SENARAI KUANTITI
* NOTE
1. Total of the price must agree with the lump sum quoted in the Form of Tender (JKR 201N1/2010)
otherwise the tender may not be considered.
2. Tenderers are again reminded to read and ensure all instructions in the
'IMPORTANT NOTES TO TENDERERS' are adhered to.
3. Tenderers shall be responsible to ensure all calculations are thoroughly checked and verified
before submitting the tender. Any miscalculations if occur, shall be borned by the tenderer.
4. In the event of price difference quoted between Bill Of Quantity (BQ) and Form Of Tender,
the price quoted in the Form Of Tender shall be deemed as final and binded.
5. Catalogues complete with technical data shall be submitted especially for special lightings
used in this project. Failing to do so, the tenderer is subject to be rejected. For futher information
and queries please call 03 2618 9857 or email to ikmas.uprba1cke@jkr.gov.my.
Signature : .........................................
Company's Chop :
Date : 02.02.2022
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT
RUMAH GURU DI SMK LAWAS, LAWAS, SARAWAK
SUMMARY OF PRICES
1 PRELIMINARIES 195,732.00
2 ELECTRICAL SERVICES
SUMMARY OF PRICES
ITEM DESCRIPTION OF WORK SUB TOTAL (RM)
5 MISCELLANEOUS 10,406.00
RINGGIT MALAYSIA : SIX MILLION SIX HUNDRED TWENTY SIX THOUSAND ONLY
SUMMARY OF PRICES
* Note: This total must agree with the total lump sum quoted in the Form of Tender
otherwise the tender may not be considered.
Signature : ________________________________
Name : ________________________________
Designation : ________________________________
Date : ________________________________
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
A PART I - GENERAL INFORMATION
Notes:
The amounts inserted by the Nominated Sub-Contractor for such Preliminary
Items shall be deemed to apply to the whole of the Works carried out under
this Sub-Contract.
Each Preliminary Item or Clause shall be individually priced. Bulk pricing for
accepted and no subsequent claims for loss or expenses and/or profit shall be
Where any Preliminary Item or Clause is left unpriced, it shall be deemed that
the cost of such Preliminary Items or Clauses have been allowed for
out of expenses and/or loss incurred against such unprices Preliminary Item
Not withstanding the above clauses, the S.O. reserves the right to request
from the Contractor the detailed breakdown of the pricing for Preliminary
Items or Clauses or the rates in the Bill of Quantities for examination and
Headings are not comprehensive and do not necessarily reflect or modify the
meaning of the items in the B.Q. The exact nature and extent of the work to
Where Preliminary Items or Clauses or items in the Bill of Quantities are priced
but have not been executed on site by the Contractor, the cost of such priced
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
1.0 Pricing of Bill of Quantities
1.1 The sum of the amounts of all items of the Bill of Quantities priced by the
tenderer shall truly represent the amount shown in his tender. The rates set
down by the Tenderer against each item in the Bill of Quantities shall be the
full inclusive rates and prices for the finished work (unless expressly provided
to the contrary) and shall be held to include providing and delivering all
materials, unloading, cutting and waste on materials, storage, packing,
carriage and cartage, hoisting, all labour, setting, fitting and fixing in position,
use of plant, providing suspension, establishment charges, profit and all other
labour and everything else necessary for the due and proper completion of
each item.
1.2 Where the tenderer leaves any item blank in the preliminaries or insert only a
dash against any item in these Bill of Quantities the value thereof shall be
rationalisation before the signing of the contract and the authority to fix a
reasonable rates/amount shall be with the S.O. The amended rates shall be
used for computing the progress payments and the measuring of variations.
1.6 Where Quantities in these Bill of Quantities are marked provisional, the works
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
2.0 Currency of Payment
2.1 Pricing of the Sub-Contract shall be in Malaysian Ringgit to two decimal place.
Payment to the Nominated Sub-Contractor under the Sub-Contract shall be in
Malaysian Ringgit.
4.1 The Nominated Sub-Contractor shall always adhere to all requirement and
regulations under Occupational Safety and Health Act and maintain a safe and
Works.
5.1 The Nominated Sub-Contractor shall make good of any defects, shrinkage and
any other faults which may appear within the Defects Liability Period as
5.2 No claim shall be entertained if the repair of any defects results an increment
in cost.
6.1 The Nominated Sub-Contractor shall solely bear the cost for stamp duties and
anything incidental thereto.
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
B PART II - PRICING OF PRELIMINARIES ITEMS
shall comply with the condition set down in the Instruction Notes To
Tenderers (INTT).
Allow for submission of samples of materials and workmanship as the S.O.'s
Lump Sum Lump Sum 860.00
Representative may require for this approval before the materials are supplied
and installed or workmanship are embodied in the finished works. All samples
which are approved shall be retained on the Site and shall represent or
Works. All samples shall be cleared away when no longer so required for the
purpose.
