORM-47
Name of Work :-
Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora
Allocation:- 8443 Tirora
Ch. To :- Construction of Waiting Room for Outpatients Serial No. of this Bill 3rd and Final Bill
Relatives At sub district hospital tirora Tirora
No. and date of Prevous Bill for this work
Accepted by
Total Total value of work done up to date (A)----------------------------------------- 1615104.00 1283961.00 331143.00
Deduct value of work below 0.1%------ --------------------------------- -1615.00 -1284.00 -331.00
Net value of work since previous bill( E ) Figure ( F) in words --------- 1613489.00 1282677.00 330812.00
Add GST 18 % ---------------------------------------------------------------------- 237608.00 178062.00 59546.00
Net value of work done ----------------------------------------------------------- 1851097.00 1460739.00 390358.00
390358.00
1
Figure ( D) in words Rupees Rupees three lakhs ninety thousand three hundred fifty-eight and paise nil only
Entries in columns 4 to 9 of part 1 are based on measurements recorded by Shri.A.K. Khandalkar J.E. on ……………. in M Book
No. 5507 / Page No.57 to 67 & 5627 / Page No.65 to 76 and checked 100 % by Shri.A.D.RAHANGDALE., Tirora, Tirora on
2 ] Certified ( I ) that in addation to and quite apart from the quantities of work actually 3] Certified ( I ) that plus quantities of materials shown in column 3 of part ll above
exucuted as shown in coloumn 4 of part I some work has ben actually done in conection with have ben actually brought by the contractor to the site of the work and the contractor has not
several items and value of such works [ after deducting there from the proproniate previously received any advance on there security ( ll ) that these materials are of an
amount of secured advance if any ultimately recoverable on acount of the quantities of imperishable nature and are all required by the contractor for use in the work in connection
materials used there in ] is in no case less than the advance payment Asa per coloumn 3 of part with item for which rates for finished work have ben agred upon and ( iii ) that a formal
1 made or proposed to be made for the convevenience of the contractor in anticipation of and agreement in form 50 signed and executed by the contractor in acordance with
subject to results of detailed measurements which will be made as soon as possible. paragraph 10-2-19 of the M P W A Code is recorded in the divisional office.
Dated signature of the contractor Dated signature of officer preparing the bill
* This signature is necessary only when the officer preparing Dated signature of officer authorising payment
the bill is not the officer authorising payment
Figures for Rs
work abstract
Rs ( a) from previous bill as per last …
running account bill 5
( b) from this bill …
Total 5 ( b ) + 8 ( a) (G)
c By cheque
Total 8 ( b ) + ( c) (H)
* Here specify the net amount payble ( item 8 ( c) Dated intials of the disbursing officer
Part V - Remarks
( This space is resevered for any remarks of the disbursing officer or the disbursing officer may wish to
record in respect of the execution of the work , check of measurements or the state of contractor's accounts.)
Name of Work : Construction of Waiting Room for Outpatients Relatives At sub district hospital
tirora Tirora
Agency Mahatma Jyotiba Fuley Mazoor Kamgar sanstha
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district
hospital tirora Tirora
Sub-Divisional Engineer
Public Works Sub-Division
Tirora
Name of Work : Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora Tirora
13 Upto date Qty Consumed 5507.00 0.420 0.461 1.124 0.336 0.050 2.391
HB Metal CB Metal
Quantity
Item No Item of work
Executed
Unit Above 40 Sand
Below 40 mm
mm ( 80mm)
1 2 3 4 5 6 7
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora Tirora
Rs. 13352.00
Total Rs. 13352.00 to be recovered from bill as no proof of Royality passes attached
Details of Work
Construction of Waiting Room for Outpatients Relatives At sub district
1 Name of work :-
hospital tirora Tirora
`CERTIFICATE
3 The work had been completed by the said contractor/ piece worker in all respect and as per the
standard specification.
4 Certified that no observation memo of vigilance and quality control circle/ Inspection note of higher
officer pending on this work.
5 Certified that no recovery other than proposed in proposed in final bill is due from contractor.
6 Certified that no Machinary/ special T&P and other departmental material has been issued on hire
to the contractor except Shown in the recovery statement enclosed in the bill.
8 Certified that dismantalled material obtained as per statement encloed is accounted for the registered of
dismantalled material/Not required on the above.
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora
Tirora
No. of
S.No. Agr. Item No. Test Unit Rate Total Remarks
Test
Total 13775.00
Sub-Divisional Engineer
Public Works Sub-Division
Parseoni
Frequenciwise tests required & Recovery statement of Short fall of test.
Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora
Tirora
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora Tirora
Net Weight (
S. No. Material Vehicle No. Date Time in Time Out Receipt No. Remarks
KG)
1 2 3 4 5 6 8
1 Bitmenous Mix (carpet MH-40 N 6065 14/12/2013 8.22 9.44 300 24010.00
2 Bitmenous Mix (carpet MH-40 7465 14/12/2013 8.53 10.03 303 23840.00
3 Bitmenous Mix (carpet MH-40 N 6065 14/12/2013 12.14 13.02 309 23900.00
4 Bitmenous Mix (carpet MH-40 4165 14/12/2013 12.35 13.35 311 22920.00
1 Bitmenous Mix (carpet MH-40 7465 15/12/2013 9.06 9.45 318 23410.00
2 Bitmenous Mix (carpet MH-40 7565 15/12/2013 9.10 10.29 319 24020.00
3 Bitmenous Mix (carpet MH-40 N 6065 15/12/2013 12.24 13.00 325 23700.00
4 Bitmenous Mix (carpet MH-40 7465 15/12/2013 12.26 13.35 326 22920.00
5 Bitmenous Mix (carpet MH-40 7465 15/12/2013 13.26 13.54 326 23000.00
Sub-Divisional Engineer
J. E/ A E ll / Sectional Enginer Public Works Sub-Division
Parseoni
RECOVERY STATEMENT ( of material)
Name of Wok : Construction of C.C. Road from Kesarimal Paliwal Vidyalaya to Shri.Shendre Guruji house in Ward No.5 at Parseoni in Tahsil
Parseoni, Distt.- Nagpur.
S. Quantity issue Recovery Up to date Recovery as per previous Recovery since previous
Name of material issue rate
No. rate upto date Quantity Amount Quantity Amount Quantity Amount
1 2 3 4 5 6 7 8 9 10
--------------------------------------------NIL---------------------------------------------
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district hospital tirora Tirora
1 2 3 4 5 6 7
1 Sand 190.07 Cum 237.37 45117.00 31765.00 13352.00
Name of worWidening and Black toping to Parsheoni Navegaon Khairi (MDR -18) Km 6/500 to 7/850 in Parseoni
Taluka Dist Nagpur
Test to be
No of Rem
S No Type of construction Carried
sample ark
Out
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for testing
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
No.---------------- T. S./ Office of the
Sub Divisional Engineer
P W Sub -Division
Parseoni
To
Assitant Research Officer Date
District Labortary
Nagpur
Name of worWidening and Black toping to Parsheoni Navegaon Khairi (MDR -18) Km 6/500 to 7/850 in Parseoni
Taluka Dist Nagpur
Test to be
No of Rem
S No Type of construction Carried
sample ark
Out
1 Water Bound a)Aggregate Two S-1
Macadam value
(Grade-l) b)Grading
Index and Three
Elongation Two
Index
d)Atteberg li Four S-2
Binding
e)Attebergmaterial
limits of Three S-3
portion of
aggregates
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
1 Copy submited to Executive Enginer Construction Division ( Special Project ) Nagpur
for favour of information please.
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for testing
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
No.---------------- T. S./ Office of the
Sub Divisional Engineer
P W Sub -Division
Parseoni
To
Assitant Research Officer Date
District Labortary
Nagpur
Name of worWidening and Black toping to Parsheoni Navegaon Khairi (MDR -18) Km 6/500 to 7/850 in Parseoni
Taluka Dist Nagpur
Test to be
No of Rem
S No Type of construction Carried
sample ark
Out
1 Soft Murum a)liquid limit One S-1
and Sand
(Blindage) b)Plasticity One S-2
70% Murum
30% Sand
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for testing
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
No.---------------- T. S./ Office of the
Sub Divisional Engineer
P W Sub -Division
Parseoni
To
Assitant Research Officer Date
District Labortary
Nagpur
Name of worWidening and Black toping to Parsheoni Navegaon Khairi (MDR -18) Km 6/500 to 7/850 in Parseoni
Taluka Dist Nagpur
Test to be
No of Rem
S No Type of construction Carried
sample ark
Out
1 Soft Murum a)liquid limit One S-1
and Sand
(Blindage) b)Plasticity One S-2
70% Murum
30% Sand
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for testing
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
No.---------------- T. S./ Office of the
Sub Divisional Engineer
P W Sub -Division
Parseoni
To
Assitant Research Officer Date
District Labortary
Nagpur
Name of worWidening and Black toping to Parsheoni Navegaon Khairi (MDR -18) Km 6/500 to 7/850 in Parseoni
Taluka Dist Nagpur
Test to be
No of Rem
S No Type of construction Carried
sample ark
Out
1 Soft Murum a)liquid limit Five S-1
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for testing
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
No.---------------- T. S./ Office of the
Sub Divisional Engineer
P W Sub -Division
Parseoni
To
Assitant Research Officer Date
District Labortary
Nagpur
Subect:- Testing of materials
Name of work:- Improvement to Parshivani Navegaon Khairi Road (M D R -18) K M 7/800 to 9/000 In
Tahsil :-Parshivani Dist :-Nagpur
Type of
No of
S No construction/ Test to be Carried Out Remark
sample
Material
The testing charges will be borned by Shri G N Nikam Tarasa Road Kanahan
District :-Nagpur for the above work. The materials collected from actual site of work.
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to Shri G N Nikam Tarasa Road Kanahan District :-Nagpur for information and to submit D D for
testing charges
3 Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary action.
Office of the
Sub Divisional Engineer
P W Sub -Division
d Kanahan
ork.
visional Engineer
orks Sub-Division
d necessary action.
Office of the
Sub Divisional Engineer
P W Sub -Division
d Kanahan
ork.
visional Engineer
orks Sub-Division
to submit D D for testing
d necessary action.
Office of the
Sub Divisional Engineer
P W Sub -Division
d Kanahan
ork.
visional Engineer
orks Sub-Division
d necessary action.
Office of the
Sub Divisional Engineer
P W Sub -Division
d Kanahan
ork.
visional Engineer
orks Sub-Division
d necessary action.
Office of the
Sub Divisional Engineer
P W Sub -Division
d Kanahan
ork.
visional Engineer
orks Sub-Division
d necessary action.
sional Engineer
M 7/800 to 9/000 In
d Kanahan
ork.
visional Engineer
orks Sub-Division
d to submit D D for
d necessary action.
STATEMENTSHOWING THE FREQUENCY OF TESTING
Name of Wok : Construction of C.C. Road from Kesarimal Paliwal Vidyalaya to Shri.Shendre Guruji
Name of Wok : Construction of Waiting Room for Outpatients Relatives At sub district
hospital tirora Tirora
Aggrement No:-
Abstract Of Recoveries
2 Recoveries of cost of material which are not recovered by Schedule " A"
4 Other Recoveries
Sub-Divisional Engineer
J. E/ A E ll / Sectional Enginer Public Works Sub-Division
Parseoni
BITUMEN CONSUMPTION STATEMENT
Name of Agency :-
Rate of
Theorotical Actual
S. No. Item of work Quantity Consumpti Remarks
Consumption Consumption
on
1 2 3 4 5 6 7
1 Agreement Item No. :-
(A) Providing and applying tack coat of bitumen VG-10 #REF! 0.0004 #REF! 1.92
(80/100) grade @ 0.4kg/sqm. on B.T. Surface by
mechanical sprayer, including cleaning surface ,
conveying, heating and cost of bitumen etc. complete.
2 Agreement
a) At the rateItem No. :-
of 0.4kg/sqm. On B.T. surface
Providing, laying & compacting of Built up spray grout #REF! 0.003 #REF! 13.6
layer (BUSG) 75mm thick over prepared base consisting
of two layers composite construction of compacted
crushed stone coarse aggregates with application of
3 Agreement Item No. :-
Providing, laying and rolling open - graded premix #REF! 0.00186 #REF! 18.90
surfacing (Hot Mix Hot Laid) of 20 mm thickness
composed of 13.2 mm to 5.6 mm aggregates using
bitumen of VG-30 (60/70) grade @ 1.46kg./sqm.to
4 Agreement Item No.10 :-
Providing bituminous liquid seal coat to black top surface #REF! 0.00098 #REF! 10.08
including supplying all materials & bitumen of VG-30
(60/70) grade @ 0.98 Kg./Sqm. , preparing existing road
#REF! 44.50
MT MT
Name of work:- B T Renewal to KM 13/500 to 14/500 on Kothurna Chargaon Navegaon Khairi Road
(S H -251) In Tahsil :-Parshivani Dist :-Nagpur
Please find enclosed here with following sample material
necessary testing as under.
Type of
No of
S No construction/ Test to be Carried Out Remark
sample
Material
Sub-Divisional Engineer
Public Works Sub-Division
DA As above Parseoni
2 Copy to The testing charges will be borned by Ku Seema Somkunwar Nagpur for information and
to submit D D for testing charges
Copy forwarded to R T Gaikwad , A E-ll P W Subdivision Parseoni for information and necessary
3 action.
4515 MLA FUND
First RA Bill
1) Construction of Internal Cement Concrete road Shri Bhojraj Dhore to Shri Fajit
Misar & Shri Dhanraj Dhore to Shri Mangesh Donge at Kondasawali,
in Taluka Parseoni, Dist. Nagpur. 3,34,572.00
84477.00
P.R.propos
ed
45.40
367.74
0.436
PROFORMA FOR EXTENSION OF TIME
3) Agreement No. and Date B1 / 445 /DL of 2013 -2014 dt. 28/2/2014
11) Estension granted (Authority) Executive Engineer, Construction Division (S.P.) Nagpur