Professional Documents
Culture Documents
60 Avensis (Cont. Next Page) : Charging (From May 2015 Production)
60 Avensis (Cont. Next Page) : Charging (From May 2015 Production)
next page)
1 2 3 4
(IG) (BAT)
10A 120A
ECU–IG ALT
NO. 2
19 DB 1 1M
B
(∗7)
P
B1(A), B16(B), B50(C)
1 A Generator Assembly
B
AVENSIS (EM25G4E)
IC Regulator
IG M L RLO LIN
2 B 3 B 4 B 1 B 2 C
(∗7)
(∗7)
(∗7)
(∗7)
(∗6)
P
V
L
L
4 BA2 5 BA2 6 BA2
< 11–16>
ECM
(∗7)
(∗7)
Y
L
(∗7)
L
L
1 AD6 3 BA2 2 AD5
(∗7)
(∗7)
(∗7)
Y
L
L
Y
A
(∗7)
Amplifier Assembly
< 12–18>
Air Conditioning
ECM
< 48–7>
60 AVENSIS (Cont' d)
C h a rg in g (F ro m M a y 2 0 1 5 P ro d u c tio n )
∗ 7 : 3ZR–FE
5 6 7 8
(BAT) (IG)
10A 7. 5A
ECU–B METER
W
2
1 12 3C 1 DM
W
4 AD3
P
24 3B
W
D66(A)
40 A 39 A Combination Meter
AVENSIS (EM25G4E)
B IG+
Micro Controller
CAN Controller
CAN
Transceiver I/F
CAN I/F
W–B
(∗7)
Y
Multiplex
Communication
(RHD)
(LHD)
W–B
W–B
System (CAN)< 54–6>
Y
A
(∗7)
D1 D4