2.1 Allow for submission of applications, inspections, tests and approvals including
relevant Authorities having jurisdiction over the Sub-Contract Work. All cost Lump Sum Lump Sum
860.00
b) Test methods must comply with IEEE Std 81- Guide For Measuring Earth
Resistivity, Ground Impedance and Earth Surface Potentials of a
Grounding System.
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
3.0 Inspection, Testing and Commissioning
Allow here or in the rates for the cost of carrying out inspection and tests at
works, testing and commissioning of the installation and the equipment of the
equipment, electricity and fuels, and paying all fees and charges for tests
4.1 The Nominated Sub-Contractor shall be liable and shall indemnify both the
Main Contractor and the Government against any expenses, damage, liability,
loss, claim, or proceedings whatsoever arising from any common law or Lump Sum Lump Sum 10,000.00
5.1 The Nominated Sub-Contractor shall cause to register all local workmen under
accordance with the Employment's Social Security Act 1969 or any subsequent
shall submit Code Number and Social Security Numbers of all workmen under
the SOCSO scheme to the S.O for verification. Lump Sum Lump Sum 8,000.00
The Nominated Sub-Contractor shall make payment of all contributions from
time to time on the first day on which the same ought to be paid and until the
completion of the Sub-Contract Works, and upon demand the Nominated Sub-
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
6.0 Clause 27 - Insurance of Sub-Contract Work
6.1 The Nominated Sub-Contractor shall insure for the full value amount of the
Contractor properly delivered on the Site for use in the Sub-Contract Works)
and keep or have them kept insured against loss or damage by fire, lightning,
explosion, storm, tempest, flood, ground subsidence, bursting or overflowing Lump Sum Lump Sum 10,000.00
of water tanks, apparatus or pipes, aircraft and other aerial devices or articles
dropped therefrom, riot and civil commotion as per described in Clause 26. All
Nominated Sub-Contractor.
Contract Sum to secure the due performance of the obligations under this
8.1 Protect, uphold and maintain all existing and in use pipes, ducts, sewers,
services mains, underground cables, etc. During the execution of the Sub-
Contract Works, unless otherwise directed. If the Nominated Sub-Contractor
discovers any underground cables, pipes, etc, he shall immediately stop work
and report to the S.O's Representative of the findings. The Nominated Sub-
Contractor shall be responsible for making good all damages to the cable,
pipes, etc. and shall indemnify the Government against any claims as a results
Lump Sum Lump Sum 430.00
of such damage.
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
9.0 Sub-Contract Work Programme
9.1 Provide for implementing the Critical Path Method programme in conjunction
with Main Contract Works for planning, monitoring, control of resources and
progress of work shall include :
provide necessary superintendence over the whole site operation for the full
Lump Sum Lump Sum 860.00
duration of the Sub-Contract Works and as long thereafter as the S.O.'s
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
11.0 Resources For Site
11.1 The Nominated Sub-Contractor shall provide and maintain all Personal
Protective Equipment required for the use of the S.O.'s Representative and his
supervisory staff and any other officials complete as specified and complying
with DOSH requirements. All items must obtain approval from the S.O.'s
c) Printing Facilities
Lump Sum Lump Sum 2150 2,150.00
12.1 Allow for providing monthly reports including photographs showing the
the Sub-Contract Works as directed by the S.O.'s Representative. A total of Lump Sum Lump Sum 1,584.00
three (3) sets of reports properly binded and the digital format shall be
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
13.0 Shop / Working Drawings
13.1 Provide for the preparation, submission and thereafter the approval for
construction from the S.O.'s Representative all shop / working drawings for
preparation.
Detail final sub-circuits and switching arrangement, shall be prepared,
14.1 All electrical works e.g. conduits, openings, back boxes, etc. shall be
coordinated (work to be done) with IBS Provider, architectural and structural Lump Sum Lump Sum 860.00
works for implementation of IBS including Modular Coordination at IBS plant.
Breaking, hacking, coring IBS wall/ceiling/slab, cutting holes, making good,
backfilling and permanent reinstatements of damage brickwalls, floors, slabs,
roads, drains, hardstanding, tarmac area, other civil works, etc. if necessary.
