NEW RISING MAIN FROM THE SITE BOUNDARY TO THE
ME
D
DI
Ø150mm @ 1:150 SURFACE WATER DRAINAGE
REC
RECEIVING PUBLIC SEWER IS TO BE INSTALLED BY TIO UPVC
N
NOTE: CAREFUL CO-ORDINATION WILL BE REQUIRED ONAS. ALLOW FOR A SURGE BREAK MANHOLE AND A
OF
FLO
TO ENSURE THAT THE OFF SITE WORKS ARE RI W Ø150mm @ 1:150
GRAVITY CONNECTION AT THE END OF THE RISING SI PERFORATED PIPE WITHIN
PROGRAMMED AND CONSTRUCTED IN ORDER TO
FACILITATE THE IFC WORKS SO THAT THE DOES NOT
MAIN. FOR INITIAL COSTING ASSUME THAT THE
RISING MAIN IS 180m LONG WITH AN ELEVATION OF
BY
ON
AS
NG
MA
IN
PERFORATED PIPE
GRANULAR TRENCH, SEE
DETAIL ON DRAWING No. C-702 REPUBLIC OF SENEGAL
COMPROMISE THE DRAINAGE WORKS TO THE IFC
BANK.
10m. THIS IS NOT CONFIRMED AND THIS INFORMATION
MUST BE PROVIDED BY THE LOCAL CONSULTANT.
TBC FWMH 04
CL (TBC)
IL (TBC) SERVICES SERVING THE
DEVELOPMENT ARE SHOWN
PROPOSED SURFACE WATER
RISING MAIN BY OTHERS CITY OF DAKAR
100Ø PERFORATED PIPE IN
INDICATIVELY AND TO BE PERMEABLE GEOTEXTILE AND
COORDINATED WITH SERVICE 100mm GRANULAR SURROUND
EACH SIDE (MIN. 0.45m OF
PROVIDERS BY GENERAL TOPSOIL COVER). ALL
FIRE HYDRANT SHOWN
INDICATIVELY (BY OTHERS).
CONTRACTOR PERFORATED LAND DRAINS TO
REFER TO MEP DRAWINGS FOR BE FITTED WITH RODDING
CONNECTION TO THE BUILDING. EYES AT TOP END OF RUN TO
ALLOW PERIODIC
SMH 2 CLEANNING/JETTING
WATER METER MANHOLE B1 CL (11.500)
AS
(800mm x 800mm x 700mm) SU
ME
IL (10.200) SURFACE WATER 1050Ø mm

HW
CL (11.47) D
DI
01 RE PRECAST CONCRETE
IL (10.77) CT
IO
SMH1 MANHOLE
N
OF
FL
CL (10.920)
OW
CAST IRON VENT FROM PUMPING
IL (9.822)
OUTLET WITH GRATINGS IN THE WALL,
STATION & PETROL INTERCEPTOR
TO TERMINATE ABOVE ROOF LEVEL.
25mm ABOVE THE SURFACE LEVEL. SURFACE WATER 450/600Ø mm
REFER TO ADJAYE DRAWINGS FOR
IL (10.53) PPIC MANHOLE
SETTING OUT. EXT06
EM 6
SURFACE WATER PACKAGE DESIGN ADJAYE ASSOCIATES
PUMPING STATION, DESIGN ARCHITECT:

ZONE 4
RISING MAIN WITHIN
PARAMETERS AS NOTED ON
RE PLAN 223-231 Old Marylebone Road
DEVELOPMENT BY IFC
CONTRACTOR.
1

3
London NW1 5QT
SLOT DRAIN (GRIDIRON FESSURA H100, OR EQUAL - +44 (0)20 7258 6140

4
5

http://www.gridiron.it/ita/vetrina/con_fessura_laterale-9-192.php)
EXT06 ACCESS FOR RODDING

OR
EM 6
ARCHITECT B.E.A.D / ID+EA PRO

CT
RA
CO AIN
SU FOUL WATER PIPE

NT
OF RECORD:

IFC M
MP

BY SI N G
@ OW
SUMP

80
111 Rue Joseph Gomis, 4e étage

1:3
0 Ø FL

RI
DRAINAGE TO GATE

15 VER
MECHANISM BY OTHERS. Dakar , Senegal

O
FOUL WATER MANHOLE +221 33 849 1920 / +221 33 822 4647
UPVC
Going to

.70
EXT06

9
IL (10.50) GGP-1
SWMH 24
STRUCTURAL,

IL
EM 6. SUMP EXISTING FOUL WATER SEWER AKT II

5@
PROVIDE NON-RETURN
(ASSUMED LOCATION)

