1. Apa pertimbangan meletakkan bypass setelah pressure vessel?

dengan sistem yang demikian artinya 1 vessel akan mensuplai 2 sistem apabila 1 line compressor mengalami trouble? apakah tidak sebaiknya dbypass disebelum vessel?
2. Tolong diperjelas material A516 yang digunakan grade berapa?

3/11/22

4 31/10/22 FOR APPROVAL YNR ZFK JHD

3 28/10/22 FOR APPROVAL YNR ZFK JHD


2 22/09/22 FOR APPROVAL YNR ZFK JHD

1 25/08/22 FOR APPROVAL YNR ZFK JHD

0 25/07/22 FOR APPROVAL YNR ZFK JHD

REV. DATE DESCRIPTION PREP CHECK APPROVAL

PT. PEMBANGKITAN JAWA-BALI

PENGADAAN BARANG / JASA


RELOKASI PEMBANGKIT KE HALMAHERA TIMUR

P&ID FOR PRESSURIZED AIR SYSTEM

DATE SIGNATURE CHECK SCALE SHEET OF

DRAWN 31/10/22 ARF ZFK


1:500 -/-
JOB NO. 22420

DWG No: 22420 - 00 - I - 76 - CM - 000