CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH

INCIDENT INVESTIGATION & ANALYSIS REPORT


Form No: HSEMS – 05 – 01B

(A)INTRODUCTION / PROJECT DETAILS

Main Contractor China State Construction Engineering Corporation

Project Title Bulim Infra (Phase 1)

Workplace Number JTC000ETT18300189

Location Of Project Bulim Square. 1 Bulim Lane 2 648110

Direct Subcontractor Zhao Yang Geotechnic

Activities Of Trade Works Anchor Bolting Works

2nd Tier Subcontractor NA

 NA


 NA

(B) INCIDENT CLASSIFICATION

Dangerous Occurrence
 Near miss Damage to property/Equipment Fire

Loss Time Incident Security violation Damage to utilities Crime

Environmental harm Road incident Other occurrence First Aid

MOM Reported: Yes No

Date of Reporting 16-02-2024

(C) DETAILS OF INCIDENT


1|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

Date of Incident 16-02-2024 Time of Incident Approximately 1330hrs

Name of Injured NA Trade/Company NA

WP/FIN No NA Date of Birth NA

Name of Supervisor Velayutham Dhayanithi Company Zhao Yang Geotechnic

Name of Co-worker (1) Rahaman Lutfur Company Zhao Yang Geotechnic

Name of Co-worker (2) Sundarraj Sugangtharaj Company Zhao Yang Geotechnic

 NA NA


 NA NA

(D)DESCRIPTION OF INCIDENT

On 16th February at around 1330hrs, Rahaman Lutfur was instructed by his supervisor Velayutham Dhayanithi to carried out gas cutting
(E)
works at Section J on a scaffold platform. However, his supervisor Velayutham Dhayanithi and Safety Coordinator Sundarraj C
Sugangtharaj did not carry out their duties by checking and ensuring that Rahaman Lutfur was provided with a safe working platform.
Rahaman Lutfur, being without any supervision, carried on his gas cutting works on a scaffold platform that was in the process of
dismantling.

CSEC Safety Personnel observed the unsafe act and issued a Near Miss Notification.

HRONOLOGY OF MEDICAL ATTENTIONS

2|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

In-house External
Government No of Medical No of Light
Date Medical Medical Annex
Hospital Leaves Duties
Institution Institution
NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

NA NA NA NA NA NA NA

*Attach Medical Report (If any) together with MCs and attribute an Annex that cross reference to the date
of individual medical consultation

3|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

(F) INTERVIEW STATEMENTS FOR PERSONNEL IN PROXIMITY TO THE INCIDENT


Name of interviewee :
Rahaman Lutfur:
On 16th Feb 2024, at around 1330hrs I was instructed by my site supervisor Velayutham Dhayanithi to carry out gas cutting works using
scaffold platform at Section J. When I reached my work area, I saw that the scaffold platform was in already dismantled. Both my site
supervisor and my Safety Coordinator was not present to advise me on how to carry out my work activities. I then proceeded to carry out
my Gas Cutting Works despite the scaffold in the process of dismantling.

Annex: Attribute an Annex for the interview statement (HSEMS 05-02A)


Name of interviewee :
NA

Annex:Attribute an Annex for the interview statement (HSEMS 05-02A)

4|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

(G) ANALYZING THE INTERVIEW STATEMENTS


Based on the statement given by Rahaman Lutfur, the following can be derived:
- Site Supervisor Velayutham Dhayanithi failed to assess the work area of his worker before giving instructions.
- Site Supervisor Velayutham Dhayanithi failed to ensure check and ensure that a proper work platform is provided.
- Safety Coordinator Sundarraj Sugangtharaj failed to carry out his duty of inspecting the work area .

(H)PHOTOGRAPHS OF RE-ENACTMENT

5|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

(I) ANTECEDENT RECORDS


- RA Briefing Conducted.
- Training on WAH Conduted.

(J) ANALYSIS ON PROBABLE CAUSE OF INCIDENT


Was worker trained in the trade ? Were Safe Work Procedures available & given to foreman for briefing to the injured
during Tool Box Meetings ? Were the safety provisions in place? Any machinery failure?,etc
Method –Is there a need to change the work method that was used?

Materials/ Machines –Is there a need to review the equipment to be used for the works?

Man – Is there a need to monitor the workers level of competency for the works?

Management –Is there a need to review existing policies?

Environment –Is there a need to review the environment used for the works?

 Others – Refer to Conclusion for more details


NCLUSION OF INCIDENT

(K) CONCLUSION OF INCIDENT


Not working in accordance to Safe Work Procedure. Improper working platform.

6|Page
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION LIMITED SINGAPORE BRANCH
INCIDENT INVESTIGATION & ANALYSIS REPORT
Form No: HSEMS – 05 – 01B

(L) RECOMMENDATIONS TO PREVENT RECURRENCE


- Safety Timeout shall be carried out.
- Both the Safety Coordinator and Site Supervisor was reprimanded.
- Site Supervisor and Safety Coordinator shall take a photo of the scaffold platform twice a day with date and time. One
in the morning and One in the Afternoon after Lunch Time and post it inside Zhao Yang WhatsApp Group.

(M) AUTHORISED SIGNATORIES


Report Prepared & Submitted By WSHO : Report Reviewed & Approved By Project
Manager:

Name / Signature / Date: Name / Signature / Date:


Addien Wardiman Bin Wardi Subandiono Ang Yik Cher
20-02-2024 20-02-2024