22
VALVE IN MANHOLE
CL (11.04)
FACADE Consulting Structural and Civil Engineers
SWMH 28
EXT07 AND CIVIL 100 St John Street
IL (10.57) EXT01 CL (10.81) RE EXT06
:230 IL (9.60) 6. 20.0 x 4.0 x 1.6m DEEP GEOCELLULAR EXISTING FOUL WATER London EC1M 4EH
6.
EM
Ø@
1 SUMP EM 6 ATTENUATION TANK MANHOLE ENGINEERS:
SWMH 22 100 EMH 13 TOP OF TANK (8.75) +44 (0)20 7250 7777
CL (11.02) CL (11.08) BASE OF TANK (7.15) FULL RETENTION PETROL SEPARATOR
(ASSUMED LOCATION)
IL (9.50) IL (9.58) IL (9.88) STORAGE VOLUME: 122m3. MINIMUM DRAINAGE AREA = 1,590 m²
EXT06 CL (11.35)
EMH 12 EM 6.
IL (9.52)
RMC Dia 21mm RMC Dia 63mm INCOMING 225Ø IL (8.55) MECHANICAL INTERFACE ENGINEERING
PUMP STATTION VENT IL. 10.80 CL (11.02) KLARGESTER NSFA030, OR EQUAL DRAINAGE CHANNEL WITH ELECTRICAL
UPVC DIA 110 IL (9.88) EXT07 SWMH 12 EXISTING MANHOLE P/130 - 1.3m DEEP
STANDARD GRATINGS, SEE
SUMP EXT06 APPROX. GROUND LEVEL = 10.85m AOD
6.
CATCHPIT
CL (11.01)
VENT FROM ATTENUATION EM 6 APPROX. INVERT LEVEL = 9.55m AOD DETAIL ON DRAWING No. C-702 PLUMBING: 2000 M Street NW, Suite 270
IL (10.50) IL (9.40)
TANK, BOX WITH min. 150Ø @ 1:80 OVERFLOW FROM SUMP Washington, DC 20036
OVERFLOW IL. 10.60
IL (9.43) 380x310mm PEDESTRIAN MESH CATCHPIT TO ATTENUATION TANK DRAINAGE CHANNEL WITH + 1 (202) 370-9516
150 Ø @ 1:150 GRATING. AT IL 10.40. STONE INFILL, SEE DETAIL ON

0
1:8
UPVC DIA 150mm PERFORATED PIPE DRAWING No. C-702

@
EXT01

0
6. RE

@ 1:27

150 Ø OW
SUMP SUMP EM
9

15
1:2
COST BTKM QUANTITY SURVEYORS

L
DENOTES STANDARD

OVERF
EXT06 Ø@

150 Ø
SUMP 150 DRAINAGE SUMP OUTLET

SUM
EM
SWMH 23 EXT01 CAMERA FIXED AT CONSULTANT:

P
PUMP THE CORNER DENOTES GEOCELLULAR 129 Barry Hertzog Avenue
CL (11.02) MAX HEIGHT 3m CRATE SYSTEM FORMED IN
BLS - 6.
IL (7.10)
300Ø @ 1:80
FWMH 02 Emmerentia 2195, Johannesburg
SUMP (6.60) CL (11.48) IL 9.63. PROPRIETARY UNITS 1m LONG + 27 (0)11 646 9825
x 0.5m WIDE x 0.4m DEEP SUCH

ASSU
SWMH 11
SWMH 05 IL (10.08)
CATCHPIT P AS WAVIN AQUACELL PLUS OR

)
150 Ø @ 1:150

37

M
SUMP CATCHPIT RE

ED D
(9.
CL (11.02) 01 SIMILAR SUITABLE FOR USE AT
OVERFLOW

IL
IL (9.07) CL (11.39) EXT06

IREC
IL (8.59) EM 6
4.5m BELOW GROUND LEVEL LANDSCAPE GUSTAFSON PORTER

TION
ARCHITECT:

)
08
150 Ø @ 1:120 FWMH 01 IL (8.79)

(9.