15.1 Allow for fees and charges for the employment of an Electrical Services
proposal (with relevant data and calculations) for the electrical protection
Thereafter, if the proposal is agreeable by the S.O.'s Representative, he shall Lump Sum Lump Sum 1500.00
check, test and calibrate accordingly all protective relays and device provided
1994. He shall also prepare, duly sign and submit all certification as required
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
16.0 Clearing and Cleaning of Site
16.1 The Nominated Sub-Contractor shall, upon completion of the work, remove
away immediately from site all plants and surplus materials except those
ordered to be left on the site, together with all rubbish and debris. The site is Lump Sum Lump Sum 430.00
to be restored in a neat, clean and workmanlike manner to the satisfaction of
the S.O.
a) Four (4) sets contained the following documents, properly titled and
bound in hard covers :-
ii) All Product Data and Catalogue of equipment supplied and installed in the
Sub-Contract;
iii) All Supervision and Completion Certificate, and Test Certificate in
compliance with the Electricity Regulations 1994;
vi) All Certificate of Warranties and Guarantees copies issued by the original
equipment manufacturers.
ii) For Non BIM projects: Four (4) sets of Digital Copies of As-installed
drawings in AutoCAD(dwg.) or any other compatible format to be stored
in compact discs or physical digital storage.
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
c) Four (4) sets of Digital Copies of As-installed drawings in Acrobat (.pdf)
to be stored in compact discs or physical digital storage.
d) All original Certificate of Warranties and Guarantees issued by the original
equipment manufacturers.
e) One (1) copy of List of username and password (administrator) for
logging in of ELV and ICT systems / equipments (if applicable)
f) One (1) set maintenance tools as prescribed in the relevant
Specifications.
18.1 Allow for preparation inventory list for equipment installed as per in the Sub-
Contract. The inventory list shall include and not limit to all data and
particulars of the equipment and accessories pertaining to their types, models,
descriptions and quantities.The format shall be in MS Excel of latest version
as per Appendix A of Preliminaries. Two (2) sets of softcopy in CD-RW and
four (4) sets of hardcopy in comb binded shall be submitted to S.O.'s
Representative. Lump Sum Lump Sum 860.00
19.1 Allow for the cost for twelve (12) copies of contract document binding. The
document format shall follow as per JKR standard including stamping fees
Lump Sum Lump Sum 10,000.00
A PRELIMINARIES
(All quantities are PROVISIONAL. Actual quantities will be measured at site.)
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
(RM) (RM)
Collection
To convert existing 11KV belian terminal pole to hot dipped galvanised steel
2 no 1 4,730.00 4,730.00
'H' pole c/w earthing, kicking block, disc insulators and accessories
11KV Air break fuse isolators (ABFI) c/w associated interconecting conductors
3 set 1 14,190.00 14,190.00
on new 11KV 'H' pole
Horizontal direct drilling c/w 2 way 160mm diameter HDPE PN10 pipe sleeves
5 m 30 903.00 27,090.00
for 11KV underground cables road crossings at existing tar sealed road
11kV non-extensible SF6 ring main unit (RMU) c/w earth fault relay at
6 no 2 65,000.00 130,000.00
proposed 11KV indoor substation
1600A 7 way 6 feeder substation pillar c/w 300mm height concrete plinth for
18
indoor substation and at existing platform substation at: -
a) Indoor Substation no 1 18,920.00 18,920.00
b) Existing platform substation no 1 18,920.00 18,920.00
150A 4 way 3 phase SEB standard mini pillar c/w fuses, 300mm hright
19 no 1 9,460.00 9,460.00
concrete plinth and earthing
HDPE PN10 pipe sleeves for road and drain crossings within school site for LV
22
underground cables and incoming road for streetlightings
a) 50mm diameter m 15 107.00 1,605.00
b) 100mm diameter m 35 150.00 5,250.00
160mm dia HDPE PN10 pipe sleeves for road and drain crossings within
23 m 50 176.00 8,800.00
school site for 11KV underground cables
160mm dia HDPE PN10 pipe sleeves for incoming cables into indoor
24 m 15 176.00 2,640.00
substation for 11KV underground cables
50mm dia HDPE PN 10 long bend for incoming 25mm2 underground cables
25
to: -
a) Quarters Unit 1 SEB meter compartment m 16 107.00 1,712.00
b) Quarters Unit 2 SEB meter compartment m 16 107.00 1,712.00
c) Quarters Unit 3 SEB meter compartment m 16 107.00 1,712.00
d) Quarters Unit 4 SEB meter compartment m 16 107.00 1,712.00
e) Kantin meter box m 20 107.00 2,140.00
150W SON Streetlight c/w control gears with accessories on hot dipped
27 galvanised steel planted and armless pole. (Note: The streetlight lantern shall no 10 650.00 6,500.00
be of SEB approved make/model)
10m Hot Dipped Galvanised planted pole, single armless c/w separate service
doors, junction box as per SEB approval, internal wiring using 2.5mm Cu
PVC/PVC cable, 16mm² PVC Green cable, 16mm dia. X 3000mm (L) copper
28 no 10 2,100.00 21,000.00
jacketed (minimum radial thickness 0.25mm) steel core earth electrode,
exothemic welded connection and other accessories as per specifications and
drawings. (Note: The pole shall be of SEB approved manufacturer)
Cost incurred for insurance (contractors all risks and workmen compensation)
31 - L.Sum L.Sum 4,730.00
for HT/LT works in accordance to SESCo requirements.
