SPECIFICATION AND
ESTIMATING, COSTING,
Bricks. Brick walls u n .to
Thickness of Wall for Dierent Sizes of which shall be coneian
4-8. multiples of hall
brick
idered y
shall be measured in
including 3 bricks in thick
of the
actual thickncss as shown in the
he inclusive of the mortar joints as 10 cm actual thickness of wall b
irrespective
in thickness, the
heiow For wallin which is more than ahree 1
bricks
0.5cm and above
shall
including
be taken as
as 1 cm
mcasured to the neare one centimetre.
Fractions an
fractions below 0.5 cm shall be neglected.
Wall Thickness
Type of brick
(Size of brick considerod) brick 1 brick 1bricks 2 brick 2 bricks 3 bricks
a Modular bnck- 40 cm 50 cm 60 cm
10 cm 20 cm 30cm
20cm x 10cm x 10cm
(23cmx 1lcm x 7.5cm) (11 cm) (23cm) 34 cm) (45 cm) (56cm)| (67cm)
4-9. Minimum Thickness of the walls when Stress calculations are not toh
made
The thickness of wall depends on unsupported height and length of the wall, load and win
pressure acting on the wall and also quality of bricks and mortar used for the wall.
The recommended minimum thicknesses of walls are given below provided the length of wi
as memtioned shall be measured between buttressing or cross-walls properly bonded built into the m
walls to give lateral support and shall not be more than 10 metres. Thickness of the wall shall noth
less than 1/16th of the storey height and storey height is not more than 4.8m. The walls external o
iniernal shall be built in cement mortar 1:6or lime mortar 1: 3 with burnt first class bricks th
concreie blocks. The thickness of me
plinth walls shall be 10cm more than superstructure wals
menuoned below.
1.35 cu m
Lime
Concrete
30cm x 90cm =
4.1st class
brickwork in superstructure 3.5 cu m
CROSS SEGTION
20cm x 3.5m
=
Sm x
1.00 sq m. Outside of Wallplinth Offset
Sm x 20cm =
D.P.C. =
5. 2.5cm thick
But to
be estimated as above.
Quantities can
breadth and height against 5.0m
denote the respective length, after ruling out
are prepared
the dimensions
estimates PLAN
measurement sheets
as below.
FIG. 4-3
CALCULATION OF QUANTITIES
MEASUREMENT
AND Total
DETAIL Quantity
Breadth Height
No. Length or Depth
Iem Description of item 0.70cu m
20 cm
0.70cu m
No. 70 cm
Earth work in excavation
5m
1.
2 1st. class brickwork (1:4)
in foundation and plinth 20 cm 0.50
5m 50 cm
Ist. footing 50cm 20 cm
0.40
5m 40 cm
2nd. footing 40cm 1.35
90 cm 2.25 cumn
5 m 30 cm
Plinth wall 30cm 3.5 cu m
45
total length has been cm
taken in the estimate
and further clarified in 55cm
the explanatory notes. FIG. 4-8. bcm-
FIG. 4-7.
PLAN SECTION ON B-B
DETAILS OF MEASUREMENT AND
QUANTITIES
Item Description of
No. Length Total
no. Item Breadth Height Quantity Explanatory notes
1. Lime concrete 3.95 m 0.55 m 0.20 m 0.44 0.44cum 3.95 2.5+(2-.55)
in foundation
2 Brickwork for
5..
(a) 45 cm layer 3.95 m 0.45 m 040 m 0.71 3.95 (2.5-0.05) +
(6)40 cm layer 3.90m 0.40 m 0.50 m 0.78 (2-0.05-0.45)
.0 3.90 (2.5-0.10) +
3.90 m
(2-0.10-0.40)
m
(c) 30 cm layer
0.30 0.50 m 0.59 3.90 (2.5 -.15)+
9. (d) 20 cm (2-0.15-0.30)
layer 4.00 m .20 m 0.40 m0.32 4.00 (2.5 -0.15)+
2.40cum (2-0.15-0.20)
VALUATION
5A SPECIFICATION AND
ESTIMATING, COSTING,
Works
4-10. Different Methods for Estimating Building
The quantities of various items such as earthwork
in excavation, foundation concrete, brickwork
in foundation and plinth, brickwork in superstructure, etc. can be estimated by any of the following
three methods:-
method or P.w.D. method
(1) Long and Short wall or 'out-to-out' & 'in-to-in'
(2) Centre line method.
(3) Crossing method.