OF FL
CAMERA FIXED AT IL (10.50) EXT04 1 Cobham Mews, Agar Grove

IL
EXT04 EXT04 CL (11.54)
SUPPORT SUMP 1:80

OW
46. 46 46 46 46. EXT04 IL (10.22) Ø@ NEW CONNECTION FROM London NW1 9SB
MAX HEIGHT 3m EXT04 150 RACEWAYS - LANDSCAPE LIGHTS
SWMH 21
EXT04 MANHOLE FWMH 02 TO THE - DIA 27mm - PVC + 44 (0)207 284 8950
IL (9.75) EXT04 46. CL (11.48)

SUMP
EXT07 46. 46. IL (9.55) EXISTING PUBLIC SEWER IS
EXT06
45.
EXT04 46. 100 Ø EM 6 TO BE INSTALLED BY ONAS.
RACEWAYS - SECURITY LIGHTS
EXT04 46.
EXT06
ONAS TO MAKE GOOD
EXT01 & EXT09 - DIA 27mm - PVC
LIGHTING DHA DESIGNS

SUMP
EMH 11

E
PIP
CL (11.49) EXT04 EXT04 EM 6 EXISTING MANHOLE. DESIGNERS:

ED
46 Studio 4, Cole street Studios

AT
IL (9.88) EXT04 46

150 Ø @ 1:80
OR
IL (9.23) EXT07 45. EXT04 46 EXT04 6/8 Cole Street, London SE1 4YH

RF
46 EXT04 RACEWAYS - PERIMETER FENCE

PE
46
46 + 44 (0)20 7939 0920
LIGHTS EXT06 - IN 27mm Dia - PVC

SUMP
EXT04 EXT04 SUMP
46 46
110 Ø

17
6. IL (9.83) EXT04 EXT04 EXT06 RACEWAYS - HANDRAILS AND PLANTER
EXT01 46 46 EM 6 ACOUSTIC SANDY BROWN

MP
EM EXT04 EXT05 & EXT07 - DIA 27mm - PVC

SU
ACCESS TO SLUDGE LINE SUMP
EXT06
EM 6
CONSULTANTS:
EXT04 BY MEP DETAILS.
55 Charterhouse Street
SWMH 20 London EC1M 6HA
150 Ø RACEWAYS - GARAGE RAMP LIGHTS
LOCAL WATER SUPPLY CATCHPIT
SEN EAU IL (10.33) CL (11.49) EXT10 - IN 27mm Dia - PVC + 44 (0)20 7549 3500
CPVC Dia 110mm RMC External FOUL WATER FROM BASEMENT. IL (9.75)
DUCT TO CONTROL PANEL LOCATED DIAM IN 21mm
INVERT LEVEL 10.31.
INSIDE THE BUILDING. EXTENT OF BASMENT UNDER. Back to 'BNP1'
ELECTRICAL MANHOLE (EMH)
PETROL SEPARATOR
ALARM CABLE EXT06
EM 6
FOOD MARYANN PHILLIPS

225 Ø
CAMERA FIXED AT
EXT06
EM 6
CONSULTANT:
Johannesburg

@ 1:1
SUPPORT CAMERA CCTV

400 Ø INTERNA
FROM
MAX HEIGHT 3m South Africa

0
IL (9.99)

50
1:6
+ 27 (0)82 875 2278

@ 1:5
@
EXT01 SUMP


EM 100Ø LAID FLAT, IL (10.40) EXT01
15

3 OV ANK
6. EM
MP

ERFL
LT
SU

OW
100Ø LAID FLAT, IL (10.40) EXT06
SUMP
EM 6

EXT06
SUMP EM 6
9)

Rev Date Description


9.4

EMH 10
(

IL

150 Ø
IL

(9. CL (10.68)

PERF
55
) IL (9.88)

@
ORAT
A 13/10/2021 SITE COORDINATION

1:92
PERFORATED
150 Ø @ 1:150

ED P
IPE
15
PIPE

0Ø EXT06
@ EM 6
1:8 IL (9.88)
0 EXT02 45. EXT06
22

45 EM 6
1:8

EXT04
@

45. EMH 03 6.

CL (11.44)
11

IL (10.64)

100 Ø @ 1:150 110 Ø @


PERFORATED PIPE SWMH 09 1:80
CATCHPIT SWMH 19 EXT06
CL (11.95) EXT04 CATCHPIT EM 6
6. IL (9.65) 45. 6. CL (11.44) SUMP
EXT01 EXT06
EXT04 EXT01 IL OUTLET (10.00)
EM RMC External EM EM 6
BNP1 - 45. 46. IL INLET (10.50)

P6 P1

150 Ø RATED

PERF
40
EXT02 SWMH 18 SUMP

@ 1:1
PERFORATED PIPE

O
SWMH 10 CL (11.45)
150 Ø @ 1:150

CATCHPIT A

50
IL (9.95)

150
CL (11.54) EXT04 SUMP

PIPE
IL (9.72) 46. EXT06
IL (
)
.30

EM 6
1
(10

0.3

CAMERA FIXED AT 100 Ø @ 1:150 OVERFLOW FROM SURFACE WATER


IL

0)

PERFORATED PIPE EXT06


MP

SUPPORT TANK IN BASEMENT.


