Professional Documents
Culture Documents
HW 9 Directional Drilling
HW 9 Directional Drilling
1
2) Given the following data, calculate the maximum inclination of the well and the
measured depth of the well.
Kick-off Point, KOP 1,000’
Horizontal displacement at total depth 4,000’
Projected TVD of well 10,000’
Build Rate, BUR 4° deg/100’
This is a build and hold wellbore.