-
(2) Centre line method - In this method calculate the total centre line length of walls in a building and
multiply the same by the breadth and depth of the respective item to get the total quantity at a time. For
different sections of walls in a building, the centre line length for each type shall be worked out separately
In case of partition or verandah walls joining the main walls, the centre line length shall be reduced by half
of the breadth of the layer of main wall that joins with the partition or verandah wall at the same level Number
of such joints are studied first to calculate the centre line length.
By this method estimates may be prepared more quickly and this method is as accurnte as the otne
methods Only in the case of an unsymmetrical wall which is generally rare, no advantage may be claimed
by this method over others as the centre line length varies at every layer. But to estimate circular. hexagonal
octagonal. etc. shaped building this method is specially useful
(3) Crossing Method- In this method calculate the overall perimeter of the building and subtract from
this, four times the thickness of the wall to obtain the centre line length
Internal walls are grouped separately to their sections and measured in between the internal faces of tn
main wall at that level
Principally this method is the same as the centre line method but differs in the process of
find the centre line lengths calculation
English Method of taking out quantities- The
dimension sheet used for taking-off is
foolscap sheet divided into main sections each section
having four columns. Column (1) is terme
timesting" and is used for setting the number of the item. Column (2) is known'dimension column
In this column measurements are wntten Column( 5) is called 'squaring column'.
Quantities worked o
5
u09
W
O/0 N2°E-
08 0xx2-2°E =
TTVM
LHOHS
08
08
SPECIFICATION AND
VALUATION
56 ESTIMATING, COSTING,
n case of foundation concrete, masonrywork with different footings or for superstructure walls
wall is symmetrical (as
to centre lengths remain constant, provided the section of the
centre to centre lengths are to
strated in the next article). But for unsymmetrical sectioned wall the centre
be calculated for each fooing individually.
Centre line the method- Fig. 4-10 represents plan and section of the samc rench as in the previous
method which is 80 cm wide and 60 cm deep. It is required to calculate the volume of earthwork for the
trench
Centre line for long wall = óm - half trench width from each side = 6m - 40cm 40cm = 5.20Om
6m
a
G L
80
A
80
cm
80cm
SECTION A-A
(ENLARGED)
CENTRE LINE
PLAN
FIG. 4-10
Centre line for short wall = 4m - 40cm 40cm = 3.20m
Total length of centre line of all walls = 2(5.20+ 3.20) = 16.8m
. Earthwork in excavation = Sum of centre line x width x depth
= 16.8m x 80cm x 60cm = 8.064 cu m
Mathematically the same result as in previous method of 8.064 cu m is obtained. But for a clear
conception let us investigate how the whole earthwork is considered by the centre line method if work
preceeds along the centre lines by means of a diagram as shown by shaded lines in the above figure.
Following the Fig. 4-10 line ab + bc + cd + da = total length of centre line. Let us first
excavale the line 'a' to 'b' with 40 cm width on each side, but not beyond 'a' or b'. Similarly
excavate lines bc, cd and da. Investigating the excavation follow ing the shaded lines it is observed that
blocks in which the letters a, b, c ,and d are marked have not been considered at all i.e. it appcars that
these blocks are remaining unexcaved, whereas biocks opposite to them have been consideredtwice (as
shown by double haiched lines). Now, the adjacent block of a which has been considered twice may
represent once its equal and opposite block 'a'. Similarly the Blocks b', 'c' and 'd' are to be renresented
by their respective adjacent and equal blocks. Therefore, by centre line method the entire work has been
considered and no portion has been left ou without excavation or considered twice. It is important to
note that at corners of trench or walls n0 addition or subiraction of the centre line is required. port
wS'2
Jworug
w'2
w 09
wT2.-
1 wo wou
ISIP 3/5 wo8'2
wS'Z
wp'
wç*2
wg2-
AND VALUATION
62 ESTIMATING, COSTING, SPECIFICATION
method-
Long and Short wall
Item Description of item No. |Length|Breadth HeightQuantiy Explanatory notes
m m
No.
1. Earthwork in excavation 15.104.10 2.50 52.28 cum
2. Brick flat soling 5.10 4.10 20.91 sqm
Cement concrete (1:2:4) in
foundation 5.10 4.10 4.18 cu mn
4 Ist class brickwork in cement|
mortar
40 cm long walls 4.80 0.40 0.80 3.07 4.80 4+2 0.40
40 cm short walls 3.00 0.40 0.80 1.92
30 cm long walls 4.60 0.30 1.20 3.31
30 cm short walls 3.00 0.30 1.20 2.16
20 cm long walls 4.40 0.20 0.60 1.06
20 cm short walls 3.00 0.20 0.60 0.72
Total |12.24 cum
Estimates for item nos. 5 to 7 are same as that worked out by centre line Note that for such
unsymmetrical walls estimation by adopting long and short wall method is easiermethod.
than centre line method
Example 4. Estimate of a Symmetrical Boundary wall-
-20 M 8024
Lscm
2.5M SEC.OF
- PANEL
Cm
20cm F204
cm
20cm 30
cm
15cm
50cm
-2-5MH SECTION-BB
20cm 20cm
10cm TH
PANEL
100-2M
50-1 M T
50.1 M-
GATE
25M
FIG. 4-14
PLAN ON XX
Estimate the cost of the boundary wall from the given
drawing Fig. 4-14 and specifications.
