Bus voltage at each level At 6:00 Hrs- 133 KV/ 34.2 KV, At 19:00
130/32.9kv 123/30.9
(At 6:00 hrs & 19:00 hrs) Hrs- 129 KV/33.6 KV
SAS Healthiness NA NA
Healthiness of 220V DC Voltage positive to ground - 107v, negative to Negative to Earth- 151 V, positive to
system(+ve to Gnd & -ve to Gnd) ground - 133v Earth- 86 V
Note: 1.Any exception found in the above mention list shall be highlighted.
2. Report shall be posted at every morning.
OF GOMD -V, DVC, HAZARIBAG
132 KV Koderma & 33 kV R/S
132 KV Barhi Sub-Station Koderma 220 /132/33 KV KTPS SS
17.01.2024 01.01.2024
2-1-2024
1) Barhi-1 :- 2 Times 06 min.fault Koderma S/Stn.: Nil. 33kv R/S/Stn.: Nil (1)Jbvnl #1 from 12:54 to 13:04 hr ,E/F trip ,86 .
at JBVNL end
Koderma S/s
At 06:00 Hrs : 126/32.0/25.8KV,
132KV:: 132.3/ 128.4 At 19:00 hrs: 127/33.2/26KV
33 KV:: 33.4 / 33.5 Koderma R/S :
At 06:00 Hrs : 32.0/10.50KV
At 19:00 Hrs : 32.44/10.69KV 6:00 Hrs 225kv/131kv/33 kv
19:00 Hrs 221 kv/127 kv/32 kv
NO LEAKAGE
Nil NO LEAKAGE
OK
OK OK
OK OK OK
Trf # 1 : (80 MVA) : OK, N2 OK
Installed only in 80 MVA Tr#2& is out of
Cylinder Pr -105 Kg/cm2
service from 21.03.23 due to alarm cylinder
Trf # 2 : (80 MVA) : OK, N2 pressure low & leakage
Cylinder Pr -130 Kg/cm2
220 KV-FREE AND AVAILABLE
132 KV : Free & Available 132 KV-FREE AND AVAILABLE
Normal and free 33KV-
33 KV : No Provision BREAKER NOT AVAIABLE
OK
NA NA
=+ve to E : 140V Negative to Earth-126 V, Batt.Bank #1 +ve to gnd 137.6V, -ve to gnd 102.9 V
-ve to E : 95 V Positive to Earth- 122V. Batt.Bank #2 +ve to gnd 137.9 V, -ve to gnd
103.3 V
Healthy
OK
OK
nil
Date: 20/02/2024
20.02.2024
TRIPPING nil
NIL
At 6:00 Hrs- 129 KV/ 33.0 KV, At 19:00 Hrs- 129 KV/33.2 KV
1. Minor leakage from 31.5 MVA Tr# 1 from its CT Junction Box.
PTR1- fan/ pump -2,5/1,3 PTR2 - 2,5/1,3
Status of Fan & Pump
PTR3 - 1,2,3,4,5,6,7,8,9/ No pump
Ok
Oil Leakage in Transformer oil leakage in 50 MVA TR-2 & TR-3
Ok
Oil Leakage in CT/PT/CVT nil
NA
Silica Gel condition of Trf ok
Healthiness of Air cell of
conservator(where ever ok Tr# 1-Not Available Tr#2-ok
applicable)
Status of NIFPS,
CTR 1 is in service and 2 is in off position
(N2 pressure)
Free & Available
NA
B/C status of each voltage level
normal and free
ok,
SAS Healthiness NA
Ok
OK
battery status -2 no. of battery bank and
Status of Battery & Charger
charger- normal/ ok
Schedule Substation
nil
Maintenance Work
B/D nil
Additional
Note: 1.Any exception found in the above mention list shall be highlighted.
2. Report shall be posted at every morning.
132 KV Barhi Sub-Station 132 KV Koderma & 33 kV R/S Koderma
20-2-2024 20-2-2024
1) Barhi-1 :- Nil .
2) Barhi-2 :- Nil
3) Padma :- 01 Time for 52 min.due to fault at
JBVNL.
4) THS Tie :- Nil.
Nil
Koderma S/s
At 06:00 Hrs : 129/33.4/26.5KV,
132KV:: 128.9/ 128.4 At 19:00 hrs: 125/32.0/25.5KV
33 KV:: 33.6 / 32.3 Koderma R/S :
At 06:00 Hrs : 31.91/10.54KV
At 19:00 Hrs : 31.00/10.20KV
WTI/OTI/MW:
50 MVA Tr#1:- 53/51/42.85
Trf. # 1 : (80 MVA) - 34.33 MVA , OTI - 46 WTI - 50 80 MVA Tr#2:-60/58/71.42
Trf. # 2 : (80 MVA) - 34.50 MVA , OTI - 44 WTI - 47 25MVA RTR#1:- 46/44/8
25MVA RTR#2:- 44/48/8
5 MVA TR R/S:- 34/38/0.51
OK Ok
OK Ok
Nil NO LEAKAGE
OK OK
OK OK
Trf # 1 : (80 MVA) : OK, N2 Cylinder Pr -108
Kg/cm2 Installed only in 80 MVA Tr#2& is out of service from
Trf # 2 : (80 MVA) : OK, N2 Cylinder Pr -135 21.03.23 due to alarm cylinder pressure low & leakage
Kg/cm2
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
OK OK
Nil
aning in L#80&83
Nil
220 /132/33 KV KTPS SS
20-2-2024
Nil
OK
NO LEAKAGE
OK
NO LEAKAGE
OK
OK
OK, except-( 1)ATR # 2 CTR put on off condition due to low
gas pressure since 19.01.24 .
220 KV-FREE AND AVAILABLE
132 KV- FREE AND AVAILABLE
33KV-BREAKER NOT
AVAIABLE
OK
220 kv bus bar protection is out of service due to 3 No.s of
faulty bus bar units.Replacement will start soon as work
order has been issued.
OK
IN NORMAL RANGE
Not applicable
OK
Battery bank 1 and 2 - On load . Battery
Charger 1 and 2- On Manual Float mode
OK
Healthy
Nil
1.Arresting leakage of CTR of 150 MVA ATR 2
2.Installation of 120 W LED
3.General cleaning and maintenance of switchyard
nil
Nil
nil