SWMH 17 EM 6 P5 P2
SU

MAX HEIGHT 3m IL 10.57.


CATCHPIT

225 Ø @
FLOW DEFINED BY INTERFACE BREAKLINE
SU CL (11.44)
MP ENGINEERING.
6. IL (9.80)
IL (10.44)

1:150
EXT01 SWMH 16 FUEL FILL STATION
EM CL (11.44) IL ( 12.45)
BREAKLINE IL (10.49) IL (9.95) EXT06
QSM EM 6

J
BLS-7 EXT06
IL (10.10) EM 6 P4 P3

110

SUMP
10

4
Ø@

CAMERA FIXED AT
1:3

THE CORNER

150 Ø
PERF
8

SWMH 27 MAX HEIGHT 3m KEY PLAN


CL (11.67) 100Ø LAID FLAT, IL (10.40)

ORA

@ 1:1
RE 100Ø LAID FLAT, IL (10.40)

ASSU
IL (10.60) RMC External
CL (11.81) VSAT ENCLOSURE

TED
IL (9.73)

MED
50
FFL = 11.81 Dia 21mm CHILLED WATER PIPE

IL (11.00)
EMH 09 SWMH 08

PIPE

DIREC
10

CL (11.67) 100 Ø @ 1:150 CL (11.55)


PPR DIA 160
IL 10.10
6.
EXT01 100% CONSTRUCTION DOCUMENTS

TION
P IL (9.88) PERFORATED PIPE IL (9.77)
BY ERM EXT03 EM EXT06

100 Ø
STEEL PIPE Ø 50
RE

OF FL
AR E A 45. EM 6

100 Ø
10

CL (11.81) C H BL
IT E S

OW
IL (11.00) EC U
T RFA FWMH 04
CE CL (11.55)
RE
CL (11.71)
FFL = 11.71 IL (10.70) FWMH 06
CL (11.51)
IL (9.77) SUMP RE
CL (11.45)
Project : International Finance Corporation
IL (11.00) IL (10.58) EMH 08 IL (10.60)

RE
CL (10.68) FOUL WATER CONNECTION TO
10

SS SU 1 EXT03 CL (11.40)
MP 00 Ø IL (9.88) INTERNAL DRAINAGE, IL (10.30).
IL (10.60)
45.

RE
CL (11.71) FG
FG
SS SS
@
1:6
3 IL (9.79)
110 Ø @ 1:70
EXT04
45. LOW VOLTAGE CABLE
2 CABLES
FROM TOPO SURVEY
CL (11.330)
IL (9.900)
Drawing Title: SITE COORDINATION
FG SECTION 8.4mm2 DEPTH (1.430)
IL (11.00)
FG
RWP
FG
FG
FWMH 05
CL (11.51)
SWMH 26
IL (10.10) MEP
3

IL (10.50)
FG FWMH 03 CL (11.47)
4

FG
CL (11.55) IL (10.65) EXT04 SUMP
IL (10.70) EXT02 45.
SS 45.
FFL 11.55 EXT04 DRAINAGE TO GATE
46.
MECHANISM BY OTHERS
PERFORATED PIPE

0
1:10 EMH 04
Ø@

S-100
CL (11.63)
150 Ø @ 1:150

110 To GGP2
EXT02
45.
IL (9.88) Drawing No: Rev:
EXT04 SWMH 15
46. 6. CL (11.75)
EXT01 IL (10.25) SUMP
EM COMPANY OF
N
EXT06
IL. 10.10
RMC Dia 63 EXECUTION Scale: As Indicated Date: 13/10/2021
EM 6 GENERALE D'ENTREPRISES
RMC Dia 21
EXT09

ZONE 1
EXT06
6. Km11, ROUTE DE RUFISQUE

150 Ø @ 1:16
EM 6 EM
IL (8.97)
BP 8782 DAKAR SENEGAL Drawn By: Checked by:
SUMP
100Ø LAID FLAT, IL (10.40) CAMERA FIXED AT Téléphone : (+221) 33 839 83 83
THE CORNER

PERFORATED PIPE
EXT06 MAX HEIGHT 3m Télécopie : (+221) 33 834 16 04
EM 6 IL (8.98) DRAINAGE TO GATE E-mail : gesenegal@orange.sn
EXT06 MECHANISM BY OTHERS.
EM 6 6.
RMC Dia 21 EXT06
SWMH 07 EM 223-231 OLD MARYLEBONE ROAD LONDON NW1 5QT UNITED KINGDOM
EXT06
CL (11.45)
100Ø LAID FLAT, IL (10.40) TEL: +44 (0)20 7258 6140 | FAX +44 (0)20 7258 6148 INFO@ADJAYE.COM
IL (9.90)
EM 6 E SWMH 04
02 EMH 05 CL (11.42)
CL (10.68) 6. EXT01 IL (9.01)
EXT06 IL (9.88) EM 6.
EM 6 EXT06
EM
EXT10 EXT10 EXT10 EXT10 EXT10 EXT10 6. EXT10 EXT10 SUMP
150 Ø
6. EM 6. EM 6. EM 6.
EM 6. EM EM 6. EM 6. IL (9.04)
EMH 06 EM SWMH 14
SUMP
CL (10.68) CL (11.04)
EXT06 IL (9.88) LOW VOLTAGE CABLE IL (9.45)
2 CABLES
PE

EM 6 6.
RF

EXT06 FROM RAMP DRAINAGE IL (7.55) SECTION 8.4mm2 10 EXT06


OR

1:1
15

EM 6 RODDING POINT FROM SLOT DUCT TO CONTROL PANEL FOR IL (6.923)


AT

EM

@
E

DRAINAGE CHANNEL AS CLOSE PUMPING STATION LOCATED INSIDE 5Ø


D
@

DIESEL TANK SHOWN INDICATIVELY. 22


PIP

AS POSSIBLE TO THE EXTERNAL


1:1

THE BUILDING. EMH 03


E

BUNDED ANTI-SPILL (SELF


20

BEND. CL (10.94)
CONTAINED SPECIALISTS FUEL TOP
UP SYSTEM AT HEAD OF RAMP IL (9.88)
MEDIUM VOLTAGE CABLE SWMH 03
RMC External EMH 01 12 CABLES IL (10.40)
EXT06 Dia 63 EXTENT OF BASMENT UNDER. CL (10.94) 6.
CL (10.68) GOING TO MD-1
EM 6 To Pump Station IL (9.12) EXT06
EXT06 IL (9.88) SECTION (500mm2, 120mm2)
SWMH 06 EM
EM 6 CL (11.34) IL (6.923)
IL (10.00) SUMP

RMC External
EXT02 Dia 21mm 5
Power Supply
45. Reservation for 6.
EXT06 ventilation of the Room GGP2-24 EXT06
EXT06 EM
EM 6
EM 6 EXT02
45. EXT02
45. 50
1:1
225

EXT02 RMC External


@
5Ø Dia 21mm
Ø@

SWMH 01 45.
22 IL (10.20)
Back to East
CL (11.16)
1:1

QSM
EMH 07

ZONE 3
IL (9.66) Guard House
50

150 Ø @ 1:66 E 6.
CL (11.16) 01 EXT06
IL (9.88) EM
EXT06 PERFORATED PIPE EXT03
EM 6 45.
EXT06
EXT02 SWMH 02
EM 6 SWMH 13
45. 150 Ø CATCHPIT
CL (10.86)
CL (11.01)
SWMH 25 .2 IL (9.87)
6. 10 IL (9.20) 6.
PACKAGE PUMPING STATION IL
'BNP2-14' EXT09 MP EXT06
1.2m Ø + 0.3m CONCRETE 0@ SU EM
SURROUND. 'BNP2-15'
EM 10 EXT03
CL (10.90) EXT06 45.
IL (7.45) EM 6 FOP-1
EXT06
PE AR

SUMP (6.95) EXT03


IL:

BY
RM CH

PUMP 1 = 5 l/sec EM 6 EXT02 45.


7.4

EA ITE

45. 6.
5

BL CT

PUMP 2 = 5l/sec 3
1:4 EXT06
ES

LENGTH OF RISING MAIN ON @ EM


UR

ZONE 2
PLAN = 18m 0Ø
FA

15
10
CE

DESIGN HEAD = 2.3m


0 Ø

IL (1 FFL = 10.89
EXT06 0.06
)
EM 6
EXT06
MP RE IL (10.50)
EM 6 SU
IL (1 CL (10.89)
0.12 VENT FROM PUMPING STATION.
RE ) IL (10.30)
SETTING OUT BY ARCHITECT.
EXT03 CL (10.95)
45. IL (10.20)
10

EXT06
EM 6 RE
EXT06 CL (10.89)
PE Y AR

EMH 02
10
RM CH

EM 6 IL (10.30)
B

CL (10.93)
EA IT
BL EC

IL (9.88)
E T

RE
SU
RF

CL (10.98)
100 Ø

AC

IL (10.30)
E

FFL = 10.98
RE
CL (10.98)
IL (10.30) CAMERA FIXED AT
THE CORNER
MAX HEIGHT 3m