-
bumt
General specification - Foundation- Soling 2nd class bricks. Cement
brick chips 1:4:8. Masonry -Ist class brickwork in cement mortar 1:6. concrete witn otclass
brickwork in cement mortar I:6. Coping on thewall-cement concrete withSuperstructure wall hing
inside and outside -cement pointed l:4. Kates - Take local current rates. stone chips 1:2:4. Wall Tim
METHOD OF BUILDING ESTIMATE 63
Centre line length 2[(100.2 -0.20)+ (130.2 -0.20)] =460m [See No. (3) of page 69]
For earthwork in excavation after deducting gate opening 460-(2.5-2 x0.10) +2x0.15 (offsets) 458 m
Example - 5. Quantity estimate of an unsymmetrical boundary wall abutting the boundary land.
2 0 M- 80-2 M-
cm
E
G.
20 cm
****|
20cm 30 cm-
15 cin
20cm
25cm D.P.c
70cm 70cm
P
70cm GL.
7
Jcm
85
PLAN FOR FOUNDATION TRENCH 50cm
LIMECONC
FIG.4-17
70 cm
SECTION-XX
=
Ceatre line method : The total length of centre line wall
length of centre line for the partition wall. Length of centre line for the main outc
x
=2( 6.60 -2 x 020/2+4.40-2 x
020/2)+4.40-2 0.20/2=2(6.40+4.20) +420 25.4
METHOD OF BUILDING ESTIMATE 67
For earthwork in excavation from the foundation plan it is found that where the centre line of the
partition wall joins with the centre line of the main outer wall at the same level the portions AB and CD from
the centre line of the partition wall has already been excavated for the main wall. So these
portions each equa
to the half of the trench width shall be deducted from the total length of centre line 25.40 m. Otherwise, excess
quantity will be estimated.
So, the actual length ofcentre linefor earthwork in excavation =25.40-2 x70-24.70 m.
To estimate earthwork thi_ centre line length shall be multiplied by its breadth and depth.
As the foundation concrete of the partition wall joins with the main wall at the same level and the
width of earthwork and concrete work is same the total length of centre line 24.70 m remains constant for
concrete work.
For brickwork of differentfootings the same principle ie. deduction by half the width of footing with
which the partition wall joins at the same level shall be made per junction as shown in fig. 4-16(B).
Thus,centre line lengthfor brickwork,Ist footing 50cm -25.40-2x=24.90 m; for 2nd footing
40 cm =25.40-2x25 m and so onfor 30 cm wall.This net centre line length shall be multiplied by
the respective breadth and height to estimate the quantity.
Item Description of item No. Length Breadth Height Quantity Explanatory notes
No. m m m
(b) Long and short wall method.- Referring to the plan of Fig. 4-17
Centre to centre length of long walls = (3.00+0.20 +3.00) +2 x0.20/2 6.40 m
Ttem Description of item No. Length Breadth Height| Quantity Explanatory notes
No. m
m m
1. Earthwork in excavation
Long walls 2 7.10 0.70 90 8.95 7.10 6.40 +2x 0.70/2
Short walls 3 3.50 0.70 0.90 6.61 3.50 = 4.20-2x 0.70/2
Total 15.56 cu m
2. Lime concrete in foundation
Long walls 7.10 0.70 0.20 1.99 |Lengths same as earthwork
Short walls 3.50 0.70 0.20 1.47 for same width at a same level
Total 3.46 cu m
3. 1st class brickwork
in foundation and plinth
Longwalls
Ist footing 50 cm 2 .90 0.50 0.20 1.38 6.90 6.40 +2 x0.50/2
2nd footing 40 cm 6.806.80 0.40 0.20 1.09 6.80 6.40 +0.40
Plinth wall 30 cm 2 6.70 0.30 0.50 2.01
Short walls
lst footing 50 cm 3.7 0.50 0.20 1.11 |3.70 =4.20 -0.50
2nd footing 40 cm 3.80 0.40 0.20 0.91 3.80 4.20-0.40
**
Plinth wall 30 cm 3 3.90 0.30 0.50 1.76
Total 8.26 cu m
4. 2.5 cm thick D.P.C.
