Quality Observation Card

QOC No QOC-WOOD-FEB23-XXX(1)

Project Title CPCX07 REJUV PH1

Raise By FREDDY EERSTA PUTRA

Location CPGP

Date Raised 2/16/2023

What did you observe? Bad Practices

What Physical Traceability

What Detail Physical Traceability - Reference Number

Why Not Aware

What is/are the finding During inspection of 86RV-2170 it was found


different value of Setting Pressure between RV
Certificate and actual Calibration Tag.
[8275 Kpa Vs 8215 Kpa]

Workpack No. 1011-180-FA14-WPK-126

Note: Please include information such as reference documents, activities,


equipment details, and etc.
What is/are the potential quality non-compliance Damaged of equipment, safety issues
consequences/risks
Note: Insert which BSP Requirements are not followed and potential NCR that
might happen
Did a conversation take place? ☒

Was there an agreed remedial/correction or Discussed with Field Engineer to request


preventive action? If so, describe this calibrator subcontractor’s send revision/corrected
set pressure value – Done

Note: Action taken should be Specific, Measurable, Attainable, Relevant, Time


Frame (SMART)
Has this been closed, or open? Closed

Target Close-Out Date 2/28/2023


If QOC is still open, please choose target close-out date. If QOC is closed,
leave this column empty
Actual Close-Out Target Date Click here to enter a date.
If QOC status is closed, leave column empty

Action Party Onshore-Offshore Construction


If you are unsure who the action party is/are, please contact your QAQC Focal
Point for the appointed area.