The Quality Observation Card documents an issue found during inspection of equipment RV-2170 where the setting pressure on the calibration tag did not match the value on the RV certificate. Specifically, the tag said 8215 Kpa vs 8275 Kpa on the certificate. It was determined this was due to lack of awareness of proper physical traceability procedures. The field engineer agreed to request the calibrator revise the corrected setting pressure value to address the non-compliance and prevent future issues. The QOC was subsequently closed on February 28, 2023.
The Quality Observation Card documents an issue found during inspection of equipment RV-2170 where the setting pressure on the calibration tag did not match the value on the RV certificate. Specifically, the tag said 8215 Kpa vs 8275 Kpa on the certificate. It was determined this was due to lack of awareness of proper physical traceability procedures. The field engineer agreed to request the calibrator revise the corrected setting pressure value to address the non-compliance and prevent future issues. The QOC was subsequently closed on February 28, 2023.
The Quality Observation Card documents an issue found during inspection of equipment RV-2170 where the setting pressure on the calibration tag did not match the value on the RV certificate. Specifically, the tag said 8215 Kpa vs 8275 Kpa on the certificate. It was determined this was due to lack of awareness of proper physical traceability procedures. The field engineer agreed to request the calibrator revise the corrected setting pressure value to address the non-compliance and prevent future issues. The QOC was subsequently closed on February 28, 2023.
What Detail Physical Traceability - Reference Number
Why Not Aware
What is/are the finding During inspection of 86RV-2170 it was found
different value of Setting Pressure between RV Certificate and actual Calibration Tag. [8275 Kpa Vs 8215 Kpa]
Workpack No. 1011-180-FA14-WPK-126
Note: Please include information such as reference documents, activities,
equipment details, and etc. What is/are the potential quality non-compliance Damaged of equipment, safety issues consequences/risks Note: Insert which BSP Requirements are not followed and potential NCR that might happen Did a conversation take place? ☒
Was there an agreed remedial/correction or Discussed with Field Engineer to request
preventive action? If so, describe this calibrator subcontractor’s send revision/corrected set pressure value – Done
Note: Action taken should be Specific, Measurable, Attainable, Relevant, Time
Frame (SMART) Has this been closed, or open? Closed
Target Close-Out Date 2/28/2023
If QOC is still open, please choose target close-out date. If QOC is closed, leave this column empty Actual Close-Out Target Date Click here to enter a date. If QOC status is closed, leave column empty
Action Party Onshore-Offshore Construction
If you are unsure who the action party is/are, please contact your QAQC Focal Point for the appointed area. Pictures: