Life safety overall review points. Date 7.01.

2024

1. Stair 11 not found as mentioned by ASG/BH in the drawing and report noted in the comment
no.2 (STAIR 11 IS SHOWING ON SHEET - DG-NCD-400-0000-AYS-DWG-AR-2B1-0011012 LIFE
SAFETY PLAN -SOUTH CAMPUS B1) & King Salman University (sharepoint.com)
See this link DG-NCD-400-0000-AYS-DWG-AR-2B1-0011012_PDF.pdf (sharepoint.com)
2. No open atriums or courtyard noted as mentioned by ASG/BH – correct.
3. Report updated as mentioned in point no 5a.

4. Occupancy load in drawing Not matching with report as mentioned in Point 5b

DGCL - Diriyah Gate Company Limited - DG-NCD-400-0000-AYS-


DWG-AR-2B1-0011011_PDF.pdf - All Documents (sharepoint.com)
5. As per SBC 201 table 1006.2.1 design is not complying to the max 23m common path of egress
travel as noted by JH as per point no 6.

DGCL - Diriyah Gate


Company Limited - DG-NCD-400-0000-AYS-DWG-AR-2L0-0011020_PDF.pdf - All Documents
(sharepoint.com)

6. As per point no.8 Open


Collaboration is between the two
exits hence ASG/BH seems to have
a correct assessment.
DGCL - Diriyah Gate Company
Limited - DG-NCD-400-0000-AYS-
DWG-AR-200-0011035_PDF.pdf -
All Documents (sharepoint.com)
7. As per point no 10. As per SBC section 1009.8 two way communication is required as stated by
JH.

8. All other comments had been addressed as evidence from the report listed from point no1 to 29
under Site plan and Drawings section.