Professional Documents
Culture Documents
Spbu 778 Supplier
Spbu 778 Supplier
Dear Sir,
Please note that the quote Supply, Deliver and Installation of wooden door and metal door in addition,
labor transportation, food and accommodation shall be included in your price . Please Consider the
following notes :
Material: Single and Double leaf solid wooden door with hardwood veneer.and metal door
Finish : hardwood veneer finish with powder coated galvanize steel frame and metal sheet on powder
coated galvanize steel frame.
1)10% advance payment 2) 100% progress payment 50% after delivery will be
paid after 30 days and 50% after installation will be paid after 30 days 3) 10%
retention 5% after Initial HO of building and 5% after final HO of building
Please note that there is an alternative line option available on system. you may need to use if you need
to present your exact description.
and this video for all aspects, like, invoicing, payments, deliveries etc
https://sites.google.com/el-seif.com.sa/elseif-supplier-portal/home
if you do not have user name and password, you can write an email to c.somera@EL-SEIF.COM.SA to reset
your user name and password.
thanks
This document has important legal consequences. The information contained in this document is proprietary of EL
SEIF GROUP. It shall not be used, reproduced, or disclosed to others without the express and written consent of EL
SEIF GROUP.
Table of Contents
1 Overview.......................................................................................................................................................................5
1.1 General Information..............................................................................................................................................5
1.2 Schedule................................................................................................................................................................5
1.3 Negotiation Controls.............................................................................................................................................5
1.4 Response Rules.....................................................................................................................................................5
1.5 Terms....................................................................................................................................................................5
2 Requirements................................................................................................................................................................6
3 Lines..............................................................................................................................................................................7
3.1 Line Information...................................................................................................................................................7
3.2 Line Details...........................................................................................................................................................9
3.2.1 Line 1..............................................................................................................................................................9
3.2.2 Line 2............................................................................................................................................................10
3.2.3 Line 3............................................................................................................................................................10
3.2.4 Line 4............................................................................................................................................................10
3.2.5 Line 5............................................................................................................................................................10
3.2.6 Line 6............................................................................................................................................................11
3.2.7 Line 7............................................................................................................................................................11
3.2.8 Line 8............................................................................................................................................................11
4 Appendix: Alternate Lines..........................................................................................................................................13
4.1 Instructions for Alternate Lines..........................................................................................................................13
4.2 Alternate Lines Template...................................................................................................................................13
1 Overview
1.1 General Information
Title Supply, Delivery And Installation of Metal & Wooden Door For POL Store
Synopsis Shop Drawing Shall Be Submitted For Approval Prior To Manufacturing.
-The Dimensions Shown In Attached Signed Door Schedule Are To Be Followed.
-The Drawing To Be Used For Information Only.
-Pre- Approved Sub-Contractor.
1.2 Schedule
Preview Date Open Date 16-Apr-2019 7:00 PM
Close Date 16-Apr-2019 11:40 AM Award Date
Time Zone Arabia Standard Time
Lines Settings
Rank Indicator 1,2,3...
Ranking Method Price only
1.4 Response Rules
This negotiation is governed by all the rules displayed below.
Rule
Negotiation is restricted to invited suppliers
Suppliers are allowed to respond to selected lines
Suppliers are required to respond with full quantity on each line
Suppliers are allowed to provide multiple responses
Suppliers are allowed to revise their submitted response
1.5 Terms
2 Requirements
*Response is required
Shop Drawing Shall Be Submitted For Approval Prior To Manufacturing.
-The Dimensions Shown In Attached Signed Door Schedule Are To Be Followed.
-The Drawing To Be Used For Information Only.
-Pre- Approved Sub-Contractor.
Note : Providing Accommodation To Subcontractor Will Be ESECs Responsibility.
3 Lines
Contracting Company
TABUK
Start Price (SAR)
Contracting Company
TABUK
Start Price (SAR)
Alternate lines are allowed for some negotiation lines. For these lines, you can propose one or more alternatives by
entering information for each alternate line in the format given below. Print and insert multiple copies as per your
requirement.
Negotiation
Line
(Number and description of the negotiation line for
which you have an alternative)
Example:1-xxxxxx
where xxxxxx is the line description of first negotiation
line.
Alternate Line Number
(Enter only numbers in sequence starting with 1 for
every alternate line)
Alternate Line Description
Response Price
(For a negotiation line with cost factors, enter your line
price in the cost factors table)
Response Quantity
UOM
Promised Date
Note to Buyer