Minimum 50 x 50mm timber trench covers c/w hot dipped galvanised steel
33 - L.Sum L.Sum 1,892.00
angle iron supports at RMU and transformer room (substation) trenches
Submission of Factory acceptance tests for transformer, RMU and 11KV cables
35
witnessed by SEB
300mm height concrete plinth for SEB LV meter cabinet at external indoor
36 lot 1 946.00 946.00
substation wall (meter cabinet supply and install by SEB)
2 HDPE PN10 pipe sleeves for road crossings and drain crossings
a 100mm diameter m 300 90.00 27,000.00
b 150mm diameter m 50 133.00 6,650.00
3 600mm height clean sand filling to MSB RC trenches - L.Sum L.Sum 1,290.00
600 (W) x 5 (thick) mm rubber mat in front of MSB's full length as per SESCo
4 - L.Sum L.Sum 774.00
requirements
MSB room safety signages (treatment of electric shock) and A1 size MSB
5 laminated As Built drawings c/w aluminium frame and perspex and to SESCo - L.Sum L.Sum 774.00
requirements
Minimum 50 x 50mm timber trench covers c/w hot dipped galvanised steel
6 - L.Sum L.Sum 2,365.00
angle iron supports for MSB room
Minimum 1200A TPN copper busbar (min size), metalclad cubicle board,
current transformers (CTs), LED indicator lights, looping cables, anti
b
condensation heater, Earth fault relays and overcurent relays, MCCB, Surge
Protection Device (SPD), Digital Power Meter (DPM), etc.
Note :-
i) Manufacturer's catalogue, technical
specifications and data for all offered
equipment shall submitted together with
the tender for evaluation. Tender with
incomplete catalogue and specifications
will be rejected.
200 KVAR capacitor unit (dry type and self healing) 525V, 50Hz and 7%
c
Reactor
a) 4 x 10 KVAR
b) 8 x 20 KVAR
Contactor (category AC-6B) with 2N/C auxiliary contacts, 2 no. rapid discharge
d
resistor, etc.
450A TPN copper busbar (min size), looping cables, control cables, current
transformer, and other accessories for the complete system including spare
f
space for complete complete system future units, all incorporated into one
cubicle independent from MSB as per drawing and specification.
300A 4P main MCCB as per drawing and specifications for capacitor bank
g
incoming c/w associated cables
9 Earthing System
50mm X 6mm copper Main Earthing Bar c/w porcelain insulators to mount the
main earthing bar and a transparent protective cover with label engraved and
ii) marked in red 'Main Earthing Bar- Safety Electrical Connections-Do Not L.Sum L.Sum L.Sum 1,505.00
Remove' to cover full length of the main earthing bar.
(MEB shall be Factory Ready)
iii) Earthing conductor copper tape 2 sets 2 X 25mm X 3mm. L.Sum L.Sum L.Sum 559.00
Earth chamber, 16mm dia. X 3000mm (L) copper jacketed (minimun radial
iv) thickness 0.25mm) steel core earth elctrode c/w precast heavy duty concrete Lots 4 387.00 1,548.00
earth chamber & removable concrete cover etc.
v) Test lead 2.5mm2 green cable current probe & potential probe L.Sum L.Sum L.Sum 301.00
Note:-
a) The connection of the copper tape to the earth electrode shall be
exothermic welded connections.
b) The connection of the 2.5mm2 green PVC cable to the earth electrode shall
be by clamp.
13 Factory Acceptance Test for MSB (3 persons for S.O and S.O Representative) - L.Sum L.Sum 2,838.00
123W LED (Min. 11713 Lumen 64 LED) IP66 Streetlight c/w programmable
driver for auto dimming, (100% and 75%) 10KV surge protector, die cast
1 aluminium enclosure with clear glass diffuser and integral gears with no 86 2,900.00 249,400.00
accessories on hot dipped galvanised steel flanged/ and armless pole. (Note:
The streetlight lantern shall be of JMAL approved make/model)
10m Hot Dipped Galvanised flanged pole, single armless c/w separate service
doors with hot dipped galvanised perforated steel baseboard for junction box
and SPD, SPD, modular junction box as per JMAL approved manufacturer,
internal wiring using 2.5mm Cu PVC/PVC cable, street lighting column sticker,
2 label, 16mm² PVC Green cable, 16mm dia. X 3000mm (L) copper jacketed no 40 2,100.00 84,000.00
(minimum radial thickness 0.25mm) steel core earth electrode, exothemic
welded connection and other accessories as per specifications and drawings.
