DSR OF GOMD -V, DVC, HAZARIBAG

132 KV HAZARIBAG S/S GOMD-V


Name of Sub-Station: HAZARIBAG 132 KV Konar Sub-Staion

Date: 02/01/2024 02.01.2024

TRIPPING nil 33 KV Banaso Fdr-1 time-05 Mins.

Bus voltage at each level At 6:00 Hrs- 133 KV/ 34.2 KV, At 19:00
130/32.9kv 123/30.9
(At 6:00 hrs & 19:00 hrs) Hrs- 129 KV/33.6 KV

Trf Loading (IN MVA) and


Tr#1(31.5MVA):- 6.25 MVA, WTI:34,
corresponding WTI & OTI temp PTR1 30.57Mva 28/29 PTR2 30.57MVA
OTI-33 Tr#2(20.0 MVA) :-1.63 MVA
(MVA, WTI,OTI RESPECTIVELY) 28/29 PTR3 32.61 36/40
WTI :-33 , OTI :- 23
(At 19:00 hrs)

PTR1 - between 35°c &3/4, Trf#1(31.5 MVA):35%, Tr#2(20


MOG level of Transformer
PTR2 -at 35°c and PTR3 - above 35°c MVA):40%
PTR1- fan/ pump -2,5/1,3 PTR2 - 2,5/1,3
Status of Fan & Pump Ok
PTR3 - 1,2,3,4,5,6,7,8,9/ No pump

Minor leakage from 31.5 MVA Tr# 1


Oil Leakage in Transformer oil leakage in 50 MVA TR-2 & TR-3
from its CT Junction Box.

Oil Level Of Trf Bushing ok Ok

Oil Leakage in CT/PT/CVT nil No Oil Leakage

Silica Gel condition of Trf ok Ok


Healthiness of Air cell of
conservator(where ever ok NA
applicable)
Status of NIFPS,
CTR 1 is in service & 2 is out of service. Tr# 1-Not Available Tr#2-ok
(N2 pressure)

B/C status of each voltage level


normal and free 132kv b/c free & available

SAS Healthiness NA NA

Status of Protection System ok ok

Status of all indications & meters


Ok
of CRP
Status of SF6 pressure of CBs OK
Status of compressor of breakers ok
Monitoring of LA Surge Counter
ok ok
Reading
battery status -2 no. of battery bank and
Status of Battery & Charger Ok
charger- normal/ ok

Status of all exhaust fan &


ok OK
illumination of the battery room

Healthiness of 220V DC Voltage positive to ground - 107v, negative to Negative to Earth- 151 V, positive to
system(+ve to Gnd & -ve to Gnd) ground - 133v Earth- 86 V

1. Carrier signal Send Switch Not


Status of PLCC/Carrier Protection normal except carrier phone
available in L#79 CRP.

Status of upkeepment of control


cleaned NIL
room & Switchyard

Major S/D nil NIL


Schedule Substation general cleaning of swyd and control
nil
Maintenance Work room & maintanance in swyd

Schedule Line Maintenance


Work
Splicing work in L#79/80.

JBVNL 1+2 1T 25' JBVNL-4-2T-20'JBVNL Banaso and Karma 1 times for 90


L/S
3+5 2T 70' min

B/D nil Nil


Additional nil.

Note: 1.Any exception found in the above mention list shall be highlighted.
2. Report shall be posted at every morning.
OF GOMD -V, DVC, HAZARIBAG
132 KV Koderma & 33 kV R/S
132 KV Barhi Sub-Station Koderma 220 /132/33 KV KTPS SS

17.01.2024 01.01.2024

2-1-2024
1) Barhi-1 :- 2 Times 06 min.fault Koderma S/Stn.: Nil. 33kv R/S/Stn.: Nil (1)Jbvnl #1 from 12:54 to 13:04 hr ,E/F trip ,86 .
at JBVNL end
Koderma S/s
At 06:00 Hrs : 126/32.0/25.8KV,
132KV:: 132.3/ 128.4 At 19:00 hrs: 127/33.2/26KV
33 KV:: 33.4 / 33.5 Koderma R/S :
At 06:00 Hrs : 32.0/10.50KV
At 19:00 Hrs : 32.44/10.69KV 6:00 Hrs 225kv/131kv/33 kv
19:00 Hrs 221 kv/127 kv/32 kv