Long walls 6.60 0.20 2.64
Short walls 2 6.60 6.40 +0.20
3 4.00 0.20 2.40 |4.00 4.20 -0.20
Deduction for door openings .20 0.20
0.48-ve
Total 4.56 sq m
1st class brickwork
in superstructure
Long walls 6.60 0.20 30 8.71
Short walls 3 4.000.20 3.30 7.92
Deduction for openings Same as c.L method
2.16-ve)
Total 14.47 cu m
ESTIMATING, COSTING, SPECIFICATION AND VALUATION 69
Example-3. The plan for parapet walls of a roof is shown in Fig. 4-13. Estimate the
quantity of brickwork of the parapet wall for a height 1.2m
(1) Long and Short wall method-
llm
Considering all horizontal walls as
Long wall measuring out-to-out
Total length of Long walls =
6m+(3m +2 x 10cm) + Sm + (2m + 10cm) FF2
11 m + (1.5m + 10cm) + (2.5m + 10cm) =
31.5m
1.S
2.5m-
Considering all vertical walls as Short walls
measuring in-to-in
Total length of Short walls = (4m -2x10cm) 10cm
+ 1.5m + (5m-2x10cm) + (2.5m -10cm) +
(2.5m-10cm) + (7.5m-2x10cm) + (3m-10cm) 10em
25.1m
Total length of the parapet wall
.31.5m + 25.1m = 56.6m
ROOF PLAN
Quantity of 10cm brickwork
56.6m x 1.2m = 67.92 sq m. FIG. 4-17.
óm = + 2.5m + 3m + 2.5m + 5m
(2) Crossing method:- Outside perimeter of the wall
+ Sm 57m =
+ 1.5m + 2.5m
+7.5m + 2m + 3m + l1m + 4m + 1.5m
=
=
Deduct four times the thickness of wall 57m-4x10cm 56.6m
=
= 67.92 sq m.
56.6 x 1,2m
Quantity of 10cm brickwork in this as that of crossing
Centre line method : The process of calculation is same
(3) corner of the wall, from outside, reduce the outer
line from a
method. Because to reach the centre and
of a wall both horizontally vertically i.e reduce the outer
dimensions by half of the thickness be formed
traverse can by four corners. So the
corner. A closed
dimension by wall thickness for one
four times the thickness of the wall to
wall should be reduced by
length of outer perimeter of the number of bends beside the four comers
centre line. There may
be any
calculate the total length of-the at such other corners as explained in the
addition or subtraction is necessary
on the traverse but no
previous article earthwork.
dimensions by crossing or centre line method
of centre line from inner
To calculate the length with the total inside length.
of wall is to be made along
addition of 4 times the thickness outer walls of buildings having samne
brickwork in superstructure for
Estimates from earthwork to Thus estimate for cornice or any such work
of the above methods.
section can be made by any one the process of calculations by any one of
of a building can also be done adopting
around the perimeter
the above methods.
In of wall:
of Building Estimate: this process calculate (1) the total leneth
-
(4) A practical process superstructure wall with D.P.C. plastering and
Cost of wall per unit length up to plinth levelß (5) Cost or the unit cost by the total length of wall
(2)
finishing per unit length; (4) Work out
the total cost by multiplying
the roofing with ceiling plastering, flooring,
for opening portions; (o)tnus ind out cost tor
(5) Deduct the cost tne cost for the respective total areas; (8) by addine
areas; (/work
door and window shutters for unitestimate Out total
ora building can be prepared by persons those who know the unit
all these costs a closed detailed
records.
cost from their previous
SPECIFICATION AND VALUATION
70 ESTIMATING, COSTING,
from the Main Wall.
(B) Partition and Verandah dwarf walls having Cross Section Different
the given plan and sections
Estimate the
of a two roomed building from
quantities of the following items
shown in the 4-18 and Fig. 4-19.
Fig.
(2) Lime concrete in foundation. (3) Ist class brickwork
(1) Earthwork in excavation in foundation.
in 1:6 cement mortar in foundation and plinth. (4) 2.5 cm thick damp proof course and (5) Ist class
brickwork in 1:6 cement mortar in superstructure.
W
D 1x2.Im
W=1.2x1.5m
20 ROOM ROOM
3.5m x3.5m 3.5m x4.8 m
50 cm
40cm D
60cm vER
60cm 60cm
80cm
PLAN
SEC AA SEC.BB SEC-CC
FIG.4-18
FIG.4-19
-
a
because
for all items works in this estimate, of
(This length of
centre line remains constantline is required).
no addition o r subtraction of the length centre of
walls. = 3.80 m
For partition and verandah
=
Partition wall 3.50 +2 x 0.30/2 3 . 7 5 mm
= -0.30/2 -0.30/2
Verandah front (3.5 +0.20 +0.30 +0.05)
=
+ 0.30/2 = 1.35 m
Verandah side 1.35 -0.30/2
Total 8.90m
=
4 nos. (marked by stars)
the main wall
Number ofjoints with with whicn u
half of the width from the corresponding section ofthe main wall
(For each joint occurs when three walls meet at a place)
deducted. Note that a joint
at the same level shall be
= 7.3 m.
line for earthwork 8.90 -4 x 0.80/2
Length of centre
= m. S nol
8.90 - 4 x 0.60/2 =7.70
concretework
Length of centre line for and verandah dwart wa ai
line length for the concrete work for the partition ach
[Note that the centre Joins with the Ist footing 60 cm brickwork for o
earthwork, because uhe same deducted
same as that for 4-18 width cm is
the each section). So, halfthe of 60
same level al joint (see lig.
wall at the
joint
METHOD OF BUILDING ESTIMATE 71
DETAILS OF MEASUREMENT AND CALcULATION OF QUANTITIES
Item Description of item No. Length Breadth|Height Quantity Explanatory notes
No. m m m
Earthwork in excavation in
foundation
Main wall 25.20 0.80 0.90 18.14
Partition and verandah
walls 7.30 0.60 0.70 3.07
Total 21.2lcu m
2. Lime concrete in foundation
Main wal 25.20 0.8 0.20 4.03
Partition and verandah walls 7.80 0.60 0.20 0.94
Total 4.97 cu m
3. Ist class brickwork in
foundation and plinth
Main wall
Ist footing 60 cm 25.20 0.60 0.20 3.02
2nd footing 50 cm 25.20 0.50 0.20 2.52
Plinth wall 40 cm 25.20 0.40 0.70 7.06
Partition and ver. walls
Ist footing 40 cm 17.900 0.40 0.20 0.63 7.90 8.90 -4x 0.50/2
Plinth wall 30 cm 8.10 0.30 0.70 1.70 8.10 8.90 -4x 0.40/2
Total 14.93cu m|
4.
Damp proof course
25 cm thick
Main wal 25.2 0.30 7.56 3.50 3.80 -2x 0.30/2
Partition wall 50 0.20 0.70
x
7.50
or entire 2 +0.20) +2x-
Entire back front, Long walls (3.5 2
=
-5.10 m
Entire 4.8 +2.x
right or left, Short walls 2
For partition and verandah walls
0.30 =3.80 m
Partition, Short wall =3.5 +2 2
0.30 0.30 3.75 m
Verandah front, Long - Short wall (3.5 +0.20+ 0.30 +0.05)- 2
= 1.35 m
=
Verandah left side, Short wall 1.35 -0.30, 0.30
with the 30 cm main long wall. So this end
verandah joins front wall
(Note that the right hand side of So the verandah front wall is named
verandah front wall is treated as Short while the other end as Long.
of
as Long-Short wall as described in the article 4-10.)
CALCULATION OF QUANTITIES
DETAILS OF MEASUREMENT AND
Explanatory notes
Description of item No. Length BreadthHeight Quantity
Item
m m
No.
1. Earthwork in excavation
in foundation
Main walls 0.80/2
2 8.30 0.80 0.90 11.95 8.30 7.50+2x
Long walls 0.80/2x
2 4.30 0.80 0.90 6.19 4.30 5 . 1 0 - 2
Short walls
Partition walls- x 0.80/2
3.00- 0.60 0.70 1.26 3.00 3.80 -2
Short wall
Verandah dwart wall 3.70 3.75+0.70/2-0.80/2
.70 0.60 0.70 1.56
Front, Long-Short wall. 0.60 135-0.70/2-0.80/2
Left side, Short wall 0.60 0.60 0.70 0.25
Total 21.20 cu m
foundation
Lime concrete in
Main walls 0.80/2
Long Walls 2 30 0.80 0.20 2.66 8.30 7.50 +2 x
0.80/2
Short walls 2 4.30 0.80 0.20 1.38 4.30 5.10-2 x
Partition wall
0.60 x 0.60/2
Short wall 3.20 0.20 0.39 3.20=3.80 -2
Verandah dwarf wall 3.75 3.75+0.60/2-060/2
Front, Long-Short wall 3.75 0.60 0.20 0.45
FULZ-
.
wg z I 09 0S
wSJU