(Note: The pole cable termination box shall be of JMAL approved
manufacturer)
10m Hot Dipped Galvanised flanged pole, double armless c/w separate service
doors with hot dipped galvanised perforated steel baseboard for junction box
and SPD, SPD, modular junction box as per JMAL approved manufacturer,
internal wiring using 2.5mm Cu PVC/PVC cable, street lighting column sticker,
3 label, 16mm² PVC Green cable, 16mm dia. X 3000mm (L) copper jacketed no 23 2,100.00 48,300.00
(minimum radial thickness 0.25mm) steel core earth electrode, exothemic
welded connection and other accessories as per specifications and drawings.
(Note: The pole cable termination box shall be of JMAL approved
manufacturer)
Concrete footings to suit lighting poles as shown in drawings c/w cable entry
4
in / out HDPE 63mm diameter HDPE pipe sleeves.
a) For 10m height pole no 63 172.00 10,836.00
Lighting point in concealed H.I. PVC conduit c/w 2 x 1.5mm2 PVC/PVC cables
8 no 19 116.00 2,204.00
with earth conductor and all other accessories for walkway lightings
IP65 PVC junction box for lighting points termination with underground cables
9 no 1 258.00 258.00
for walkway lightings
40A, 3 phase outdoor distribution boards (IP56) c/w tinned Cu. busbar
(Minimum dimensions: 25 x 6mm for each phase/neutral/earth), MCCB, ELRs,
11 2.5mm2 PVC earth cables for removable enclosure with cable lugs, washer,
24hrs. timers, contactors, digital power meters, IP66 13A switch socket
outlets, 300mm height concrete plinths and specified accessories
63mm dia. HDPE PN10 pipe sleeves for roads and drains crossing for
13 - L.Sum L.Sum 1,032.00
streetlighting cables
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
*Note:-
i) All items supplied must be of local make if they are
locally available and have been approved as per JKR
'emal' list.
ii) All fittings mounted in the ceiling shall be
independently suspended using suitable size of steel
wire and bracket/ hook.
iii) The tenderer is required to submit the catalogues for
the purpose of tender evaluation.
iv) All submain cables shall be run in hot dipped
galvanised steel cable trays/trunkings inside electrical
rooms provided or inside ceiling space, properly and
neatly as to maintain the aesthetical view of the
buildings. All trays and trunking shall be c/w with
accessories for all change of directions and joints and
hung with galvanised steel rods and supports,
suspended from roof trusses with proper steel clamps
on trusses without drilling into trusses.
v) 25 x 3mm earth copper tapes to be provided for all
trunking joints and full length for trays terminated to
switchboards/ distribution boards at both ends
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
7 150mm dia. HDPE PN10 pipe sleeve into building m 12 133.00 1,596.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
g) Flush mounted, 0.5-10V, 1000W rotary dimmer switch nos 8 258.00 2,064.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
C.III.1 Level 1
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
ii) 1 x 17.5W LED T8 bare channel light fitting nos 30 120.00 3,600.00
iii) 2 x 17.5W LED T8 bare channel light fitting nos 3 142.00 426.00
2 x 17.5W LED T8 surface light fitting c/w Al. mirror
iv) nos 125 163.00 20,375.00
reflector
1 X 17.5W LED T8 light fitting c/w polycarbonate
v) nos 6 163.00 978.00
enclosure and polycarbonate diffuser (IP65)
vi) 10W LED red colour flashing light c/w 10W buzzer nos 1 688.00 688.00
LED self-contained emergency light ftg. (3 hours non-
vii) maintained emergency light c/w cable control unit and nos 38 90.00 3,420.00
Nickel Cadmium battery
LED self-contained Keluar light ftg. (3 hours non-
viii) maintained keluar light c/w cable control unit and Nickel nos 17 120.00 2,040.00
Cadmium battery
LED self-contained Keluar light ftg. (3 hours non-
maintained) keluar light with double sided direction
xi) nos 2 120.00 240.00
arrow c/w cable control unit and Nickel Cadmium
battery
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
6 150mm dia. HDPE PN10 pipe sleeve into building m 60 133.00 7,980.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
C.III.2 Level 2
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
ii) 1 x 17.5W LED T8 bare channel light fitting nos 27 120.00 3,240.00
iii) 2 x 17.5W LED T8 bare channel light fitting nos 10 142.00 1,420.00
2 x 17.5W LED T8 surface light fitting c/w Al. mirror
iv) nos 68 163.00 11,084.00
reflector
1200 x 600mm, recessed 53W LED panel light c/w opal
v) nos 48 254.00 12,192.00
diffusser and integral gear
1 x 17.5W T8 LED light c/w polycarbonate enclosure
vi) nos 1 163.00 163.00
and polycarbonate diffuser (IP65)
LED self-contained emergency light ftg. (3 hours non-
vii) maintained emergency light c/w cable control unit and nos 33 90.00 2,970.00
Nickel Cadmium battery
LED self-contained Keluar light ftg. (3 hours non-
viii) maintained keluar light c/w cable control unit and Nickel nos 16 120.00 1,920.00
Cadmium battery
LED self-contained Keluar light ftg. (3 hours non-
maintained) keluar light with double sided direction
xi) nos 4 120.00 480.00
arrow c/w cable control unit and Nickel Cadmium
battery
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
C.III.3 Level 3
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
d) Flush mounted, 0.5-10V, 1000W rotary dimmer switch nos 2 666.00 1,332.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
6 150mm dia. HDPE PN10 pipe sleeve into building m 12 133.00 1,596.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
iii) 2 x 17.5W LED T8 bare channel light fitting nos 12 142.00 1,704.00
2 x 17.5W LED T8 bare channel light fitting c/w Al.