WTI/OTI/MW: 150 MVA ATR 1-91 MW, WTI- 34 DEGREE,OTI-32


Trf. # 1 : (80 MVA) - 25.18MVA , OTI - 50 MVA Tr#1:- 46/38/31.42 DEGREE 150 MVA ATR 2-
38 WTI - 40 80 MVA Tr#2:- 46/38/50.28 91 MW, WTI- 34 DEGREE,OTI-32 DEGREE.
Trf. # 2 : (80 MVA) - 25.64 MVA , OTI - 25MVA RTR#1:- 34/32/8
40 WTI - 42 25MVA RTR#2:- 30/34/8 80MVA TR 1-23 MW , WTI-35
R/S: 5MVA TR :- 21/25/0.18 DEGREE,OTI-33 DEGREE 80 MVA TR 2-Only
charged,WTI-32 DEGREE,OTI -32 DEGR 50 MVA TR-
150Only
MVA charged,
ATR 1-WTI-
70 30
% DEGREE, OTI-30 DEGREE
150 MVA ATR 2- 50
Trf # 1 : (80 MVA):between 1/4 & 50 MVA Tr#1:- Above 1/4 mark %
3/4 80 MVA Tr#2:- Above 35 ⁰ C mark 80 MVA TR 1- 25 %
Trf # 2 : (80 MVA):between 1/4 & 25MVA RTR#1:- Above 30 ⁰ C mark 80 MVA TR 2- 25
3/4 25MVA RTR#2:- Close to 30 ⁰ C mark %
R/S: 5MVA TR :- Above 1/4 mark 50 MVA TR - 25 %
OK
OK Ok

1.Seepage in 25 MVA RTR#1 at Koderma


S/s. NO LEAKAGE
Trf # 1 : (80 MVA) : Nil
2. Seepage in 80 MVA PTR#2 at Koderma
Trf # 2 : (80 MVA) : Nil S/s.
3. Oil seepage in 5 MVA Trf. at R/S/stn
OK Ok OK

NO LEAKAGE
Nil NO LEAKAGE
OK
OK OK
OK OK OK
Trf # 1 : (80 MVA) : OK, N2 OK
Installed only in 80 MVA Tr#2& is out of
Cylinder Pr -105 Kg/cm2
service from 21.03.23 due to alarm cylinder
Trf # 2 : (80 MVA) : OK, N2 pressure low & leakage
Cylinder Pr -130 Kg/cm2
220 KV-FREE AND AVAILABLE
132 KV : Free & Available 132 KV-FREE AND AVAILABLE
Normal and free 33KV-
33 KV : No Provision BREAKER NOT AVAIABLE

OK
NA NA

OK 220 kv bus bar protection is out of service due to 3


No.s of faulty bus bar units.Replacement will start
OK soon as work order has been issued.
OK
OK
OK
OK OK IN NORMAL RANGE
OK OK Not applicable
OK
OK
OK
OK Battery bank 1 and 2 - On load .
Battery Charger 1 and 2- On Manual Float
OK mode
OK
OK
OK

=+ve to E : 140V Negative to Earth-126 V, Batt.Bank #1 +ve to gnd 137.6V, -ve to gnd 102.9 V
-ve to E : 95 V Positive to Earth- 122V. Batt.Bank #2 +ve to gnd 137.9 V, -ve to gnd
103.3 V
Healthy
OK
OK

Deweeding work is in progress. Deweeding work is in progress.

Deweeding is under progress.


S/D of THS - from 14:46hrs to 15:46- 80 mva tr# 2 from 10.00 to 16.33 hrs for annual
60min Taken by THS for remove a maintenance work.
tree about to fall on 33kv Hydel
conductor Line

S/D of 132KV L#83CB- from 12:50hrs


to 14:10 hrs -80min taken by NIL
maintenace team for annual
maintenace

S/D of B/C BKr- 11:10hrs to 12:50hrs-


50 min taken by maintenace team for
annul maintenance
Nil general cleaning of swyd and control room &
Nil
maintanance in swyd

Patrolling ,leg cleaning & tree trimming of


Line#251/252 from loc no. 86 towards Giridih.

nil

1 time -90 mins.

(1) 33 KV Barhi fdr.# 1 :: 01 Times


for 27 min.as per CLD. JBVNL Fdr 1: 2 time for 75 minutes 1)
(2) 33 KV Barhi fdr.# 2 :: 01 Times from 16:17 hrs to 16:32 hrs for 15
for 27 min.as per CLD. minute-170A CLD. (ii) From18:13 hrs to
(3) 33 KV Padma fdr. :: 01 Times 19:13 hrs -60 minutes-260A-As per CLD.
for27 min.as per CLD.