iv) nos 48 163.00 7,824.00
mirror reflector
1 X 17.5W LED wall mounted T8 light fitting c/w
v) polycarbonate enclosure and polycarbonate diffuser nos 12 163.00 1,956.00
(IP65)
2 X 17.5W LED T8 light fitting c/w polycarbonate
vi) nos 1 228.00 228.00
enclosure and polycarbonate diffuser (IP65)
vii) 10W LED red colour flashing light c/w 10W buzzer nos 3 688.00 2,064.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
5 150mm dia. HDPE PN10 pipe sleeve into building m 8 133.00 1,064.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
iii) 2 x 17.5W LED T8 bare channel light fitting nos 1 142.00 142.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
5 150mm dia. HDPE PN10 long bend into building m 12 133.00 1,596.00
C.VII Kantin
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
5 100mm dia. HDPE PN10 long bend into building m 12 112.00 1,344.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
3 80mm dia. HDPE PN10 pipe sleeve into building m 12 60.00 720.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
4 150mm dia. HDPE PN10 pipe sleeve into building m 80 133.00 10,640.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
3 100mm dia. HDPE PN10 Long Bend into the building m 24 112.00 2,688.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
3 PVC cable with earth conductor and all accessories with nos 4 107.00 428.00
10A, weatherproof switch.
8 100mm dia. HDPE PN10 Long Bend into the building m 8 107.00 856.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
5 100mm dia. HDPE PN10 pipe sleeve into building m 8 112.00 896.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
7.0 50mm diameter HDPE PN10 pipe long bend for copper
tape at drain crossings from test clamps to earth m 20 60 1,200.00
chambers
500mm (h) x 12mm dia copper air terminal c/w flat base
2.0 or ridge saddle interconnecting with 25mm x 3mm no 7 258 1,806.00
copper tape.
7.0 Earthing tests c/w submission of test reports - L.Sum L.Sum 473.00
8.0 50mm diameter HDPE PN10 pipe long bend for copper
tape at drain crossings from test clamps to earth m 100 60 6,000.00
chambers
500mm (h) x 12mm dia copper air terminal c/w flat base
2.0 or ridge saddle interconnecting with 25mm x 3mm no 13 258 3,354.00
copper tape.
6.0 Earthing tests c/w submission of test reports - L.Sum L.Sum 473.00
7.0 50mm diameter HDPE PN10 pipe long bend for copper
tape at drain crossings from test clamps to earth m 80 60 4,800.00
chambers
500mm (h) x 12mm dia copper air terminal c/w flat base
2.0 or ridge saddle interconnecting with 25mm x 3mm no 10 258 2,580.00
copper tape.
7.0 50mm diameter HDPE PN10 pipe long bend for copper
tape at drain crossings from test clamps to earth m 90 60 5,400.00
chambers
500mm (h) x 12mm dia copper air terminal c/w flat base
2.0 or ridge saddle interconnecting with 25mm x 3mm no 4 258 1,032.00
copper tape.