Nil Nil nil


Nil Nil
Line 94- 6.5 ;
ok
Line
93,PTR(1+2),B/
C - 6.7 & PTR3
-7.0
NA
132 KV HAZARIBAG S/S GOMD-V
Name of Sub-Station: HAZARIBAG 132 KV Konar Sub-Staion

Date: 20/02/2024
20.02.2024

TRIPPING nil

NIL

Bus voltage at each level


133/33.0 kv 124/31.2kv
(At 6:00 hrs & 19:00 hrs)

At 6:00 Hrs- 129 KV/ 33.0 KV, At 19:00 Hrs- 129 KV/33.2 KV

Tr#1(31.5MVA):-9.11MVA, WTI:40, OTI-39 ,


Tr#2(20.0 MVA) :-5.17MVA WTI :-40 ,OTI :- 34
Trf Loading (IN MVA) and
corresponding WTI & OTI temp PTR1-29.48MvA 34/35 PTR2- 29.36
(MVA, WTI,OTI RESPECTIVELY) 34/35 PTR3- 30.89 MVA 42/44
(At 19:00 hrs)

Trf#1(31.5 MVA):35%, Tr#2(20 MVA):40%


Ok

PTR1 - between 35°c &3/4,


MOG level of Transformer
PTR2 bellow 35°c and PTR3 - above 35°c

1. Minor leakage from 31.5 MVA Tr# 1 from its CT Junction Box.
PTR1- fan/ pump -2,5/1,3 PTR2 - 2,5/1,3
Status of Fan & Pump
PTR3 - 1,2,3,4,5,6,7,8,9/ No pump

Ok
Oil Leakage in Transformer oil leakage in 50 MVA TR-2 & TR-3

Oil Level Of Trf Bushing ok No Oil Leakage

Ok
Oil Leakage in CT/PT/CVT nil
NA
Silica Gel condition of Trf ok
Healthiness of Air cell of
conservator(where ever ok Tr# 1-Not Available Tr#2-ok
applicable)
Status of NIFPS,
CTR 1 is in service and 2 is in off position
(N2 pressure)
Free & Available
NA
B/C status of each voltage level
normal and free
ok,
SAS Healthiness NA
Ok

Status of Protection System ok

Status of all indications & meters OK


ok
of CRP
Line 94- 6.5 ; Line 93,PTR(1+2),B/C - 6.7 & ok
Status of SF6 pressure of CBs
PTR3 -7.0
Status of compressor of breakers NA ok
Ok
Monitoring of LA Surge Counter
ok
Reading

OK
battery status -2 no. of battery bank and
Status of Battery & Charger
charger- normal/ ok

Negative to Earth- 152.4 V, positive to Earth-84.3 V


Status of all exhaust fan &
ok
illumination of the battery room

1. Carrier signal Send Switch Not available in


Healthiness of 220V DC Voltage positive to ground - 133v, negative to L#79 CRP.
system(+ve to Gnd & -ve to Gnd) ground - 94v 2. Hzb Road Rly PLCC Out of Service.
3. L#83 Carrier faulty
from 23:30 hrs.
Status of PLCC/Carrier Protection normal except carrier phone
OK

Status of upkeepment of control


cleaned
room & Switchyard
Nil
Major S/D nil

General cleaning S/Y &C/R

Schedule Substation
nil
Maintenance Work

Line Patrolling , tree trimming and leg cleaning in L#80&83


L#80/83 Line patrolling & tere trimming from loc. 59 onwards...

Schedule Line Maintenance


Work

L/S JBVNL Fdr#(3+4+5) - 2(T) 25' NIL


Nil

B/D nil

Additional

Note: 1.Any exception found in the above mention list shall be highlighted.
2. Report shall be posted at every morning.
132 KV Barhi Sub-Station 132 KV Koderma & 33 kV R/S Koderma

20-2-2024 20-2-2024
1) Barhi-1 :- Nil .
2) Barhi-2 :- Nil
3) Padma :- 01 Time for 52 min.due to fault at
JBVNL.
4) THS Tie :- Nil.
Nil

Koderma S/s
At 06:00 Hrs : 129/33.4/26.5KV,
132KV:: 128.9/ 128.4 At 19:00 hrs: 125/32.0/25.5KV
33 KV:: 33.6 / 32.3 Koderma R/S :
At 06:00 Hrs : 31.91/10.54KV
At 19:00 Hrs : 31.00/10.20KV
WTI/OTI/MW:
50 MVA Tr#1:- 53/51/42.85
Trf. # 1 : (80 MVA) - 34.33 MVA , OTI - 46 WTI - 50 80 MVA Tr#2:-60/58/71.42
Trf. # 2 : (80 MVA) - 34.50 MVA , OTI - 44 WTI - 47 25MVA RTR#1:- 46/44/8
25MVA RTR#2:- 44/48/8
5 MVA TR R/S:- 34/38/0.51