7.0 Earthing tests c/w submission of test reports - L.Sum L.Sum 473.00
8.0 50mm diameter HDPE PN10 pipe long bend for copper
tape at drain crossings from test clamps to earth m 80 60 4,800.00
chambers
3A-PA
Page 78 of 109 AND SOUND REINFORCEMENT
SERVICES
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
6 PVC junction box for cable termination at ELV risers no 2 236 472.00
3A-PA
Page 79 of 109 AND SOUND REINFORCEMENT
SERVICES
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
5 PVC junction box for cable termination at ELV risers no 4 236 944.00
4 PVC junction box for cable termination at ELV risers no 4 236 944.00
4 PVC junction box for cable termination at ELV risers no 1 236 236.00
A.V Kantin
4 PVC junction box for cable termination at ELV risers no 1 236 236.00
3A-PA
Page 82 of 109 AND SOUND REINFORCEMENT
SERVICES
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH
GURU DI SMK LAWAS, LAWAS, SARAWAK
B.V Kantin
1. Power amplifiers
a) 2 x 300W @ 8 ohms no 2 3311 6,622.00
b) 2 x 400W @ 8 ohms no 1 4257 4,257.00
A.V Surau
1. Power amplifier
a) 150W no 2 3311 6,622.00
2. Speakers
Active Vari Directional Line Array Loud Speaker, 4"
coaxial (8 x 1 driver), 8 x 15W (Class D, full bridge
a. built in amplifier) + 4" full range transducers (4 x 2 no 2 2064 4,128.00
drivers), 4 x 25W (Class D full bridge built in
ampflier) - (power consumption 28W)
6W ceiling speakers c/w fire dome and matching
d. no 5 90 450.00
transformer
30W weatherproof horn speakers c/w mounting
brackets and IP65 PVC junction box for and 2 x
e. no 4 731 2,924.00
2.5mm2 Cu PVC/PVC cables with H.I UPVC flexible
conduits for each speaker
13 PVC junction box for cable termination at ELV risers no 1 258 258.00
Supply and install G.I with epoxy paint finish for railing
11 lot 1 1462 1,462.00
and tracks with supports/ truss.
Total 89,146.00
5 Cablings (6m length for each unit) and accessories no 300 365 109,500.00
2 UHF Antenna c/w galvanized steel bracket with epoxy finish no 4 473 1,892.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
To supply and install UTP Cat 6A, 23AWG (EIA/TIA) low smoke zero
halogen (LSZH) cablings c/w high impact UPVC conduits/hot dipped
1
galvanised steel trunking, 1-gang RJ45 angular faceplate, modular
jack and termination at both ends
Supply and install UTP Cat 6A 23 AWG (EIA/TIA) Low Smoke Zero
4 Halogen (LSZH) factory terminated patch cords c/w RJ45
connectors and boots
a) 2.0 meter (patch panel to access switch) no 51 107.00 5,457.00
b) 2.0 meter (faceplate to end device) no 51 107.00 5,457.00
c) 2.0 meter (Between switches, servers and firewalls) no 3 107.00 321.00
5 Supply and install single mode fibre optic patch cords (10GBE)
a) 6 core fibre optic patch cords no 5 172.00 860.00
6 core single mode fire optic cables in hot dipped galvanised steel
7 m 70 47.00 3,290.00
trunkings to Makmal Komputer 3
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
15U wall mounted rack (600 (W) x 800 (D))mm c/w factory
9 nos 1 1,892.00 1,892.00
installed 3nos 13A switch socket outlets
Supply and install 1 phase, 3.0kVA rack mount UPS c/w 30 min full
10 load with 50% battery discharge with SNMP enable and 15A power nos 1 7,310.00 7,310.00
cable for 15A 3 pin switched socket outlets and surge arrestor
Supply and install 1 phase 1.0kVA rack mount UPS c/w 30 min full
11 load with 50% battery discharge with SNMP enable and 15A power nos 1 3,784.00 3,784.00
cable for 15A 3 pin switched socket outlet and surge arrestor
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
16 Wireless Controller c/w configuration for wireless access points nos 1 17,200.00 17,200.00
16mm2 PVC green colour earth cables from ICT racks frame earth
20
to earth bars
a) Makmal Komputer 1 & 2 ICT Room lot 1 774.00 774.00
b) Makmal Komputer 3 ICT Room lot 1 774.00 774.00
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
To supply and install UTP Cat 6A, 23AWG (EIA/TIA) low smoke zero
halogen (LSZH) cablings c/w high impact UPVC conduits/hot dipped
1 no 9 279.00 2,511.00
galvanised steel trunking, 1-gang RJ45 angular faceplate, modular
jack and termination at both ends
Supply and install UTP Cat 6A 23 AWG (EIA/TIA) Low Smoke Zero
5 Halogen (LSZH) factory terminated patch cords c/w RJ45
connectors and boots
a) 2.0 meter (patch panel to access switch) no 9 107.00 963.00
b) 2.0 meter (faceplate to end device) no 9 107.00 963.00
6 Supply and install single mode fibre optic patch cords (10GBE)
a) 6 core patch cords no 1 172.00 172.00
9U wall mounted rack (600 (W) x 800 (D))mm c/w factory installed
8 nos 1 1,892.00 1,892.00
3nos 13A switch socket outlets
Supply and install 1 phase 1.0kVA rack mount UPS c/w 30 min full
9 load with 50% battery discharge with SNMP enable and 15A power nos 1 3,784.00 3,784.00
cable for 15A 3 pin switched socket outlet and surge arrestor
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
16mm2 PVC green colour earth cables from ICT rack frame earth to
13 lot 1 774.00 774.00
earth bars c/w high impact UPVC flexible conduits
To supply and install UTP Cat 6A, 23AWG (EIA/TIA) low smoke zero
halogen (LSZH) cablings c/w high impact UPVC conduits/hot dipped
1 no 142 279.00 39,618.00
galvanised steel trunking, 1-gang RJ45 angular faceplate, modular
jack and termination at both ends
iii) Ap bracket shall be hang with mounting rod to the floor slab / wall
iv) Lockable
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
Supply and install UTP Cat 6A 23 AWG (EIA/TIA) Low Smoke Zero
5 Halogen (LSZH) factory terminated patch cords c/w RJ45
connectors and boots
a) 3.0 meter (faceplate to Wireless AP) no 4 107.00 428.00
b) 2.0 meter (patch panel to access switch) no 142 107.00 15,194.00
c) 2.0 meter (faceplate to end device) no 142 107.00 15,194.00
d) 2.0 meter (PABX and MFTB) no 2 107.00 214.00
d) 2.0 meter (PABX and switch) no 1 107.00 107.00
6 Supply and install single mode fibre optic patch cords (10GBE)
a) 6 core patch cords no 7 150.00 1,050.00
15U wall mounted rack (600 (W) x 800 (D))mm c/w factory
8 nos 1 1,892.00 1,892.00
installed 3nos 13A switch socket outlets
.
Supply and install 1 phase 1.0kVA rack mount UPS c/w 30 min full
9 load with 50% battery discharge with SNMP enable and 15A power nos 1 3,870.00 3,870.00
cable for 15A 3 pin switched socket outlet and surge arrestor
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
Supply and install 1 phase, 3.0kVA rack mount UPS c/w 30 min full
13 load with 50% battery discharge with SNMP enable and 15A power nos 1 7,740.00 7,740.00
cable for 15A 3 pin switched socket outlets and surge arrestor
16 IP PBX license operating software for minimum 2 years - L.Sum L.Sum 5,160.00
16mm2 PVC green colour earth cables from ICT rack frame earth to
20 lot 2 516.00 1,032.00
earth bars c/w high impact UPVC flexible conduits
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
To supply and install UTP Cat 6A, 23AWG (EIA/TIA) low smoke zero
halogen (LSZH) cablings c/w high impact UPVC conduits/hot dipped
1 no 6 279.00 1,674.00
galvanised steel trunking, 1-gang RJ45 angular faceplate, modular
jack and termination at both ends
Supply and install UTP Cat 6A 23 AWG (EIA/TIA) Low Smoke Zero
4 Halogen (LSZH) factory terminated patch cords c/w RJ45
connectors and boots
b) 2.0 meter (patch panel to access switch) no 6 107.00 642.00
c) 2.0 meter (faceplate to end device) no 6 107.00 642.00
5 Supply and install single mode fibre optic patch cords (10GBE)
a) 6 core patch cords no 1 150.00 150.00
9U wall mounted rack (600 (W) x 800 (D))mm c/w factory installed
7 nos 1 1,892.00 1,892.00
3nos 13A switch socket outlets
Supply and install 1 phase 1.0kVA rack mount UPS c/w 30 min full
8 load with 50% battery discharge with SNMP enable and 15A power nos 1 3,784.00 3,784.00
cable for 15A 3 pin switched socket outlet and surge arrestor
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU DI
SMK LAWAS, LAWAS, SARAWAK
16mm2 PVC green colour earth cables from ICT rack frame earth to
12 lot 1 473.00 473.00
earth bars c/w high impact UPVC flexible conduits
HDPE PN10 long bend c/w steel draw cable for duct
3
entry into all buildings
a) 1 way m 40 64 2,560.00
1 Duct Seals
To supply and install duct seal for all cable entry to all Lump Lump
1.1 946.00 946.00
buildings. Sum Sum
2 Fire Barriers
6.0 TRAINING
6.1 Comprehensive training as per specification for :
6.1.1 LV System
i. User training, operation of all electrical system.
Lump Lump
-
ii. Principle operation and maintenance procedure for Sum Sum
electrical system
PEMASANGAN ELEKTRIK UNTUK PEMBINAAN GANTIAN PENUH 36 BILIK DARJAH, 4 UNIT RUMAH GURU
DI SMK LAWAS, LAWAS, SARAWAK
3 OTHERS
3.1 Any other work which are not mentioned Lump Lump
above but required to complete the work as Sum Sum - -
per drawing and specification.
1)_______________________________
2) _______________________________
3) ______________________________