50 MVA Tr#1:- Above 1/4 mark


Trf # 1 : (80 MVA):between 1/4 & 3/4 80 MVA Tr#2:- Above 35 ⁰ C mark
Trf # 2 : (80 MVA):between 1/4 & 3/4 25MVA RTR#1:- Above 30 ⁰ C mark
25MVA RTR#2:- Close to 30 ⁰ C mark
R/S: 5MVA TR :- Above 80% mark

OK Ok

1.Seepage in 25 MVA RTR#1 at Koderma S/s.


Trf # 1 : (80 MVA) : Nil 2. Seepage in 80 MVA PTR#2 at Koderma S/s. 3. Oil
Trf # 2 : (80 MVA) : Nil seepage in 5MVA Tr. at 33 KV R/S/stn.

OK Ok

Nil NO LEAKAGE

OK OK
OK OK
Trf # 1 : (80 MVA) : OK, N2 Cylinder Pr -108
Kg/cm2 Installed only in 80 MVA Tr#2& is out of service from
Trf # 2 : (80 MVA) : OK, N2 Cylinder Pr -135 21.03.23 due to alarm cylinder pressure low & leakage
Kg/cm2

132 KV : Free & Available Normal and free


33 KV : No Provision
NA NA

OK OK

OK OK

OK OK
OK OK

OK OK

OK OK

OK OK

=+ve to E : 145V Negative to Earth-100V,


-ve to E : 95 V Positive to Earth- 150V.

OK OK

Deweeding work is in progress. Deweeding work is in progress.


1) 132 kv of GCB of L # 93 ----11:04 to 12:30 = 86
min.shut down taken by HZB team for annual maintence.
Nil
2) 132 kv of GCB of L # 94 ----12:37 to 13:46 = 69
min.stut down taken by HZB team for annual maintence.

Nil

aning in L#80&83

Line patrolling of L#80/83 from loc no 134 onwards Nil

(1) 33 KV Barhi fdr.# 1 :: 01 Time for 37 min.as per


CLD.
(2) 33 KV Barhi fdr.# 2 :: 01 Time for 37 min.as per JBVNL-I: 1 time for 10 minutes 1) from 07.50 to 08.00 hrs
CLD. for 10 minutes 320A CLD
(3) 33 KV Padma fdr. :: 01 Time for 37 min.as per
CLD.
Nil Nil

Nil
220 /132/33 KV KTPS SS

20-2-2024

Nil

6:00 Hrs 224kv/130kv/33 kv


19:00 Hrs 220kv/126 kv/32.7 kv

150 MVA ATR 1-97 MW, WTI- 54 DEGREE,OTI-48 DEGREE


150 MVA ATR 2- 97 MW, WTI- 50
DEGREE,OTI-44 DEGREE.
80MVA TR 1-
20 MW,WTI-48 DEGREE,OTI-47 DEGREE 80 MVA TR
2-Charged only from HTside,WTI-40 DEGREE,OTI -41
DEGREE , 50 MVA TR-Only charged, WTI- 37 DEGREE, OTI-
36 DEGREE
150 MVA ATR 1- 70 %
150 MVA ATR 2- 35 %
80 MVA TR 1- 25 %
80 MVA TR 2- 25 %
50 MVA TR - 25 %

OK

NO LEAKAGE

OK

NO LEAKAGE

OK

OK
OK, except-( 1)ATR # 2 CTR put on off condition due to low
gas pressure since 19.01.24 .
220 KV-FREE AND AVAILABLE
132 KV- FREE AND AVAILABLE
33KV-BREAKER NOT
AVAIABLE

OK
220 kv bus bar protection is out of service due to 3 No.s of
faulty bus bar units.Replacement will start soon as work
order has been issued.

OK

IN NORMAL RANGE

Not applicable
OK
Battery bank 1 and 2 - On load . Battery
Charger 1 and 2- On Manual Float mode

OK

Batt.Bank #1 +ve to gnd 139.4 V, -ve to gnd 103.8 V


Batt.Bank #2 +ve to gnd 139.3 V, -ve to gnd 103.8 V

Healthy

Deweeding is under progress.

Nil
1.Arresting leakage of CTR of 150 MVA ATR 2
2.Installation of 120 W LED
3.General cleaning and maintenance of switchyard

Line patrolling and tree trimming of line 101-102 and


line 43-44 from loc 1-10 and loc 60-68 respectively

nil

Nil
nil